Jump to main content.


Rule Title: Monitoring systems: Verification of operational status

Agency
Nevada Administrative Code
Affected Area
Agency-Wide Provisions
Regulation
Nac, Chapter 445B, Chapter 445, Air Controls – General Provisions
Rule #
445B.258
Adoption Date
09/06/2006
Submittal Date
12/08/2006
Final Federal Register Date
04/20/2007
Federal Register Citation #
72 FR 19801

Nac, Chapter 445B, Chapter 445, Air Controls – General Provisions (doc, 58 KB)

NAC 445B.258 [445.685] Monitoring systems: Verification of operational status. 2. All continuous monitoring systems and monitoring devices must be installed and operational prior to conducting performance tests under NAC 445B.252. Verification of operational status must, as a minimum, consist of the following: (a) For continuous monitoring systems referred to in subsection 2 of NAC 445B.259, completion of the conditioning period specified by applicable requirements in Appendix B of 40 C.F.R. 60. (b) For continuous monitoring systems referred to in NAC 445B.260, completion of 7 days of operation. (c) For monitoring devices referred to in NAC 445B.256 to 445B.267, inclusive, completion of the manufacturer’s written requirements or recommendations for checking the operation or calibration of the device. [Environmental Comm’n, Air Quality Reg. 2.17.1-2.17.2.3, eff. 12-4-76]—(Substituted in revision for NAC 445.685)

This SIP Citation Was Last Modified on January 29, 2013. EPA has attempted to assure that the action logs accurately reflect the actions published in the Federal Register. If there are discrepancies, however, the Federal Register is the official record. Send State Implementation Plan comments and questions to wilder.ceciley@epa.gov.

Region 9 Topics and Programs | A-Z Index


Local Navigation


Jump to main content.