Jump to main content or area navigation.

Contact Us

Pacific Southwest, Region 9: Superfund

Serving Arizona, California, Hawaii, Nevada, the Pacific Islands, and Tribal Nations

Omega Chemical Corporation

EPA #: CAD042245001

State: California(CA)

County: Los Angeles

City: Whittier

Congressional District: 34 and 39

Other Names:

Bulletin Board

Links

Description and History

NPL Listing History

NPL Status: Final

Proposed Date: 09/29/98

Final Date: 01/19/99

Deleted Date:

INTRODUCTION

The Omega Chemical Corporation facility was located at 12504 and 12512 East Whittier Boulevard in Whittier, California (former Omega property), and was a refrigerant and solvent recycling, reformulation and treatment facility that operated from approximately 1976 to 1991. Drums and bulk loads of waste solvents and other chemicals from various industrial activities were processed at the facility. As a result of the operations and spills and leaks of various chemicals, the soil and groundwater beneath the former Omega property became contaminated with high concentrations of tetrachloroethylene (PCE), trichloroethylene (TCE), Freons 11 and 113 and other contaminants. Contaminated groundwater extends four and one-half miles downgradient (south/southwest) of the former Omega facility. In January 1999, EPA placed the Omega Chemical Corporation Superfund Site (Omega Site) on its National Priorities List.

EPA manages the Omega Site as three operable units (OUs): OU-1 includes the contaminated soil and groundwater at and in the immediate vicinity of the former Omega property; OU-2 is composed of groundwater contamination outside and generally downgradient (south-southwest) of OU-1; and OU-3 addresses vapor intrusion from the Omega Site that has occurred in several buildings on and in close proximity to the former Omega facility. Vapor intrusion is the process by which contaminant vapors in the soil and/or groundwater migrate through subsurface soils and enter overlying buildings.

Top of page

Contaminants and Risks

Contaminated Media
  • Groundwater
  • Air
  • Soil and Sludges

Subsurface soil and groundwater at the Omega Site contain a variety of volatile organic compounds (VOCs) including PCE, TCE and Freon. As a result of an EPA drum removal action during 1995-96, the primary source of the contamination has been removed from the former Omega Property and that area is fenced off from public access. EPA is taking action to ensure that no one is exposed to unsafe levels of hazardous substances associated with the Omega Site. Without proper action and attention to the contamination associated with this site, people may come into direct contact with contaminated soils or groundwater and may suffer adverse health effects as a result.

Top of page

Who is Involved

The Omega Site is being addressed through Federal and potentially responsible parties’ actions.

Top of page

Investigation and Cleanup Activities

Contamination at the Omega Site is being addressed through both non-time critical removal action and remedial action authorities under the Federal Superfund law (the full name of the Superfund law is the Comprehensive Environmental, Response, Compensation, and Liability Act, “CERCLA”).

Initial Actions

BACKGROUND AND INITIAL ACTIONS


Prior to 1995, the lead regulatory agency for the former Omega facility was the State of California Department of Toxic Substances Control (DTSC). During the 1980's, several assessments of subsurface conditions were performed, including sampling of soil gas and groundwater. In 1987, a 500-gallon underground storage tank was removed. From 1991 through 1994, DTSC, with EPA's Superfund Division support, actively pursued the owner/operator of the Omega facility to remove the wastes and cleanup the Omega Site. Because the owner/operator failed to address releases and threats of releases of hazardous substances at the Omega Site, DTSC requested that EPA’s Emergency Response Section assess the need for a removal action at the Omega Site. Through this site assessment, EPA determined that a removal action was necessary and issued an Action Memorandum on May 3, 1995. On May 9, 1995, EPA issued a Unilateral Administrative Order (UAO) to approximately 170 major generator potentially responsible parties (PRPs), all of whom sent 10 tons or greater of hazardous materials to the former Omega property, to perform removal activities at the Site. These major contributing parties thereafter formed a workgroup called the Omega Chemical Site Potentially Responsible Parties Organized Group, or “OPOG”. During 1995, EPA oversaw removal activities performed by the PRPs under the 1995 UAO that included the removal and off-site treatment of approximately 3,000 drums of hazardous waste, 60 cubic yards of hardened resin material, hundreds of empty contaminated drums, numerous cylinders and various other smaller containers. The UAO also required emptying two rainwater sumps and four evaporators, cleaning two cooling towers, removal of 67 refrigerant gas cylinders, decontamination of remaining equipment and structures, and disposal of 40,000 gallons of rinsate and decontamination water.

In 1996, OPOG, with EPA oversight, undertook the collection and analyses of some preliminary subsurface soil and groundwater samples at the former Omega property and surrounding locations. Investigation work in 1996 consisted of conducting a shallow soil gas survey at the former Omega property that included 31 samples collected at three different depths. This soil gas survey allowed for further analysis of the Omega Site's geology and hydrogeology, and the identification of any materials considered "grossly contaminated." The only grossly contaminated material identified was near-surface soil contained within the loading dock sump; that material was excavated and removed from the former Omega property. A preliminary groundwater investigation conducted in 1996 concluded that elevated levels of volatile organic compounds were present in groundwater downgradient of the former Omega property.

To better manage large site cleanups, EPA addresses a Site by designating Operable Units (OUs) which represent discrete elements of the overall site cleanup. The Omega Site has three OUs: OU-1 addresses the contaminated soil and groundwater in the immediate vicinity of the former Omega Chemical facility; OU-2 addresses the contaminated ground-water downgradient of OU-1 that has been impacted by contamination from the Omega facility; and OU-3 addresses vapor intrusion from the Omega Site that has occurred in several buildings on and in close proximity to the former Omega facility.

Groundwater within the OU-2 area is used as a source of drinking water by several municipal and private water purveyors. Most of the drinking water wells located in the OU-2 area draw water primarily from deeper portions of the aquifer from depths at or greater than 200 feet below ground surface (bgs) and are not currently impacted by groundwater contamination. However, a few drinking water wells in the area draw water at about the 200 feet bgs level and have had some contaminants detected. These wells are currently equipped with wellhead treatment units which are comprised of granular activated carbon (GAC) filters. The GAC filters remove the contaminants from the water to ensure that it meets drinking water standards. Drinking water for the Cities of Whittier, Santa Fe and Norwalk is tested regularly prior to distribution to the public to ensure that all tap water meets State and Federal drinking water standards.

Site Studies

OPERABLE UNIT 1: SOIL AND GROUNDWATER AT OR NEAR THE FORMER OMEGA PROPERTY INVESTIGATION

On April 1, 1999, EPA issued Special Notice Letters to the PRP group and commenced negotiations for the performance of additional work at the Omega Site. On February 28, 2001, a Partial Consent Decree was entered by the United States District Court memorializing the terms of this agreement. Under this agreement, the Settling Defendants agreed to pay a portion of past costs and perform the following work at the Omega Site:

1) Implementation of a Remedial Investigation / Feasibility Study (“RI/FS”) for contamination in the vadose zone (i.e., the soil) within the “Phase 1A area” of the Omega Site. The “Phase 1A” area includes soil and groundwater contamination on and near the former Omega property. The Phase 1A area is also known as OU-1;

2) Performance of an Engineering Evaluation and Cost Analysis (“EE/CA”) addressing groundwater contamination in the Phase 1A area;

3) Implementation of the response action selected in EPA’s Action Memorandum at the conclusion of the EE/CA;

4) Performance of a risk assessment within the Phase 1A area; and

5) Installation of up to three groundwater monitoring wells at locations downgradient of the Phase 1A area and upgradient of the City of Santa Fe Springs water supply well.

In early 1999, OPOG undertook additional field investigation activities with EPA oversight. Field activities included the installation of three groundwater monitoring wells immediately downgradient of the former Omega property; collection of soil and soil gas samples from each well boring, and the collection of groundwater samples for laboratory analysis. Aquifer tests were also performed on the newly-installed wells. In August 2001 and March 2002, OPOG installed another three monitoring wells, including one well located on the upgradient (northeast) side of the former Omega property. Work under the Partial Consent Decree is conducted under EPA oversight.

OPOG completed a work plan to implement the OU-1 vadose zone RI/FS, which was approved by EPA in September 2003. Additional work plan addenda were also submitted to EPA to support supplemental data collection. Data collection for the OU-1 RI was completed in 2006 and the RI report was completed in November 2007. The OU-1 FS report was completed in May 2008.

OPERABLE UNIT-2: GROUNDWATER INVESTIGATION

In August 2010, EPA completed an OU-2 RI/FS, which evaluates the nature and extent of OU-2 groundwater contamination, assesses the potential risks posed by this contamination to human health and the environment, and develops and evaluates alternative remedial actions to address the contaminated groundwater.

OPERABLE UNIT 3: INDOOR AIR AT OR NEAR THE FORMER OMEGA PROPERTY INVESTIGATION

In 2004, indoor air samples from buildings on and near the former Omega property were evaluated for vapor intrusion from contaminated soil and groundwater. In April 2006, EPA issued an Action Memorandum to address indoor air contamination at the Skateland property by implementing a sub-slab depressurization (SSD) system. OPOG organized and funded the purchase of the Skateland property in September 2006 and implemented an EPA-approved response action that permanently discontinued its use as a commercial building.

After further studies. it was found that vapor intrusion was occurring in other buildings within or near OU-1. EPA entered into an agreement with OPOG in 2009 to address indoor air contamination at other buildings. Under the agreement, OPOG has taken a number of actions and has installed two interim Soil Vapor Extraction Systems (SVE), to address vapor intrusion at buildings in and near the OU-1 area. These actions will be consistent with (and in some respects are an early start on) the long-term cleanup of the OU-1 soils. As of 2012, nearly 7,000 pounds of contaminants have been removed with the two Interim SVE systems. The 2009 agreement requires OPOG to continue periodic indoor air monitoring in several buildings near the former Omega facility. EPA oversees OPOG’s OU-3 work. Once OU-1 remedy is constructed and operating, the interim cleanup systems for OU-3 will no longer be needed.

Remedy Selected

OPERABLE UNIT-1: SOIL AND GROUNDWATER AT OR NEAR THE FORMER OMEGA PROPERTY RECORD OF DECISION

In 2005, OPOG with EPA oversight completed a Environmental Evaluation/Cost Analysis (EE/CA), which evaluated potential response actions for groundwater contamination within the OU-1. Cleanup alternatives evaluated in the EE/CA are summarized in EPA's Proposed Plan dated August 2005. EPA issued an Action Memorandum in September 2005, which authorized construction and operation of a groundwater pump and treatment system based on the results of the EE/CA. Construction of the pump and treatment system was completed in 2009, after which the system began operating.

In September 2008, EPA issued a Record of Decision (ROD) selecting a soil cleanup remedy for OU-1. The remedial action selected in the ROD consists of a soil vapor extraction (SVE) system to remove and treat the chemical vapors in the soil within OU-1. A series of SVE wells will be used to pull the contaminant vapors out of the soil and into a granular activated carbon (GAC) filter. Once the contaminants are removed by the GAC filter, the clean air created through this process will be released into the atmosphere.

OPERABLE UNIT-2: GROUNDWATER RECORD OF DECISION

In August 2010, EPA completed an OU-2 RI/FS, which evaluates the nature and extent of OU-2 groundwater contamination, assesses the potential risks posed by this contamination to human health and the environment, and develops and evaluates alternative remedial actions to address the contaminated groundwater. EPA issued a Proposed Plan for OU-2 that identified its preferred interim groundwater containment remedy. An interim remedy can be put in place in a more timely manner than a full final cleanup remedy. EPA held public meetings and received public comment from August 23rd through November 22, 2010 which includes two extensions.

After considering public comments, EPA selected an interim remedy to capture, contain, and treat contaminated groundwater. The selected interim remedial action is presented in the Record of Decision (ROD) dated September 20, 2011 and can be found in the "Documents and Report Section" below. The overall objective of the interim remedy is to protect human health and the environment by preventing further spreading of the contaminated groundwater. A ROD fact sheet summarizing the decision can be found in the Fact Sheet Section below.

Remedy Design

OPERABLE UNIT 1: SOIL AND GROUNDWATER AT OR NEAR THE FORMER OMEGA PROPERTY REMEDIAL DESIGN

The final long term SVE system to fully clean up the soils is currently under construction. EPA is using a phased approach and the first phase is planned to be in operation by October 2014.

OPERABLE UNIT-2: GROUNDWATER REMEDY REMEDIAL DESIGN

As of October 2014, EPA is in negotiations to try to reach agreement with Potentially Responsible Parties at the site to design, construct, and operate the groundwater wells, water treatment systems, and other components of the remedy adopted in the 2011 ROD. It is expected that design of the remedy will begin in 2015.

Top of page

Cleanup Results to Date

With the removal of the over 2,700 drums and the grossly contaminated soils from the Omega Property, EPA removed an imminent threat to the environment and health of the public. Construction of a pump and treatment system to contain the high concentration groundwater contamination within the OU-1 was completed and began operating in 2009. The treated water is discharged to a nearby sanitary sewer. Two interim Soil Vapor Extraction (SVE) systems, were installed to address vapor intrusion at buildings in and near the OU-1 area. The first and second interim SVE systems were installed in June 2010 and March 2012, respectively. These systems have effectively reduced the concentrations of contaminants in the indoor air of the affected buildings.

Top of page

Potentially Responsible Parties

Potentially responsible parties (PRPs) refers to companies that are potentially responsible for generating, transporting, or disposing of the hazardous waste found at the site.


Top of page

Documents and Reports


Hide details for Administrative RecordsAdministrative Records
08/26/10Interim Remedy OU-2 Administrative Record (8-26-10)
12/02/11Interim Remedy OU-2 Administrative Record - Update 1 (12-2-11)
2005/2006 Oversight Costs Dispute, Supplement #1
Access Order AR, Remedial
Indoor Air Removal
Non-Time-Critical Removal Action
Non-Time-Critical Removal Supplement 1 & 2
Operable Unit #1
OU 01, Update #1
Oversight Costs Dispute Suppl #1
Remedial, Operable Unit 02 Interim Remedy, Suppl #2
Hide details for Community InvolvementCommunity Involvement
07/23/01Community Involvement Plan
Hide details for Fact SheetsFact Sheets
12/01/00Public Input Requested
07/01/01Consent Decree Signed--Work Begins at Omega Chemical Superfund Site (in English y en Espaņol)
04/01/02Progress at the Omega Chemical Superfund Site (in English y en Espaņol)
09/01/03Omega Chemical Superfund Site Update
11/01/04EPA Evaluates Indoor Air at Omega Chemical Site
08/01/05Proposed Plan for Interim Groundwater Action
01/01/07Omega Chemical Superfund Site Update
02/29/08Update on Site Activities
06/02/08Proposed Plan for Soil Cleanup
02/20/09EPA Selects Cleanup Plan for Soils at Omega Site
09/15/09EPA Issues Draft Remedial Investigation Report for Downgradient Plume at Omega Site
08/11/10Omega OU-2 Proposed Plan for the Groundwater Contamination, Comment Period from August 23-Sept. 21, 2010
08/30/10EPA Extends Public Comment Period on Proposal for Groundwater Cleanup at Omega Chemical Corporation Superfund Site, Operable Unit 2 August 23 - September 21, 2010
10/19/10EPA Extends Public Comment Period on Proposal for Groundwater Cleanup at Omega Chemical Corporation Superfund Site to November 22, 2010
11/17/11U.S. EPA "What You Should Know About Vapor Intrusion"
11/30/11EPA Selects Remedy for Groundwater Contamination at Operable Unit 2
03/14/13Tetrachloroethene (also known as perchloroethylene, PERC or tetrachloroethene) Information Fact Sheet
03/14/13Vapor Intrusion: Answers to Frequently Asked Health Questions Fact Sheet
03/21/13Public Outreach to Select Homeowners in Whittier, CA
Hide details for Legal DocumentsLegal Documents
02/28/01Partial Consent Decree
09/01/05De Minimis Settlement, Administrative Order on Consent, U.S. EPA Docket No. 2004-13
11/06/06Settlement Agreement
11/09/09Administrative Settlement Agreement and Order on Consent for Removal Action - Indoor Air
10/06/10Remedial Design Remedial Action Consent Decree OU-1 (without signatures)
Hide details for Records of DecisionRecords of Decision
09/27/05September 2005 Action Memo for OU-1 Groundwater
04/06/06April 2006 Action Memo for Indoor Air
09/01/08Record of Decision - Operable Unit 1( Soils) Omega Chemical Corporation Superfund Site Whittier, California
09/20/11Interim Action Record of Decision - Omega Chemical Corporation Superfund Site Operable Unit 2, Los Angeles County, California, 9/20/11
Hide details for Technical DocumentsTechnical Documents
06/01/03Phase 2 Groundwater Characterization Study
04/06/04Conceptual Cost Estimate for Sitewide Remedial Action
11/09/07Final Human Health Risk Assessment For On-Site Soils
11/14/07Final On-Site Soils Remedial Investigation Report - OU-1
05/21/08Final Feasibility Study for Onsite Soils OU1
06/04/09Draft Omega RI Report
08/01/10Final Remedial Investigation for Omega Chemical Operable Unit 2, August 2010 (Section 1 through Section 9)
08/01/10Final Remedial Investigation for Omega Chemical Operable Unit 2, August 2010 (Appendices)
08/01/10Final Remedial Investigation for Omega Chemical Operable Unit 2, August 2010 .(Appendices A to N, excluding F)
05/01/12Groundwater Monitoring Report for 2008 and 2009
06/01/12Groundwater Monitoring Report for 2010 and 2011
08/01/12MW32 Well Installation and Sampling Report

Top of page

Community Involvement

Public Meetings:

Top of page

Public Information Repositories

The public information repositories for the site are at the following locations:

Whittier Public Library
7344 S. Washington Avenue
Whittier, CA 90602
(562) 567-9900
Ask for the Omega Site information at the
Reference Desk

The most complete collection of documents is the official EPA site file, maintained at the following location:

Superfund Records Center

Mail Stop SFD-7C

95 Hawthorne Street, Room 403

San Francisco, CA 94105

(415) 820-4700

Enter main lobby of 75 Hawthorne street, go to 4th floor of South Wing Annex.

Additional Links

Top of page

Contacts

EPA Site Manager
David Stensby
Wayne Praskins
415-972-3246
415-972-3181
Stensby.David@epamail.epa.gov
Praskins.Wayne@epamail.epa.gov
US EPA Region 9
Mail Code SFD
75 Hawthorne Street
San Francisco, CA 94105
EPA Community Involvement Coordinator
Jackie Lane
415-972-3236
1-800-231-3075
Lane.Jackie@epamail.epa.gov
US EPA Region 9
Mail Code SFD
75 Hawthorne Street
San Francisco, CA 94105
EPA Public Information Center
415-947-8701
r9.info@epa.gov
State Contact
Stephanie Lewis, CA DTSC
818-717-6616
SLewis1@dtsc.ca.gov
Chatsworth Field Office
9211 Oakdale Avenue
Chatsworth, CA 91311-6505
PRP Contact
Ed Modiano, De Maximis, Inc.
619-546-8377
edm@demaximis.com
1322 Scott Street, Suite 104
San Diego, CA 92106
Community Contact
Other Contacts
After Hours (Emergency Response)
US EPA
(800) 424-8802

Top of page



Jump to main content.