Description and History

NPL Listing History

NPL Status: Final

Proposed Date: 06/24/88

Final Date: 03/31/89

Deleted Date:

The Modesto Ground Water Contamination site is related to a dry cleaning facility that leaked tetrachloroethylene (PCE) into the soil and ground water. The dry cleaning facility discharged wastewater containing PCE into the sewer system for approximately 50 years, and an unknown quantity of PCE was released into the subsurface. The old leaky dry cleaning equipment has been replaced with new equipment, and PCE is no longer being discharged from the facility. The dry cleaner is located approximately 1,200 feet from a municipal well, which was contaminated with PCE from the dry cleaner. The City of Modesto began monitoring ground water in 1984 and Municipal Well 11 was found to be contaminated with PCE above the allowable drinking water standard. Well 11 was temporarily taken out of service by the City and a wellhead granular activated carbon treatment system was installed in June 1991 to remove the PCE contamination from the ground water. Well 11 was then shut down again in October 1995 because it was found to be contaminated with low levels of naturally occurring uranium that were slightly above the allowable drinking water level. It is unknown if Well 11 will ever be used again as a source of drinking water because of the naturally occurring uranium. EPA plans to complete investigation and the cleanup of the PCE in soil and groundwater to prevent other wells from becoming contaminated.

Top of page

Contaminants and Risks

Contaminated Media
  • Groundwater
  • Soil and Sludges

Ground water and soil at the site are contaminated with PCE. Potential health threats to people include drinking, eating, breathing, or touching contaminated soil or ground water. To minimize the possibility of drinking contaminated ground water, Municipal Well 11 has been shut off, and institutional controls have been implemented to restrict private use of ground water. Most of the site is paved to minimize touching or ingesting contaminated soil. PCE vapor migrating from the subsurface into indoor air has been found to be a problem only in the building directly over the soil contamination. Action has been taken to reduce this risk.

Top of page

Who is Involved

This site is being addressed through Federal actions.

Top of page

Investigation and Cleanup Activities

This site is being addressed in two stages: initial actions and a long-term remedial phase focusing on cleanup of the entire site.

Initial Actions

Initial Actions: Information on the soil and ground water contamination at the site was collected during a removal assessment in 1990, and a limited soil vapor extraction system was installed to address shallow soil contamination. Subsequent investigations determined that no immediate actions were required and the first soil vapor extraction system was turned off.

Site Studies

Entire Site: EPA completed a three-phase remedial investigation from 1991 to 1996 to determine the nature and extent of contamination at the site. EPA conducted additional soil and groundwater investigations in 2007, 2008, 2011 and 2012. Monitoring wells are sampled quarterly to track the groundwater contamination plume. EPA conducted a vapor intrusion investigation in 2008 - 2012 to evaluate the potential migration of soil vapor into buildings at the site.

Remedy Selected

In 1997 EPA selected an interim remedy for cleaning up the PCE contamination. This remedy includes a groundwater extraction and treatment system and a soil vapor extraction (SVE) and treatment system. EPA is currently conducting a feasibility study to select a final site remedy, and a final Record of Decision is planned for 2014.

Cleanup Ongoing

The interim groundwater and soil vapor extraction and treatment systems were installed in 2000 and continue to operate. The SVE system was expanded in 2008 to increase the removal of PCE from the soil. Since then, the expanded system has captured a large fraction of the contaminant mass in the soils, and the soil vapor concentrations at the source area have dropped considerably.


The first Five Year Review of the effectiveness of the interim remedy was completed in 2008. The review found that the operating groundwater remedy is protective of human health and the environment in the short term. The review made recommendations to expand the SVE system; to evaluate and, if necessary, mitigate potential vapor intrusion into buildings; and to complete the groundwater investigation. All of the Five Year Review recommendations have been completed or are underway. As part of this, EPA installed a sub-slab depressurization system to mitigate the potential for PCE vapor intrusion into the building at the site.

The groundwater remediation system was expanded in 2012 with the installation of another extraction well to capture more of the PCE contamination plume. Eight additional monitoring wells were installed in 2011 to further characterize the downgradient edge of the plume, to determine the proximity of the plume to Municipal Well 7, and to evaluate the potential for commingling with other PCE plumes in the area. Eight more groundwater monitoring wells were installed in 2013.

Other activities that EPA has conducted to fill in data gaps for the selection of a final site remedy are: evaluate the effect that pumping of municipal wells in the area has on movement of the PCE plume; study naturallly-occurring uranium in groundwater in the vicinity of the site; and conduct laboratory tests to evaluate the effectiveness of potential groundwater treatment methods.

Top of page

Cleanup Results to Date

As of early 2013, the interim remedies have removed over 3469 pounds of PCE mass from the soil and 575 pounds of PCE mass from the groundwater. The system has treated over 208 million gallons of groundwater.

Top of page

Potentially Responsible Parties

Potentially responsible parties (PRPs) refers to companies that are potentially responsible for generating, transporting, or disposing of the hazardous waste found at the site.


PRPs have been identified.

Top of page

Documents and Reports


Hide details for Fact SheetsFact Sheets
07/01/97EPA Proposes Plan for Groundwater Cleanup Project in Modesto, California
02/01/00Modesto Superfund Site--EPA Announces Start of Construction for Cleanup of Groundwater Contamination
Hide details for Records of DecisionRecords of Decision
09/01/97Interim Record of Decision, The "Modesto Ground Water Contamination" Site - Modesto Stanislaus County, California (EPA ID#: CAD 981997752)
Hide details for Technical DocumentsTechnical Documents
09/01/08Five-Year Review Report For Modesto Groundwater Contamination Superfund Site - Modesto, California
03/01/09Quarterly Operations and Monitoring Report
05/01/09Quarterly Operations and Monitoring Report
08/01/09Quarterly Operations and Monitoring Report
11/01/09Quarterly Operations and Monitoring Report
02/01/10Quarterly Operations and Monitoring Report
05/01/10Quarterly Operations and Monitoring Report
08/01/10Quarterly Operations and Monitoring Report
11/01/10Quarterly Operations and Monitoring Report
02/01/11Quarterly Operations and Monitoring Report
05/01/11Quarterly Operations and Monitoring Report
08/01/11Quarterly Operations & Monitoring Report
11/01/11Quarterly Operations & Monitoring Report
02/01/12Quarterly Operations & Monitoring Report
05/01/12Quarterly Operations & Monitoring Report
08/01/12Quarterly Operations & Monitoring Report
11/01/12Quarterly Operations & Monitoring Report
03/01/13Quarterly Operations & Monitoring Report
05/01/13Quarterly Operations & Monitoring Report
08/01/13Quarterly Operations & Monitoring Report
09/01/13Five-Year Review Report for Modesto Groundwater Contamination Superfund Site - Modesto, California
01/01/14Quarterly Operations & Monitoring Report
02/01/14Quarterly Operations & Monitoring Report
05/01/14Quarterly Operations & Monitoring Report

Top of page

Community Involvement

Public Meetings:

Top of page

Public Information Repositories

The public information repositories for the site are at the following locations:

Stanislaus County Free Library
1500 I Street, Modesto, CA 95354
(209) 558-7814

The most complete collection of documents is the official EPA site file, maintained at the following location:

Superfund Records Center

Mail Stop SFD-7C

95 Hawthorne Street, Room 403

San Francisco, CA 94105

(415) 820-4700

Enter main lobby of 75 Hawthorne street, go to 4th floor of South Wing Annex.

Additional Links

Top of page

Contacts

EPA Site Manager
Marie Lacey
415-972-3163
Lacey.Marie@epamail.epa.gov
US EPA Region 9
Mail Code SFD
75 Hawthorne Street
San Francisco, CA 94105
EPA Community Involvement Coordinator
Jackie Lane
415-972-3236
1-800-231-3075
Lane.Jackie@epamail.epa.gov
US EPA Region 9
Mail Code SFD
75 Hawthorne Street
San Francisco, CA 94105
EPA Public Information Center
415-947-8701
r9.info@epa.gov
State Contact
Jim Rohrer
916-255-3709
jrohrer@dtsc.ca.gov
California Department of Toxic Substances Control
8800 Cal Center Drive
Sacramento, CA 95826-3200
PRP Contact
Community Contact
Other Contacts
After Hours (Emergency Response)
US EPA
(800) 424-8802

Top of page



Jump to main content.