Jump to main content or area navigation.

Contact Us

Pacific Southwest, Region 9: Superfund

Serving Arizona, California, Hawaii, Nevada, the Pacific Islands, and Tribal Nations

Technical Documents

StateDistrict
Hide details for [<script>document.write("Arizona".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("00".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("South Indian Bend Wash Area".link(document.links[document.links.length-1]))</script>]
09/23/11First Five-Year Review
12/03/12SIBW Monitored Natural Attenuation Monitoring Report
01/10/13EPA Technical Factsheet on: TRICHLOROETHYLENE (TCE)
07/02/13Indoor Air Sampling, Winter 2013, DCE Circuits Subsite, South Indian Bend Wash
(SIBW) Superfund Site
Hide details for [<script>document.write("01".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Iron King Mine And Humboldt Smelter ".link(document.links[document.links.length-1]))<
08/01/08Data Presentation Air- Ambient Air Data Summary Table
01/01/09Data Summary Air - Ambient Air Data Summary Table - December 2008/January 2009
02/04/09A Cultural Resource and Historic Building Survey for a Remedial Investigation/Feasibility Study at the Iron King Mine-Humboldt Smelter Superfund Site
02/04/09BIOLOGICAL EVALUATION OF THE IRON KING MINE - HUMBOLDT SMELTER SUPERFUND SITE
03/01/09TEOM - Particulate Monitoring Graph
07/01/09Reusing Superfund Sites - Summary Overview
11/01/09RIPARIAN EVALUATION AND JURISDICTIONAL DETERMINATION
03/01/10Remedial Investigation Report
03/01/10Remedial Investigation Report (Appedix A)
06/01/10Reuse Assessment for Iron King Mine - Humboldt Smelter Superfund Site
10/11/10Data Evaluation Summary Report Addendum II
10/13/10Remedial Alternatives Evaluation Technical Memorandum
10/20/10Cover Alternatives Evaluation for Iron King Main Tailings Pile
07/01/12Iron King Mine Removal Report
Hide details for [<script>document.write("Motorola, Inc. (52nd Street Plant)".link(document.links[document.links.length-1]))</s
10/01/95OU1 Five Year Review
10/01/01OU1 Five Year Review
10/01/01OU2 Five Year Review
08/01/02Motorola 52nd Street Superfund Site, Phoenix, AZ
10/01/06OU2 Five Year Review
11/01/06OU1 5 year review 2006
08/31/10OU1 Administrative Order of Consent for Vapor Intrusion
09/08/10OU3 RI/FS AOC and SOW
09/22/10OU3 Remedial Investigation Work Plan
02/01/11End-Use Report for OU1 treated water
06/15/11OU1 Effectiveness Report and comments
09/09/11OU2 Effectiveness Report
09/16/11Joint Air Toxics Assessment Project Final Report
09/27/11OU2 Five Year Review Addendum
09/29/11Honeywell Human Health Risk Assessment, and ADEQ/EPA comments
11/01/11Subslab and Indoor Air work plan for OU1 vapor intrusion investigation
11/18/11EPA and ADEQ Comments to Honeywell HHRA Tech Memo
11/22/11Validated Indoor Air and Sub-Slab Data for July Sampling Event
01/20/12Tech Memo: Honeywell Phase 2 Vapor Intrusion Assessment
02/02/12October Sampling Event: OU1 Validated Indoor Air and Subslab data
05/17/12Indoor Air, Sub-Slab and Outdoor Air Sample Results for July 2011, October 2011 and February 2012
06/04/12M52 Soil Gas Sampling report FINAL 2012-06-04
04/24/13OU1 Indoor Air, Sub-slab, and Outdoor Air Sample Results
Hide details for [<script>document.write("North Indian Bend Wash Superfund Site".link(document.links[document.links.length-1]))
04/14/89ATSDR Health Assessment
09/29/93ATSDR Site Review and Update
03/28/05ATSDR Health Consultation for Area 12
03/01/06ATSDR Health Consultation for MRTF
09/30/06ATSDR Health Consultation for CGTF
11/01/062006 Annual Site Monitoring Report
03/08/07ATSDR Health Consultation for Area 7
07/11/07Communication Plan
02/28/082007 Annual Site Monitoring Report
04/17/08Miller Road Treatment Facility Evaluation Report
04/25/082008 Interim Operating Plan Miller Road Treatment Facility
01/23/09Final CGTF Engineering Evaluation by Environ, January 2009
02/19/09EPA Oversight Report on School Sampling Activities
02/19/09NIBW PCs School Soil / Soil Vapor Sampling Report
09/23/11First Five-Year Review
01/10/13EPA Technical Factsheet on: TRICHLOROETHYLENE (TCE)
Hide details for [<script>document.write("02".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Yuma Marine Corps Air Station".link(document.links[document.links.length-1]))</script
03/11/03Five Year Review Report OU2
12/14/04Five Year Review Report OU1 & OU2
07/12/10Five Year Review Report OU1 & OU2
Hide details for [<script>document.write("03".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Hassayampa Landfill".link(document.links[document.links.length-1]))</script>]
09/27/01First Five Year Review Report
09/22/06Second Five Year Review Report
10/17/07Final Phase I Report (excluding Appendix A)
01/28/102009 Annual Report
09/30/11Third Five Year Review Report
Hide details for [<script>document.write("Luke Air Force Base".link(document.links[document.links.length-1]))</script>]
01/30/02Final First Five-Year Review for Luke Air Force Base Superfund Site, Glendale, AZ
09/19/07Second Five Year Review Report
09/19/07Second Five Year Review Report - Tables
09/19/07Second Five Year Review Report - Appendices
09/25/12Third Five Year Review Report
Hide details for [<script>document.write("04".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Asarco Hayden Plant".link(document.links[document.links.length-1]))</script>]
08/31/08Phase I Remedial Investigation Report
08/31/08Phase I Ecological Risk Assessment
08/31/08Phase I Human Health Risk Assessment
03/23/14Final NON-AIR Phase II Remedial Investigation / Feasibility Study (RI/FS) Work Plan
03/29/14Final AIR Phase II Remedial Investigation / Feasibility Study (RI/FS) Work Plan
Hide details for [<script>document.write("Mountain View Mobile Home Estates".link(document.links[document.links.length-1]))</sc
09/09/91First Five Year Review Report
12/10/99Second Five Year Review Report
09/28/05Third Five Year Review Report
09/29/10Fourth Five Year Review Report
Hide details for [<script>document.write("Nineteenth Avenue Landfill".link(document.links[document.links.length-1]))</script>]
09/29/00First Five Year Review Report
09/30/05Second Five Year Review Report
08/14/06Responsiveness Summary for Site Deletion in 2006; Federal Register Notice for Site Deletion Aug 2006; Final Notice of Site Deletion Sept 2006
09/28/10Third Five Year Review Report
Hide details for [<script>document.write("Phoenix-Goodyear Airport Area".link(document.links[document.links.length-1]))</script
09/30/05Five Year Review Report [5.5MB]
09/22/06Five Year Review Report for OU3
08/01/07Draft Report - Engineering Evaluaiton/Cost Analysis For Perchlorate Treatment
09/29/10Five Year Review Report for North and South Areas
07/06/11Final Source Areas, Soil, and Facility Structure Investigation Report
01/16/14Source Area Remediation Focused Feasibility Study - Text
01/16/14Source Area Remediation Focused Feasibility Study - appendices
Hide details for [<script>document.write("05".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Apache Powder Company".link(document.links[document.links.length-1]))</script>]
09/30/02First Five-Year Review Report for Apache Powder Superfund Site, Cochise County, AZ
09/25/072nd Five-Year Review Report
09/20/12Third Five-Year Review Report
Hide details for [<script>document.write("Indian Bend Wash Area".link(document.links[document.links.length-1]))</script>]
09/23/11First Five Year Review
09/23/11First Five-Year Review
01/10/13EPA Technical Factsheet on: TRICHLOROETHYLENE (TCE)
Hide details for [<script>document.write("07".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Tucson International Airport Area".link(document.links[document.links.length-1]))</sc
09/12/11Federal Facilities Agreement with Air Force Plant 44
10/18/11Area B Feasibility Study 2011
10/28/11Final TIAA Area BFocused Feasibility Study
01/22/13Pima County Private Well Sampling Report
09/30/13First Five-Year Review Report
Hide details for [<script>document.write("California".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("00".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Jervis B. Webb Co".link(document.links[document.links.length-1]))</script>]
09/01/11National Priorities List for Jervis Webb Co.
09/01/11NPL Talking Point for Jervis Webb & Seam Master Sites
Hide details for [<script>document.write("Santa Susana Field Laboratory (SSFL)".link(document.links[document.links.length-1]))<
01/01/015 - AREA IV SOIL TESTING WORKPLANS AND REPORTS - ROUND 1 (October 6, 2010 to August 17, 2012)
01/01/012 - AREA IV HISTORICAL SITE ASSESSMENT (August 24, 2010 and October 25, 2010)
01/01/013 - AREA IV GAMMA SCAN SURVEY WORKPLANS AND REPORTS (February 19, 2010 and February 22, 2010)
01/01/014 - AREA IV WATER TESTING WORKPLANS AND REPORTS (July 28, 2010 to July 24, 2012)
01/01/011 - RADIOLOGICAL BACKGROUND STUDY WORKPLANS AND REPORTS (August 2009 to October 2011)
01/01/016 - AREA IV SOIL TESTING WORKPLANS AND REPORTS - ROUND 2 (June 14, 2011 to December 21, 2012)
01/01/017 - GEOPHYSICAL INVESTIGATION AREA IV RADIOLOGICAL STUDY PLAN AND REPORT (August 5, 2010 to December 2, 2011)
12/05/08Scoping Document For Development Of Radiation Survey Of A
Background Reference Area And Area IV/Buffer Zone
04/01/09EPA DOE Agreement on Area IV Rad Study
01/21/10EPA's QUARTERLY PROGRESS REPORTS TO DOE - AREA IV RADIOLOGICAL STUDY (October 2009 and January 2010)
05/25/10U.S. FISH AND WILDLIFE LETTERS (October 5, 2009 to May 25, 2010)
06/16/10CALIFORNIA DEPARTMENT OF FISH AND GAME LETTERS (February 18, 2010 to June 16, 2010)
09/24/10Site Management Plan
12/01/10STATE HISTORIC PRESERVATION OFFICER - CALIFORNIA DEPARTMENT OF PARKS AND RECREATION LETTERS (June 3, 2010 to December 1, 2010)
08/08/11EPA'S QUARTERLY AND ANNUAL BIOLOGICAL MONITORING REPORTS (October 22, 2010 to August 8, 2011)
10/17/12Final Gamma Radiation Scanning Report - Area IV Radiological Study
11/27/12Final Technical Memorandum Look-up Table Recommendations - Santa Susana Field Laboratory Area IV Radiological Study
12/21/12Final Surface Water and Sediment Report - Area IV Radiological Study
Hide details for [<script>document.write("Southern Avenue Industrial Area".link(document.links[document.links.length-1]))</scri
09/01/11National Priorities List for Seam Master Industries.
09/01/11NPL Talking Point for Seam Master and Jervis Webb Sites
Hide details for [<script>document.write("Yosemite Creek Sediment".link(document.links[document.links.length-1]))</script>]
08/06/93Transmittal of Guidance on Conducting Non-Time-Critical Removal Actions Under CERCLA (Publication 9360.0-32)
06/02/99Sediment Investigation at Yosemite Creek - Draft Report by S.F. Public Utilities Commission
05/07/04Sediment Investigation at Yosemite Creek - Draft Report by S.F. Public Utilities Commission
05/02/05Hunters Point Shipyard Parcel F - Final Validation Study Report
12/01/05Contaminated Sediment Remediation - Guidance for Hazardous Waste Sites
01/01/06California State Parks Foundation - Wetland Restoration and Management Plan - Yosemite Slough
07/27/06Wildlife Survey - Final Report, 2003 - 2004
05/23/11Final Removal Assessment Report
08/24/11Threatened and Endangered Species For Site Listing
10/11/11Notification and Request for Coordination with Natural Resources Trustees Letter
10/21/11Engineering Evaluation / Cost Analysis Final Approval Memorandum
11/10/11Identification of State "Applicable" Or "Relevant and Appropriate" Requirements (ARARs) Letter
11/17/11EPA to Native American Heritage Commission Requesting Stakeholder List Letter
12/27/11Native American Heritage Commission Stakeholder List Letter
02/01/12Sampling and Analysis Plan, Yosemite Slough Sediment - Waste Characterization Study
02/03/12Stanford University's ESTCP Field Testing of Activated Carbon Mixing and In Situ Stabilization of PCBs in Sediment at Hunters Point Shipyard Parcel F
03/23/12Yosemite Slough Sediment Treatability Study Workplan
04/24/12Fish and Wildlife Service - Identification of Applicable or Relevant and Appropriate Requirements (ARARs) for Response Actions and Initiation of Coordination Letter
04/30/12Bay Conservation and Development Commission - Identification of Applicable or Relevant and Appropriate Requirements (ARARs) for Response Actions and Initiation of Coordination Letter
05/01/12Geotechnical Data Report
06/14/12Estimation of Aroclor 1254 and Aroclor 1260 Concentrations using
PCB Congener Data in Yosemite Slough Sediment Sample Data from
Yosemite Creek Sediment Removal Assessment Report, May 2011
10/31/12Waste Characterization Study Report
11/06/12Sediment Treatability Study for Yosemite Slough Sediment Area
12/06/13Final Engineering Evaluation/Cost Analysis (excluding Appendices D and E)
03/17/14Action Memorandum
Hide details for [<script>document.write("01".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Celtor Chemical Works".link(document.links[document.links.length-1]))</script>]
09/30/93First Five Year Review Report
08/29/01Second Five Year Review Report
Hide details for [<script>document.write("Coast Wood Preserving".link(document.links[document.links.length-1]))</script>]
02/05/96First Five Year Review Report
08/15/01Second Five Year Review Report
09/22/06Third Five Year Review Report
01/15/09Combined Fourth Quarter and 2008 Annual Groundwater Monitoring Report
02/15/11Combined Fourth Quarter and 2010 Annual Groundwater Monitoring Report
09/28/11Fourth Five Year Review Report
01/15/12Combined Fourth Quarter and 2011 Annual Groundwater Monitoring Report
02/28/132012 Annual Groundwater Monitoring Report
Hide details for [<script>document.write("Del Norte Pesticide Storage".link(document.links[document.links.length-1]))</script>]
05/11/98Agreement for Recovery of Response Costs
09/26/00First Five-Year Review Report
03/04/02Consent Decree
09/01/05Second Five-Year Review Report
06/01/10Five-Year Review Report
04/17/13Nineteenth Semiannual Groundwater Monitoring Report
Hide details for [<script>document.write("MGM Brakes".link(document.links[document.links.length-1]))</script>]
09/30/03First Five-Year Review Report For MGM Brakes Superfund Site
07/10/08Final Second Five-Year Review Report
09/26/13Third Five-Year Review Report
Hide details for [<script>document.write("02".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Blue Ledge Mine".link(document.links[document.links.length-1]))</script>]
10/01/10Technical Memorandum - Results of October 2010 Sampling
Hide details for [<script>document.write("Iron Mountain Mine".link(document.links[document.links.length-1]))</script>]
09/30/93First Five Year Review Report
10/08/98Second Five Year Review Report
09/30/03Third Five Year Review Report
07/14/08Fourth Five Year Review Report
09/26/13Fifth Five Year Review Report
Hide details for [<script>document.write("J. H. Baxter & Co.".link(document.links[document.links.length-1]))</script>]
07/07/00First Five Year Review Report
09/28/05Second Five Year Review Report
09/30/10Third Five Year Review Report
01/01/132012 Annual Report on Operation, Maintenance, and Monitoring Activities
01/01/142013 Annual Report on Operation, Maintenance, and Monitoring Activities
Hide details for [<script>document.write("Koppers Co., Inc. (Oroville Plant)".link(document.links[document.links.length-1]))</s
12/22/97First Five Year Review (12/1997)
02/07/03Final Second 5-Year Review Report for Koppers Company, Inc.
09/04/03Preliminary Closeout Report for Kopper Company, Inc.
11/28/06Grant Deed
07/28/08Third Five-Year Review 2008 -Final
03/01/09Koppers Semiannual 2008 RA Groundwater Monitoring Report
08/28/13Fourth Five Year Review Report
Hide details for [<script>document.write("Lava Cap Mine".link(document.links[document.links.length-1]))</script>]
09/01/99Community Involvement Plan - Lava Cap Superfund Site
11/01/01Final Human Health Risk Assessment -- Lava Cap Mine Superfund Site
11/01/01Remedial Investigation, Lava Cap Mine Superfund Site
11/01/01Final Ecological Risk Assessment -- Lava Cap Mine Superfund Site
11/01/01Supporting data: Lava Cap Mine Remedial Investigation
02/01/04Public Release Draft Mine Area Feasibility Study
07/01/08Operable Unit 2 Feasibility Study Report
11/01/10Remedial Action Report Mine Area Operable Unit (OU1).
09/14/11First Five-Year Review Report
07/01/142014 Annual Groundwater Summary Report
Hide details for [<script>document.write("Western Pacific Railroad Co.".link(document.links[document.links.length-1]))</script>
09/04/03First Five-Year Review Report for Western Pacific Railroad Superfund Site, Oroville, California
09/18/08Second Five-Year Review Report - Western Pacific Railroad Superfund Site Butte County, California
09/19/13Third Five-Year Review Report - Western Pacific Railroad Superfund Site Butte County, California
Hide details for [<script>document.write("03".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Aerojet General Corp.".link(document.links[document.links.length-1]))</script>]
05/21/02Aerojet biological treatment cost estimate submittal
06/25/09Part 1 - Remedial Investigation Feasibility Study - Perimeter Groundwater Operable Unit (OU-5)
06/25/09Part 2 - Perimeter Groundwater Operable Unit (OU-5) Remedial Investigation/Fasibility Study
10/28/10Final Remedial Investigation Report for the Boundary Area Operable Unit (OU-6)
09/30/11Volume 2: Final Human Health and Ecological Assessment for The Boundary Operable Unit (OU-6)
03/28/12Pre-Final Construction Inspection Report - Groundwater Extraction and Treatment Systems E-F, H-A, J, K-A, L-A and L-B, Western Groundwater Operable Unit (OU-3) - October 2011 to March 2012
07/24/12Letter from SKEO Solutions - Aerojet Reuse Assessment for Boundary Operable Unit (OU6)
08/22/12Final Remedial Action Report - Western Groundwater Operable Unit (OU-3)
09/30/12Final Feasibility Study for the Boundary Area Operable Unit (OU6)
09/30/12Final Boundary OU FS – Table of Proposed Actions (Non-VOCs) 9/30/12
09/30/12Final Boundary OU FS – Table of Proposed Actions (VOCS) 9/30/12
11/30/12Remedial Action Completion Notification and Certification Perimeter Groundwater Operable Unit (OU-5), Site C41
05/01/13Boundary OU Proposed Plan Figures 1 - 5
Hide details for [<script>document.write("Lehr Old Campus Landfill (USDOE)".link(document.links[document.links.length-1]))</scr
04/30/12Final Feasibility Study for the University of California, Davis Areas - Volume 1: Soil / Solid Waste and Soil Gas
Hide details for [<script>document.write("Travis Air Force Base".link(document.links[document.links.length-1]))</script>]
07/14/03First Five Year Review Report
09/24/08Second Five Year Review Report
Hide details for [<script>document.write("04".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Frontier Fertilizer".link(document.links[document.links.length-1]))</script>]
04/01/97Final Interim Remedial Investigaiton Report Volume 1. Appendices Volume 2.
06/01/99Supplemental Remedial Investigation Report Volume 1. Volume 2- Appendices
01/01/03Final Supplemental Remedial Investigation Report No.2
06/01/06Final Feasibility Study
09/29/09Final In-Situ Thermal Treatment Design
04/15/10Frontier Fertilizer Final Report of Waste Discharge
08/20/10Final In-Situ Thermal Treatment Design Addendum
12/21/10Draft Air Monitoring Work Plan
01/06/11Site Management Plan - In-Situ Thermal Treatment
06/01/12Renewable Energy Certificate Fact Sheet (Featuring Frontier Fertilizer)
09/26/12First Five-Year Review Report
01/01/13Final Groundwater Monitoring Report - Second Half 2011 (excluding Appendix F)
04/01/14Draft In Situ Thermal Treatment Completion Report (excluding Appendices B, C, D and F)
Hide details for [<script>document.write("Leviathan Mine".link(document.links[document.links.length-1]))</script>]
06/01/04Community Involvement Plan
10/22/08Draft Data Quality Objectives Report for Leviathan Mine RI/FS
07/01/09Leviatahn Mine Program Workplan
03/01/10Work Plan for Limited Access Season Treatment, Leviathan Mine Stie Pond 4
03/23/10Leviathan Mine Supplemental Environmental Project 2010 Annual Report (First Annual Report)
07/01/102009 Annual Oversight Summary Report
01/25/11Mapping Focused Remedial Investigation Report Final
02/23/11Year-End Report for the 2010 Field Season at Leviathan Mine
04/08/112010 Annual Completion Report: Channel Underdrain, Delta Seep, and Aspen Seep Water Treatment Activities
06/01/112010 Annual Oversight Report
04/10/122011 Annual Completion Report: Channel Underdrain, Delta Seep, and Aspen Seep Water Treatment Activities
04/10/12Monthly Progress Report for March 2012 and Quarterly RI/FS Progress Report for Fourth Quarter 2011
05/01/122011 Annual Oversight Summary Report
06/01/12Bioassessment Monitoring of Acid Mine Drainage Impacts in Streams of the Leviathan Mine Watershed: Update for Spring-Fall 2009 Surveys - Final Report
03/20/13Bioassessment Monitoring of Acid Mine Drainage Impacts in Streams of the Leviathan Mine Watershed: Update for Spring-Fall 2010 Surveys - Final Report
Hide details for [<script>document.write("05".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Jibboom Junkyard".link(document.links[document.links.length-1]))</script>]
09/28/07Discretionary Five Year Review Report
09/11/08Memorandum
Hide details for [<script>document.write("Sacramento Army Depot".link(document.links[document.links.length-1]))</script>]
08/01/07Draft Final Five Year Review Report
09/24/07EPA concurrence - Draft Final Five Year Review Report
04/01/08Final Five Year Review Report
08/08/08EPA concurrence - Final Five Year Review Report
10/13/12Fourth Five Year Review Report
Hide details for [<script>document.write("06".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Sola Optical Usa, Inc.".link(document.links[document.links.length-1]))</script>]
12/03/90Remedial Investigation Report, Sola Optical USA, Inc., Petaluma, California
04/01/91Public Health Risk Assessment, Sola Optical USA, Inc. Site
09/29/00First Five Year Review Report for the Sola Optical USA, Inc. Superfund Site Sonoma County, California
04/04/01Evaluation of Monitored Natural Attenuation (MNA) as a Remedy to Meet Remedial Action Objectives, Sola Optical USA, Inc., Site, Petaluma, CA
09/28/05Second Five-Year Review Report for the Sola Optical USA, Inc. Superfund Site Sonoma County, California
06/01/09Groundwater Quality Data
09/01/09Concentration of 1,1-DCA in Well W-27
09/23/10Third Five-Year Review Report for Sola Optical USA, Inc. Superfund Site
08/31/12Groundwater Monitoring Report, July through December 2012, Former Sola Optical U.S.A., Inc., Facility
04/30/13Final Close-Out Report for the Sola Optical USA, Inc. Superfund Site, Sonoma County, California
10/22/13Responsiveness Summary, Sola Optical USA, Inc. Deletion from NPL
Hide details for [<script>document.write("07".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Liquid Gold Oil Corp.".link(document.links[document.links.length-1]))</script>]
09/21/10Third Five Year Review
Hide details for [<script>document.write("United Heckathorn Co.".link(document.links[document.links.length-1]))</script>]
09/28/01First Five Year Review Report
09/01/06Second Five-Year Review Report
10/21/082008 Summary of Fish Tissue Sampling and Analysis Report
09/21/11Third Five-Year Review Report for United Heckathorn Superfund Site - Richmond, California
04/01/13United Heckathorn Tier 1 Sediment Transport Study
03/01/14United Heckathorn Source Identification Study
04/01/14United Heckathorn Tier 2 Sediment Transport Study
05/28/14United Heckathorn DDT Fate and Transport Study, May 2014
Hide details for [<script>document.write("08".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Amco Chemical".link(document.links[document.links.length-1]))</script>]
09/01/04Summary Of Groundwater Grab Data (Screening Level Data) (English and Spanish Version)
02/01/08Draft Remedial Investigation Report (Includes Human Health Risk Assessment)
05/22/10Indoor air results summary through 2009
10/22/10Human Health Risk Assessment
01/10/11Final Remedial Investigation Report
11/15/11Draft Sampling plan and air monitoring plan November 2011
Hide details for [<script>document.write("Hunters Point Naval Shipyard".link(document.links[document.links.length-1]))</script>
10/14/04Final - Finding of Suitability to Transfer for Parcel A (Revision 3)
05/02/05Final Hunters Point Shipyard Parcel F Validation Study Report
03/30/07Draft - Parcel E-2 - Remedial Investigation/Feasibility Study - Text, Figures, Tables, Appendices A-E
03/30/07Draft - Parcel E-2 - Remedial Investigation/Feasibility Study - Apendices F-R
06/29/07Draft - Parcels E and E-2 Shoreline Characterization Technical Memorandum
09/14/07Draft - Radiological Addendum to the Parcel E-2 Remedial Investigation/Feasibility Study
12/12/07Final - Parcel B - Technical Memorandum in Support of a Record of Decision Amendment
04/11/08Final - Radiological Addenum to the Revised Feasibility Study for Parcel D
04/30/08Final - Feasibility Study Report for Parcel F
05/16/08Final - Action Memorandum - Time-Critical Removal Action for the Methane Source Area at IR-07, Parcel B
06/01/08Revised - Hunters Point Shipyard Parcel B Navy Announces Proposed Plan
06/20/08Final - Radiological Addendum to the Revised Feasibility Study Report for Parcel C
07/25/08Final - Construction Summary Report for Parcel B Appendices
07/25/08Final - Construction Summary Report for Parcel B
11/11/08Final Second Five Year Review of Remedial Actions
01/29/09Final - Removal Action Closeout Report for Mercury Source TCRA at Parcel B, IR Site 26
01/29/09Parcel B, IR-26 Mercury - Time Critical Removal Action - Appendices
02/12/09Final - Technical Memorandum for Groundwater Investigation at Parcel E-2
02/17/09Semiannual Groundwater Monitoring Report (April-September 2008)
02/17/09Semiannual Groundwater Monitoring Report (April-September 2008) Appendices
02/22/09Draft - Technical Summary of EPA's Analysis of Hunters Point Air Monitoring Filters for Asbestos dated December 22, 2009
04/30/09Final - Landfill Gas Monitoring Report for January - March 2009, Post Removal Action
06/09/10U.S. EPA's Final Review of Dust/Naturally Occurring Asbestos Control Measures and Air Monitoring at the Former Hunters Point Naval Shipyard and Response to Comments
12/15/10DRAFT Finding of Suitability for Early Transfer of Parcels B (Excluding Installation Restoration Sites 7 and 18) and G
08/29/12Final Quality Assurance Project Plan for Split Sampling and Analysis Landfill Gas
01/23/13Parcel E-2 Landfill Gas Split Sampling Event Report
02/19/13EPA Concurrence of the Final Finding of Suitability to Transfer for Parcel B - IR Sites 7 and 18
Hide details for [<script>document.write("11".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Mather Air Force Base".link(document.links[document.links.length-1]))</script>]
01/31/00First Five Year Review Report
11/24/04Second Five Year Review Report
09/30/10Third Five Year Review Report
06/10/13Mather Air Force Base Annual and Fourth Quarter 2012 Groundwater Monitoring Report
Hide details for [<script>document.write("McCormick & Baxter Creosoting Co.".link(document.links[document.links.length-1]))</sc
06/02/00Field Investigation Report - McCormick & Baxter Superfund Site
05/07/01Field Investigation Report - McCormick & Baxter Superfund Site
02/01/072006 Groundwater Sampling Report - McCormick & Baxter Superfund Site (W/O Appendices)
09/26/13Second Five-Year Review Report
Hide details for [<script>document.write("Sharpe Army Depot".link(document.links[document.links.length-1]))</script>]
06/27/03Preliminary Close Out Report
01/12/04First Five Year Report Review Report
09/24/09Second Five Year Review Report
Hide details for [<script>document.write("Tracy Defense Depot".link(document.links[document.links.length-1]))</script>]
09/23/05Five Year Review Report
08/08/12Second Five Year Review Report
10/19/12Preliminary Close Out Report
Hide details for [<script>document.write("12".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Middlefield-Ellis-Whisman (MEW) Study Area".link(document.links[document.links.length
09/30/04Final First Five Year Review Report
03/01/05Final Environmental Issues Management Plan for NASA Research Park
04/08/092008 Annual Progress Report for 455, 485/487 and 501/505 East Middlefield Road
04/15/092008 Annual Progress Report for Raytheon
04/15/092008 Annual Progress Report for 501 Ellis Street
04/15/092008 Annual Progress Report for 401/405 National Avenue site
04/15/092008 Annual Progress Report for Intel
06/15/092008 Annual Progress Report for WATS and EATS
06/15/092008 Annual Progress Report for MEW Regional Study Area
06/15/092008 Annual Progress Report for Fairchild
06/29/09Final Supplemental Remedial Investigation for the Vapor Intrusion Pathway
06/29/09Final Supplemental Feasibility Study for the Vapor Intrusion Pathway
07/09/09Proposed Plan for the Vapor Intrusion Pathway (updated to fix Table 3 title to Future Buildings)
08/20/09Updated to reflect extended public comment period - Proposed Plan for the Vapor Intrusion Pathway
08/20/09EPA Potential Changes to Proposed Vapor Intrusion remedy - Aug 20, 2009
09/18/09Cover page of Proposed Plan updated to reflect public comment period extended to Nov 7, 2009 - Proposed Plan for Vapor Intrusion Pathway
09/30/09Final Second Five-Year Review for the MEW Superfund Study Area
11/07/09Public Comments Received on EPA's Proposed Plan for the Vapor Intrusion Pathway during public comment period (July 10 - Nov 7, 2009)
04/15/102009 Annual Progress Report for Vishay/SUMCO/Fairchild 405/425 National Ave
04/15/102009 Annual Progress Report for former NEC 501 Ellis Street
04/15/102009 Annual Progress Report for Former Intel- Mtn View facility - 365 E. Middlefield Road
04/15/102009 Annual Progress Report for SMI 455, 485/487 and 501/505 East Middlefield Road
04/15/102009 Annual Progress Report for Former Raytheon Facilities - 350 Ellis Street
05/01/102009 Regional Groundwater Remediation Program Progress Report - Restoration Program, NASA Ames Research Center
06/15/102009 Annual Progress Report for former Fairchild facilities - Bldgs 1-4, 9, 18, 19, 20
06/15/10 2009 Annual Progress Report for MEW Regional Groundwater Remediation Program
06/15/102009 Annual Progress Report for MEW Regional Groundwater Remediation Program
06/30/102009 Annual Progress Report for WATS and EATS Areas (excluding Appendix C)
04/11/112010 Annual Progress Report for SMI 455, 485/487 and 501/505 East Middlefield Road
04/15/112010 Annual Progress Report for Former Raytheon - 350 Ellis Street
04/15/112010 Annual Progress Report for former NEC/Renasas 501 Ellis Street
04/15/112010 Annual Progress Report for Vishay/SUMCO/Schlumberger 405/425 National Avenue
04/15/112010 Annual Status of Enhanced In-situ Bioremediation Pilot Test for Former Intel/Raytheon 365/401 East Middlefield Road
05/01/112010 Regional Groundwater Remediation Program Progress Report - Restoration Program, NASA Ames Research Center
06/15/112010 Annual Progress Report for MEW Regional Groundwater Remediation Program
06/15/112010 Annual Groundwater Report for Moffett Field Site 26 EATS Area and Site 28 WATS Area [excluding Appendix C]
06/15/112010 Annual Progress Report for former Fairchild facilities - Bldgs 1-4, 9, 18, 19, 20
09/12/11Building-Specific Air Sampling Report for Buildings 23, 48, 146, 503, 543, 554, 569, 583A, 583B, 583C, 596, and 944 on Moffett Field, CA
09/29/11Site-wide Vapor Intrusion Sampling and Analysis Work Plan for Response Action Tiering
03/26/12Final Technical Memorandum In Situ Anaerobic Biotic/Abiotic Treatability Study Installation Restoration Site 28 on Moffett Field (excluding Appendices F and H)
04/01/122011 Regional Groundwater Remediation Program Progress Report - Restoration Program, NASA Ames Research Center
04/13/122011 Annual Progress Report for Former Intel- Mtn View facility - 365 E. Middlefield Road
04/13/122011 Annual Progress Report for Former Raytheon - 350 Ellis Street
04/13/122011 Annual Progress Report for Vishay/SUMCO/Schlumberger 405/425 National Avenue
04/13/122011 Annual Groundwater Report for Moffett Field Site 26 EATS Area and Site 28 WATS Area (excluding Appendices C, D, E)
04/13/122011 Annual Progress Report for former Fairchild facilities - Bldgs 1-4, 9, 18, 19, 20
04/13/122011 Annual Progress Report for MEW Regional Groundwater Remediation Program (excluding Appendices B and F)
04/16/122011 Annual Vapor Intrusion Progress Report for MEW and Moffett Field Areas
05/17/12Navy's Air Sampling Work Plan for Vapor Intrusion Tier Response Evaluation at Moffett Field
06/27/12Final Work Plan Supplemental Investigation for Building 88 and Traffic Island Areas Installation Restoration Site 28 on Moffett Field
02/22/13Indoor Air Sampling Report – Former Fairchild properties – Google Quad – 369-399 N Whisman Rd and 464 Ellis St
03/01/132012 − 2013 Groundwater Results - TCE in Shallow Groundwater
04/01/132012 Annual Progress Report for Vishay/SUMCO/Schlumberger 405/425 National Avenue
04/01/132012 Regional Groundwater Remediation Program Progress Report - Restoration Program, NASA Ames Research Center
04/09/132012 Annual Progress Report for SMI Holding LLC's Facility
04/09/132012 Annual Progress Report for former NEC/Renesas 501 Ellis Street
04/12/132012 Annual Progress Report for Former Intel- Mtn View facility - 365 E. Middlefield Road
04/15/132012 Annual Progress Report for MEW Regional Groundwater Remediation Program
04/15/132012 Annual Progress Report for former Fairchild facilities - Bldgs 1-4, 9, 18, 19, 20 (excluding Appendix B)
04/15/132012 Annual Progress Report for Former Fairchild Facilities - Bldgs 13, 19 and 23 (excluding Appendix B)
04/17/132012 Annual Groundwater Report for Installation Restoration Sites 26 and 28 (excluding Appendix C)
07/30/13EPA Comments on Grab-Groundwater Assessment and Proposed Well Installation Report and Next Steps for Evaluation of Hydraulic Containment - Middlefield-Ellis-Whisman (MEW) Superfund Study Area, Mountain View and Moffett Field, CA
08/13/13Work Plan for Pilot Study Data Collection - 401 National Avenue, Mountain View, California
08/15/13Draft Pilot Study Design and Implementation Work Plan, Evandale Avenue Sources, Middlefield-Ellis-Whisman - Regional Groundwater Remediation Program
09/12/13Final Grab-Groundwater Assessment and Proposed Well Installations
09/30/13TCE Groundwater and Soil Gas Sampling Results Map for the South of 101 area in September 2013
10/25/13Subsurface Investigation Report for Moffett Gateway/Former Vector Control Yard property – 750 Moffett Blvd, Mountain View, CA
11/14/13Final Pilot Study Design and Implementation Work Plan - Evandale Avenue Sources
12/01/13Draft Work Plan for the Northernmost A2/B1-Aquifer Plume Definition Assessment
12/10/13Draft Work Plan Phase for In Situ Bioremediation – Former Fairchild Building 9
03/21/14Workplan for Groundwater Remediation Optimization for 355/365 and 401 East Middlefield Road, Mountain View
04/01/142013 Annual Groundwater Progress Report - Facility-Specific Work - 405 National Avenue, Mountain View, CA
04/01/142013 Annual Groundwater Report for Installation Restoration Sites 26 and 28 (excluding Appendix C)
04/08/142013 Annual Progress Report - 501 Ellis Street, Mountain View, CA
04/11/142013 Annual Progress Report - SMI Holding LLC - 455, 485/487 and 501/505 East Middlefield Road, Mountain View, CA
04/14/142013 Annual Progress Report for the Former Intel Mountain View Facility - 365 East Middlefield Road, Mountain View, CA
04/15/142013 Annual Groundwater Progress Report - Former Fairchild Buildings 1-4, 9, and 18 - Middlefield-Ellis-Whisman ("MEW") Area, Mountain View, CA
04/15/142013 Annual Groundwater Progress Report for the Former Raytheon Facilty 350 Ellis Street, Mountain View, CA
04/15/142013 Annual Vapor Intrusion Progress Report - Former Fairchild Properties - Middlefield-Ellis-Whisman (MEW) Area, Mountain View, CA
04/15/142013 Annual Progress Report - Regional Groundwater Remediation Program - Middlefield-Ellis-Whisman ("MEW") Area, Mountain View, CA
04/15/142013 Annual Vapor Intrusion Progress Report - Middlefield-Ellis-Whisman (MEW) Area and Moffett Field, Mountain View, CA
04/15/142013 Annual Groundwater Progress Report - Former Fairchild Buildings 13, 19, and 23 - Middlefield-Ellis-Whisman ("MEW") Area, Mountain View, CA
05/29/14Environmental Site Investigation Work Plan - 405 National Avenue, Mountain View, CA
06/24/14Final Work Plan for the Northernmost A2/B1 Aquifer Plume Definition Assessment - NASA Ames Research Center, Moffett Field, California
07/03/14Work Plan for in situ chemical oxidation (ISCO) Pilot Study Data Collection - 401 National Avenue, Mountain View, California
07/03/14Work Plan for In Situ Chemical Oxidation Pilot Study - 401 National Avenue, Mountain View, California
07/09/14EPA Region 9 TCE Interim Action Levels and Response Recommendations memo
07/24/14Draft EPA Third Five-Year Review Report for the MEW Superfund Site – July 2014
Hide details for [<script>document.write("13".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("South Bay Asbestos Area".link(document.links[document.links.length-1]))</script>]
09/27/05SECOND FIVE-YEAR REVIEW REPORT FOR SOUTH BAY ASBESTOS SITE
SAN JOSE, CALIFORNIA
08/25/10Asbestos Exposure Assessment and Risk Evaluation Summary Report
09/22/10Third Five-Year Review Report
Hide details for [<script>document.write("14".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Advanced Micro Devices, Inc. (building 915)".link(document.links[document.links.lengt
09/29/99First Five Year Review: Overall Site
09/30/04Second Five-Year Review Report for the Advanced Micro Devices-915 DeGuigne Drive Superfund Site, Sunnyvale, CA
09/30/09Third Five Year Review Report
12/03/13EPA Region 9 Guidelines and Supplemental Information Needed for Vapor Intrusion
Evaluations at the South Bay National Priorities List (NPL) Sites - Letter
01/03/14Vapor Intrusion Evaluation Report and Letters
01/31/14Fourth Five Year Review Report
02/28/14Vapor Intrusion Evaluation Report
07/09/14EPA Region 9 Response Action Levels and Recommendations to Address Near-Term Inhalation Exposures to TCE in Air from Subsurface Vapor Intrusion
Hide details for [<script>document.write("Advanced Micro Devices, Inc.".link(document.links[document.links.length-1]))</script>
09/29/99First Five Year Review Report
09/30/04Second Five Year Review Report
09/30/09Third Five Year Review Report
12/03/13EPA Region 9 Guidelines and Supplemental Information Needed for Vapor Intrusion
Evaluations at the South Bay National Priorities List (NPL) Sites - Letter
01/03/14Vapor Intrusion Evaluation Report and Letters
02/28/14Vapor Intrusion Evaluation Report, Former 901/902 Thompson Place, Sunnyvale, California
07/09/14EPA Region 9 Response Action Levels and Recommendations to Address Near-Term Inhalation Exposures to TCE in Air from Subsurface Vapor Intrusion
08/07/14EPA Notice of Lead Agency Transfer
08/11/14Notice of Deficiency - Additional Vapor Intrusion Evaluation Work Plan
Hide details for [<script>document.write("CTS Printex Inc.".link(document.links[document.links.length-1]))</script>]
09/30/05Second Five Year Review
09/30/05First Five Year Review
09/07/10Third Five Year Review
05/01/11Final Supplemental Remedial Investigations
05/01/11Final Focused Feasibility Study - Part II - Groundwater
05/01/11Final Focused Feasibility Study - Part I - Vapor Intrusion
Hide details for [<script>document.write("Fairchild Semiconductor Corp. (Mountain View Plant)".link(document.links[document.lin
09/30/04Final First Five Year Review Report
04/08/092008 Annual Progress Report for 455, 485/487 and 501/505 East Middlefield Road
04/15/092008 Annual Progress Report for 501 Ellis Street
04/15/092008 Annual Progress Report for 401/405 National Avenue site
06/15/092008 Annual Progress Report for Fairchild
06/15/092008 Annual Progress Report for MEW Regional Study Area
06/29/09Final Supplemental Feasibility Study for the Vapor Intrusion Pathway
06/29/09Final Supplemental Remedial Investigation for the Vapor Intrusion Pathway
07/09/09Proposed Plan for the Vapor Intrusion Pathway (updated to fix Table 3 title to Future Buildings)
08/20/09EPA Potential Changes to Proposed Vapor Intrusion remedy - Aug 20, 2009
08/20/09Updated to reflect extended public comment period - Proposed Plan for the Vapor Intrusion Pathway
09/18/09Cover page of Proposed Plan updated to reflect public comment period extended to Nov 7, 2009 - Proposed Plan for Vapor Intrusion Pathway
09/30/09Final Second Five-Year Review for the MEW Superfund Study Area
11/07/09Public Comments Received on EPA's Proposed Plan for the Vapor Intrusion Pathway during public comment period (July 10 - Nov 7, 2009)
06/15/102009 Annual Progress Report for former Fairchild facilities - Bldgs 1-4, 9, 18, 19, 20
06/15/102009 Annual Progress Report for MEW Regional Groundwater Remediation Program
04/15/112010 Annual Progress Report for Vishay/SUMCO/Schlumberger 405/425 National Avenue
06/15/112010 Annual Progress Report for MEW Regional Groundwater Remediation Program
06/15/112010 Annual Progress Report for former Fairchild facilities - Bldgs 1-4, 9, 18, 19, 20
04/13/122011 Annual Progress Report for former Fairchild facilities - Bldgs 1-4, 9, 18, 19, 20
04/13/122011 Annual Progress Report for Vishay/SUMCO/Schlumberger 405/425 National Avenue
04/13/122011 Annual Progress Report for MEW Regional Groundwater Remediation Program (excluding Appendices B, C and F)
02/22/13Indoor Air Sampling Report – Former Fairchild properties – Google Quad – 369-399 N Whisman Rd and 464 Ellis St
Hide details for [<script>document.write("Hewlett-Packard (620-640 Page Mill Road)".link(document.links[document.links.length-1
09/14/00First Five Year Review Report
09/30/05Second Five Year Review Report
09/30/10Third Five Year Review
12/03/13EPA Region 9 Guidelines and Supplemental Information Needed for Vapor Intrusion
Evaluations at the South Bay National Priorities List (NPL) Sites - Letter
01/23/14Approval of Addendum to the February 17, 2013 Revised Work Plan for Indoor Air Testing and Requirement - Letter
07/09/14EPA Region 9 Response Action Levels and Recommendations to Address Near-Term Inhalation Exposures to TCE in Air from Subsurface Vapor Intrusion
Hide details for [<script>document.write("Intel Corp. (Mountain View Plant)".link(document.links[document.links.length-1]))</sc
09/30/04Final First Five Year Review Report
04/15/092008 Annual Progress Report for Intel
04/15/092008 Annual Progress Report
06/15/092008 Annual Progress Report for MEW Regional Study Area
06/29/09Final Supplemental Feasibility Study for the Vapor Intrusion Pathway
06/29/09Final Supplemental Remedial Investigation for the Vapor Intrusion Pathway
07/09/09Proposed Plan for the Vapor Intrusion Pathway (updated to fix Table 3 title to Future Buildings)
08/20/09EPA Potential Changes to Proposed Vapor Intrusion remedy - Aug 20, 2009
08/20/09Updated to reflect extended public comment period - Proposed Plan for the Vapor Intrusion Pathway
09/18/09Cover page of Proposed Plan updated to reflect public comment period extended to Nov 7, 2009 - Proposed Plan for Vapor Intrusion Pathway
09/30/09Final Second Five-Year Review for the MEW Superfund Study Area
11/07/09Public Comments Received on EPA's Proposed Plan for the Vapor Intrusion Pathway during public comment period (July 10 - Nov 7, 2009)
04/15/102009 Annual Progress Report for Former Intel- Mtn View facility - 365 E. Middlefield Road
06/15/102009 Annual Progress Report for MEW Regional Groundwater Remediation Program
04/15/112010 Annual Status of Enhanced In-situ Bioremediation Pilot Test for Former Intel/Raytheon 365/401 East Middlefield Road
04/15/112010 Annual Progress Report for Former Raytheon - 350 Ellis Street
06/15/112010 Annual Progress Report for MEW Regional Groundwater Remediation Program
04/13/122011 Annual Progress Report for Former Intel- Mtn View facility - 365 E. Middlefield Road
Hide details for [<script>document.write("Intersil, Inc.-Siemens Components".link(document.links[document.links.length-1]))</sc
09/28/95First Five Year Review Report
09/28/00Second Five Year Review Report
09/29/05Third Five Year Review Report
09/30/10Fourth Five-Year Review
12/03/13EPA Region 9 Guidelines and Supplemental Information Needed for Vapor Intrusion
Evaluations at the South Bay National Priorities List (NPL) Sites - Letter
02/14/14Approval of Second Addendum to Work Plan to Evaluate Potential Vapor Intrusion and Requirement for a Report for properties at 10900 North Tantau Avenue and 10950 North Tantau Avenue - Letter
07/09/14EPA Region 9 Response Action Levels and Recommendations to Address Near-Term Inhalation Exposures to TCE in Air from Subsurface Vapor Intrusion
Hide details for [<script>document.write("Jasco Chemical Corp.".link(document.links[document.links.length-1]))</script>]
09/28/07First Five Year Review
09/28/12Second Five Year Review
Hide details for [<script>document.write("Monolithic Memories".link(document.links[document.links.length-1]))</script>]
09/29/99First Five Year Review Report
09/30/04Second Five Year Review Report
09/30/09Third Five Year Review Report
06/01/13Indoor Air [Gas Chromatography–Mass Spectrometry (GC/MS)] results for Volatile Organic Compounds and Historical Analytical Results for Indoor Air Samples
12/03/13EPA Region 9 Guidelines and Supplemental Information Needed for Vapor Intrusion
Evaluations at the South Bay National Priorities List (NPL) Sites - Letter
01/03/14Requirement for Vapor Intrusion Evaluation Report for Advanced Micro Devices
Site at 1160 Kern Avenue - Letter
03/31/14Addendum to Vapor Intrusion Evaluation Report
07/09/14EPA Region 9 Response Action Levels and Recommendations to Address Near-Term Inhalation Exposures to TCE in Air from Subsurface Vapor Intrusion
Hide details for [<script>document.write("National Semiconductor Corp.".link(document.links[document.links.length-1]))</script>
09/30/03Second Five Year Review Report
09/30/08Third Five Year Review Report
09/30/13Fourth Five-Year Review Report for the National Semiconductor Corp. Site
12/03/13EPA Region 9 Guidelines and Supplemental Information Needed for Vapor Intrusion
Evaluations at the South Bay National Priorities List (NPL) Sites - Letter
04/01/14Vapor Intrusion Data Tables
07/09/14EPA Region 9 Response Action Levels and Recommendations to Address Near-Term Inhalation Exposures to TCE in Air from Subsurface Vapor Intrusion
Hide details for [<script>document.write("Naval Air Station Moffett Field".link(document.links[document.links.length-1]))</scri
11/10/03Army's PRP Study Report - Orion Park Housing Area
03/01/05Final Environmental Issues Management Plan for NASA Research Park
03/11/05Air Sampling Report for Orion Park and Wescoat Housing Areas
09/12/07Groundwater Monitoring Well Installation and Sampling Report for Orion Park Housing Area
09/12/07Groundwater Monitoring Well Installation and Sampling Report for Orion Park Housing Area - Figures
09/12/07Groundwater Monitoring Well Installation and Sampling Report for Orion Park Housing Area - Appendices
06/15/092008 Annual Progress Report for WATS and EATS
06/29/09Final Supplemental Feasibility Study for the Vapor Intrusion Pathway
06/29/09Final Supplemental Remedial Investigation for the Vapor Intrusion Pathway
07/09/09Proposed Plan for the Vapor Intrusion Pathway (updated to fix Table 3 title to Future Buildings)
08/20/09Updated to reflect extended public comment period - Proposed Plan for the Vapor Intrusion Pathway
08/20/09EPA Potential Changes to Proposed Vapor Intrusion remedy - Aug 20, 2009
09/18/09Cover page of Proposed Plan updated to reflect public comment period extended to Nov 7, 2009 - Proposed Plan for Vapor Intrusion Pathway
09/30/09Final Second Five-Year Review for the MEW Superfund Study Area (including portions of NAS Moffett Field Superfund Site)
11/07/09Public Comments Received on EPA's Proposed Plan for the Vapor Intrusion Pathway during public comment period (July 10 - Nov 7, 2009)
02/12/10Navy Final Five-Year Review - Sites 1 & 22 Landfills and Sites 26 EATS Area and 28 WATS Area
02/12/10Navy Responses to Agency Comments - Draft Five-Year Review Report - Oct 2009
02/12/10Navy Final Five-Year Review - Sites 1 & 22 Landfills and Sites 26 EATS Area and 28 WATS Area - Appendices
02/12/10Navy Final Five-Year Review - Sites 1 & 22 Landfills and Sites 26 EATS Area and 28 WATS Area - Figures
06/15/102009 Annual Progress Report for MEW Regional Groundwater Remediation Program
06/30/102009 Annual Groundwater Report for WATS And EATS Area (excluding Appendix C)
07/07/10EPA Non-concurrence - Navy's Final Five-Year Review Report for Sites 1, 22, 26 and 28
07/20/10Navy Response to EPA July 7, 2010 letter on Navy's protectiveness statement for Site 28 WATS Area in Final Five-Year Review Report
11/05/10Final Work Plan - Supplemental Site Investigation Former Orion Park Housing Area
05/01/112010 Annual Progress Report for NASA Ames Research Center, Moffett Field, CA
06/15/112010 Annual Progress Report for MEW Regional Groundwater Remediation Program
06/15/112010 Annual Groundwater Report for Moffett Field Site 26 EATS Area and Site 28 WATS Area [excluding Appendix C]
09/12/11Building-Specific Air Sampling Report for Buildings 23, 48, 146, 503, 543, 554, 569, 583A, 583B, 583C, 596, and 944 on Moffett Field, CA
09/29/11Site-wide Vapor Intrusion Sampling and Analysis Work Plan for Response Action Tiering
12/06/11Draft Supplemental Site Investigation Report - Former Orion Park Housing Area, Moffett Field, California
03/26/12Final Technical Memorandum In Situ Anaerobic Biotic/Abiotic Treatability Study Installation Restoration Site 28 on Moffett Field (excluding Appendices F and H)
04/13/122011 Annual Groundwater Report for Moffett Field Site 26 EATS Area and Site 28 WATS Area (excluding Appendices C, D, E)
04/16/122011 Annual Vapor Intrusion Progress Report for MEW and Moffett Field Areas
05/17/12Navy's Air Sampling Work Plan for Vapor Intrusion Tier Response Evaluation at Moffett Field
06/27/12Final Work Plan Supplemental Investigation for Building 88 and Traffic Island Areas Installation Restoration Site 28 on Moffett Field
10/23/12Navy's Draft Air Sampling and Vapor Intrusion Tier Response Evaluation Report (including main text and Figure 3)
10/23/12Army's Response to Comment Letter to Agencies Regarding Orion Park Supplement Site Investigation - Received by EPA 10/23/12
10/23/12Army's Final Supplemental Site Investigation Report - Former Orion Park Housing Area - submitted October 23, 2012 (excluding Appendices A through J, and Attachment 1)
04/17/132012 Annual Groundwater Report for Installation Restoration Sites 26 and 28 (excluding Appendix C)
07/02/13Army’s Air Sampling Report –Buildings 546-MEPS, 593-Navy Lodge, and 685; Former Orion Park Housing Area
10/25/13Subsurface Investigation Report for Moffett Gateway/Former Vector Control Yard property – 750 Moffett Blvd, Mountain View, CA
12/01/13Draft Work Plan for the Northernmost A2/B1-Aquifer Plume Definition Assessment
04/15/142013 Annual Progress Report - NASA Ames Groundwater Treatment System
07/24/14Draft EPA Third Five-Year Review Report for the MEW Superfund Site – July 2014
Hide details for [<script>document.write("Raytheon Corp.".link(document.links[document.links.length-1]))</script>]
09/30/04Final First Five Year Review Report
04/15/092008 Annual Progress Report for Raytheon
04/15/09Appendix D - Status Report of the Enhanced IN-SITU Bioremediation Pilot Test
04/15/092008 Annual Progress Report
06/15/092008 Annual Progress Report for MEW Regional Study Area
06/29/09Final Supplemental Feasibility Study for the Vapor Intrusion Pathway
06/29/09Final Supplemental Remedial Investigation for the Vapor Intrusion Pathway
07/09/09Proposed Plan for the Vapor Intrusion Pathway (updated to fix Table 3 title to Future Buildings)
08/20/09Updated to reflect extended public comment period - Proposed Plan for the Vapor Intrusion Pathway
08/20/09EPA Potential Changes to Proposed Vapor Intrusion remedy - Aug 20, 2009
09/18/09Cover page of Proposed Plan updated to reflect public comment period extended to Nov 7, 2009 - Proposed Plan for Vapor Intrusion Pathway
09/30/09Final Second Five-Year Review for the MEW Superfund Study Area
11/07/09Public Comments Received on EPA's Proposed Plan for the Vapor Intrusion Pathway during public comment period (July 10 - Nov 7, 2009)
04/15/102009 Annual Progress Report for Former Raytheon Facilities - 350 Ellis Street
06/15/102009 Annual Progress Report for MEW Regional Groundwater Remediation Program
04/15/112010 Annual Status of Enhanced In-situ Bioremediation Pilot Test for Former Intel/Raytheon 365/401 East Middlefield Road
04/15/112010 Annual Progress Report for Former Raytheon - 350 Ellis Street
06/15/112010 Annual Progress Report for MEW Regional Groundwater Remediation Program
04/13/122011 Annual Progress Report for Former Raytheon - 350 Ellis Street
04/15/132012 Annual Progress Report for Former Raytheon Facilities - 350 Ellis Street
Hide details for [<script>document.write("Spectra-Physics, Inc.".link(document.links[document.links.length-1]))</script>]
09/29/99First Five Year Review Report
09/30/04Second Five Year Review Report
09/30/09Third Five Year Review Report
12/03/13EPA Region 9 Guidelines and Supplemental Information Needed for Vapor Intrusion
Evaluations at the South Bay National Priorities List (NPL) Sites - Letter
02/19/14Approval of Work Plan Addendum for Vapor Intrusion Evaluation of Residential Buildings in the Off-Property Study Area - Letter
05/24/14Data Summary for Residential Indoor Air Sample Results (May 2014)
06/16/14VI Evaluation Progress Report
07/09/14EPA Region 9 Response Action Levels and Recommendations to Address Near-Term Inhalation Exposures to TCE in Air from Subsurface Vapor Intrusion
Hide details for [<script>document.write("Teledyne Semiconductor".link(document.links[document.links.length-1]))</script>]
09/29/99First Five Year Review Report
09/30/04Second Five Year Review Report
09/30/09Third Five Year Review Report
12/03/13EPA Region 9 Guidelines and Supplemental Information Needed for Vapor Intrusion
Evaluations at the South Bay National Priorities List (NPL) Sites - Letter
02/19/14Approval of Work Plan Addendum for Vapor Intrusion Evaluation of Residential Buildings in the Off-Property Study Area - Letter
05/24/14Data Summary for Residential Indoor Air Sample Results (May 2014)
06/16/142Q Vapor Intrusion Evaluation Progress Report
07/09/14EPA Region 9 Response Action Levels and Recommendations to Address Near-Term Inhalation Exposures to TCE in Air from Subsurface Vapor Intrusion
Hide details for [<script>document.write("The Triple Site".link(document.links[document.links.length-1]))</script>]
05/01/14Additional Vapor Intrusion Evaluation - Offisite Operable Unit
06/03/14Indoor Air Evaluation, 790 East Duane Avenue, The Companies Offsite Operable Unit
08/07/14EPA Notice of Lead Agency Transfer
08/11/14Notice of Deficiency - Additional Vapor Intrusion Evaluation Work Plan
Hide details for [<script>document.write("TRW Microwave, Inc. (Building 825)".link(document.links[document.links.length-1]))</s
09/29/99First Five Year Review Report
09/30/04Second Five Year Review Report
09/30/09Third Five Year Review Report
10/30/13Approval of Vapor Intrusion Evaluation Sampling and Analysis Work Plan - Letter
12/03/13EPA Region 9 Guidelines and Supplemental Information Needed for Vapor Intrusion
Evaluations at the South Bay National Priorities List (NPL) Sites - Letter
07/09/14EPA Region 9 Response Action Levels and Recommendations to Address Near-Term Inhalation Exposures to TCE in Air from Subsurface Vapor Intrusion
08/07/14EPA Notice of Lead Agency Transfer
08/11/14Notice of Deficiency - Additional Vapor Intrusion Evaluation Work Plan
Hide details for [<script>document.write("Westinghouse Electric Corp. (sunnyvale Plant)".link(document.links[document.links.len
09/28/01First Five Year Review Report
09/26/06Second Five Year Review Report
09/29/11Third Five Year Review Report
Hide details for [<script>document.write("15".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Applied Materials".link(document.links[document.links.length-1]))</script>]
09/21/89Water Board Order 1989
06/16/93Water Board Order 1993
04/28/95First Five Year Review: Overall Site
07/11/00Second Five Year Review: Overall Site
03/15/02Annual Ground Water Monitoring and Remedial Action Self-Monitoring Report (February 2001-January 2002
03/15/04Annual Ground Water Monitoring and Remedial Action Self-Monitoring Report (Febrauary 2003-January 2004)
03/15/05Annual Ground Water Monitoring and Remedial Action Self-Monitoring Report (February 2004-January 2005)
09/29/05Third Five Year Review
09/29/05Third Five-Year Review: Overall Site
09/28/10Fourth Five Year Review
Hide details for [<script>document.write("Intel Corp. (Santa Clara 3)".link(document.links[document.links.length-1]))</script>]
11/06/951st Five Year Review
08/15/012nd Five Year Review
09/20/063rd Five Year Review
06/01/112011 Five Year Review
Hide details for [<script>document.write("Intel Magnetics".link(document.links[document.links.length-1]))</script>]
10/31/96First Five Year Review
09/27/022nd Five Year Review
09/28/07Third Five-Year Review
10/26/12Fourth Five-Year Review
05/01/13Fourth Five-Year Review Addendum
Hide details for [<script>document.write("Synertek, Inc. (Building 1)".link(document.links[document.links.length-1]))</script>]
10/31/96First Five Year Review Report
09/30/02Second Five Year Review Report
09/28/07Third Five Year Review Report
09/27/12Fourth Five year reivew Synertek, Inc. (Building 1)
12/03/13EPA Region 9 Guidelines and Supplemental Information Needed for Vapor Intrusion
Evaluations at the South Bay National Priorities List (NPL) Sites - Letter
01/31/14Extension of Due Date for Requirement for a Work Plan for Additional Vapor Intrusion Evaluation - Letter
06/20/14Approval of Additional Vapor Intrusion Evaluation Workplan - Synertek Building One Superfund Site, 3050 Coronado Drive, Santa Clara, CA.
06/25/14Final Additional Vapor Intrusion Evaluation Work Plan, Former Synertek Building No. 1 Facility, 3050 Coronado Drive, Santa Clara, California
07/09/14EPA Region 9 Response Action Levels and Recommendations to Address Near-Term Inhalation Exposures to TCE in Air from Subsurface Vapor Intrusion
Hide details for [<script>document.write("Watkins-Johnson Company (Stewart Division)".link(document.links[document.links.length
09/01/02First Five-Year Review Report
09/26/07Second Five-Year Review Report
12/31/114th Quarter 2011 Monitoring Report
09/27/12Third Five-Year Review Report
01/28/13Fourth Quarter 2012 Monitoring Report
03/26/13First Quarter 2013 Monitoring Report
01/29/14Fourth Quarter 2013 Monitoring Report
02/13/14Well Installation Completion Report
Hide details for [<script>document.write("16".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Fairchild Semiconductor Corp. (South San Jose Plant)".link(document.links[document.li
03/13/95First Five Year Review Report
07/14/99Second Five Year Review Report
09/30/04Third Five Year Review Report
09/30/09Fourth Five Year Review
10/11/13Draft Groundwater Focused Feasibility Study
11/06/132013 Annual Status Report
12/03/13EPA Region 9 Guidelines and Supplemental Information Needed for Vapor Intrusion
Evaluations at the South Bay National Priorities List (NPL) Sites - Letter
12/20/13Requirement for Vapor Intrusion Evaluation and Screening Level Risk Assessment Report - Letter
01/31/14Fifth 5-Year Review Report & Vapor Intrusion Assessment
04/21/14EPA Comments on Vapor Intrusion Screening Level Evaluation
07/09/14EPA Region 9 Response Action Levels and Recommendations to Address Near-Term Inhalation Exposures to TCE in Air from Subsurface Vapor Intrusion
Hide details for [<script>document.write("Lorentz Barrel & Drum Co.".link(document.links[document.links.length-1]))</script>]
09/27/00First Five Year Review Report
09/01/05Second Five-Year Review Report, Lorentz Barrel And Drum
09/29/10Third Five-Year Review Report
Hide details for [<script>document.write("17".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Fort Ord".link(document.links[document.links.length-1]))</script>]
09/20/02First Five Year Review Report
09/25/07Second Five Year Review Report
09/25/12Third Five Year Review Report
Hide details for [<script>document.write("McFarland Study Area".link(document.links[document.links.length-1]))</script>]
09/01/09US EPA Environmental Investigations in McFarland, California: A Summary Report
Hide details for [<script>document.write("New Idria Mercury Mine".link(document.links[document.links.length-1]))</script>]
10/01/10Expanded Site Inspection Report - New Idria Mercury Mine - San Benito County, California
Hide details for [<script>document.write("18".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Modesto Ground Water Contamination".link(document.links[document.links.length-1]))</s
09/01/08Five-Year Review Report For Modesto Groundwater Contamination Superfund Site - Modesto, California
03/01/09Quarterly Operations and Monitoring Report
05/01/09Quarterly Operations and Monitoring Report
08/01/09Quarterly Operations and Monitoring Report
11/01/09Quarterly Operations and Monitoring Report
02/01/10Quarterly Operations and Monitoring Report
05/01/10Quarterly Operations and Monitoring Report
08/01/10Quarterly Operations and Monitoring Report
11/01/10Quarterly Operations and Monitoring Report
02/01/11Quarterly Operations and Monitoring Report
05/01/11Quarterly Operations and Monitoring Report
08/01/11Quarterly Operations & Monitoring Report
11/01/11Quarterly Operations & Monitoring Report
02/01/12Quarterly Operations & Monitoring Report
05/01/12Quarterly Operations & Monitoring Report
08/01/12Quarterly Operations & Monitoring Report
11/01/12Quarterly Operations & Monitoring Report
03/01/13Quarterly Operations & Monitoring Report
05/01/13Quarterly Operations & Monitoring Report
08/01/13Quarterly Operations & Monitoring Report
09/01/13Five-Year Review Report for Modesto Groundwater Contamination Superfund Site - Modesto, California
01/01/14Quarterly Operations & Monitoring Report
02/01/14Quarterly Operations & Monitoring Report
05/01/14Quarterly Operations & Monitoring Report
08/01/14Quarterly Operations & Monitoring Report
Hide details for [<script>document.write("Riverbank Army Ammunition Plant".link(document.links[document.links.length-1]))</scri
09/24/01Five Five Year Review Report
09/22/06Second Five Year Review Report
09/28/11Third Five Year Review Report
Hide details for [<script>document.write("Valley Wood Preserving, Inc.".link(document.links[document.links.length-1]))</script>
09/24/09First Five-Year Review Report
03/15/122011 Annual Groundwater Monitoring Report
03/15/132012 Annual Groundwater Monitoring Report
Hide details for [<script>document.write("19".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Industrial Waste Processing".link(document.links[document.links.length-1]))</script>]
09/28/04First Five Year Review Report
09/29/09Second Five Year Review Report
Hide details for [<script>document.write("Purity Oil Sales, Inc.".link(document.links[document.links.length-1]))</script>]
09/28/01First Five Year Review Report
09/28/06Second Five Year Review Report
09/20/11Third Five Year Review Report
Hide details for [<script>document.write("T.H. Agriculture & Nutrition Company".link(document.links[document.links.length-1]))<
09/02/08Five-Year Review Report for T H Agriculture & Nutrition Site, Fresno County, California
09/26/13Second Five-Year Review Report for T H Agriculture & Nutrition Site, Fresno County, California
Hide details for [<script>document.write("20".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Atlas Asbestos Mine".link(document.links[document.links.length-1]))</script>]
05/15/96Five Year Review Report for the City of Coalinga OU of the Atlas and Coalinga Superfund Sites, Coalinga, CA
09/28/01Five Year Review Report for Atlas Asbestos Mine Site
09/28/06Five Year Review Report for Atlas Asbestos Mine Superfund Site And Coalinga Asbestos Mine, Fresno County, CA
08/03/11Five Year Review Report for Atlas Asbestos Mine Superfund Site And Coalinga Asbestos Mine Superfund Site, Fresno County, CA
Hide details for [<script>document.write("Brown & Bryant, Inc. (Arvin Plant)".link(document.links[document.links.length-1]))</s
10/25/89Preliminary Health Assessment for Brown & Bryant, Inc. Superfund Site (Agency for Toxic Substances Disease Registry)
05/28/93OU1 Remedial Investigation - Feasibility Study (RI/FS)
07/12/01First Five Year Review Report
11/01/02Monitoring Well Installation Report
09/01/05OU2 Remedial Investigation - Feasibility Study (RI/FS)
08/22/06Second Five-Year Review Report
06/01/07Proposed Plan Brown & Bryant Superfund Site Operable Unit No.2 (Spanish Version)
03/22/10Value Engineering Study - Brown & Bryant OU2
05/01/10Technical Specifications & Design Analysis for the A-Zone Groundwater Recovery System
05/12/10Monitoring Well System Evaluation and Proposed A-Zone and B-Zone Groundwater Extraction Wells
05/13/10Technical Specifications & Design Analysis: A Zone Groundwater Recovery System (Final)
09/22/11Third Five-Year Review Report
11/21/11April 2011 Groundwater Sampling Report
12/28/11October 2011 Groundwater Sampling Report
01/18/12October 2011 Groundwater Sampling Analysis Report for City Wells
01/26/12Site-Specific Work Plan [Monitored Natural Attenuation]
04/20/12Cap Repair Completion Report
05/18/12Operations & Maintenance Summary Report
07/30/12Work Plans - Completion of A-zone Exploration Borings & Instalation of B-zone Background Monitoring Wells
08/09/12Monitored Natural Attenuation Evaluation Report
10/16/12April 2012 Groundwater Sampling Report
Hide details for [<script>document.write("Coalinga Asbestos Mine".link(document.links[document.links.length-1]))</script>]
05/15/96Five Year Review Report for the City of Coalinga OU of the Atlas and Coalinga Superfund Sites, Coalinga, CA
09/27/01Five Year Review Report for Atlas Asbestos MIne Superfund Site and Coalinga Asbestos Mine Superfund Sites, Fresno County, California
09/28/06Five Year Review Report for Atlas Asbestos Mine Superfund Site And Coalinga Asbestos Mine
08/03/11Five Year Review Report for Atlas Asbestos Mine Superfund Site And Coalinga Asbestos Mine Superfund Site, Fresno County, CA
Hide details for [<script>document.write("Fresno Municipal Sanitary Landfill".link(document.links[document.links.length-1]))</s
09/01/05First Five-Year Review Report
09/30/10Second Five-Year Review Report
Hide details for [<script>document.write("Klau Buena Vista Mine".link(document.links[document.links.length-1]))</script>]
03/01/08Addendum#1: Phase 2 Addendum to Sampling and Analysis Plan for Remedial Investigation/Feasibility Study Klau and Buena Vista Mines Superfund Site
09/26/08Data Submittal Phase 1 and Phase 2 Remedial Investigations
Hide details for [<script>document.write("Selma Treating Co.".link(document.links[document.links.length-1]))</script>]
09/28/01First Five Year Review Report
09/29/04Approval Form - Remedial Action Report For Soils
01/26/05Preliminary Close Out Report
09/29/06Second Five Year Review Report
09/28/11Third Five Year Review Report
Hide details for [<script>document.write("Southern California Edison Co. (Visalia Poleyard)".link(document.links[document.links
05/14/09Remedial Action Report
05/19/09Final Close Out Report
07/21/10Second Five Year Review Report
Hide details for [<script>document.write("21".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Beckman Instruments (Porterville Plant)".link(document.links[document.links.length-1]
04/03/98First Five Year Review Report
09/29/03Second Five Year Review Report
09/18/08Third Five-Year Review Report
09/20/13Fourth Five Year Review Report
Hide details for [<script>document.write("23rd and 24th".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Casmalia Resources".link(document.links[document.links.length-1]))</script>]
08/05/10CASMALIA DISPOSAL SITE BACKGROUND
01/25/11Casmalia Resources Final Remedial Investigation Report - Main Contents, Main Content Figures 1-14, Tables 2-10 & ES1-ES3
01/25/11Casmalia Resources Final Remedial Investigation Report - Appendix E (Well and Piezometer Installation)
01/25/11Casmalia Resources Final Remedial Investigation Report - Appendix C (Soil Vapor Investigation) and D (Surface Water Data)
01/25/11Casmalia Resources Final Remedial Investigation Report - Appendix F (Groundwater Flow)
01/25/11Casmalia Resources Final Remedial Investigation Report - Appendix A (Background Soil) and B (Soil and Sediment Sample Summary)
01/25/11Casmalia Resources Final Remedial Investigation Report - Appendix W (Historical Topography Review)
01/25/11Casmalia Resources Final Remedial Investigation Report - Appendix M (UVIF/MIP NAPL Investigations), N (Offsite Well Survey) and O (Monitored Natural Attenuation Evaluation)
01/25/11Casmalia Resources Final Remedial Investigation Report - Appendix V (Historical Aerial Photograph Review)
01/25/11Casmalia Resources Final Remedial Investigation Report - Appendix X (COPC and EPC Supporting Tables) and Y (Follow-up Work Plans - Phase II and III Remedial Investigation)
01/25/11Casmalia Resources Final Remedial Investigation Report - Appendix G (Groundwater Chemistry)
01/25/11Casmalia Resources Final Remedial Investigation Report - Appendix Q (RI Change Forms & Request for Information Forms), R (Data Validation and Data Management), S (RI Daily Activity Reports), T (Baseline Human Health Risk Assessment) and U (Ecological Risk Assessment)
01/25/11Casmalia Resources Final Remedial Investigation Report - Appendix P (Biological Species and Habitat Survey Report)
01/25/11Casmalia Resources Final Remedial Investigation Report - Appendix H (RCRA Canyon Outcrop Assessment), I (Gamma Walkover Survey), J (Clay Barrier Investigation), K (CPT Signature Comparison) and L (Geophysical Surveys)
Hide details for [<script>document.write("23".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Halaco".link(document.links[document.links.length-1]))</script>]
01/10/07"Integrated Assessment" Report
10/12/07Structural Evaluation Report
12/12/08Summary Report- Halaco Emergency Response and Removal Assessment Work- 2006/2007
12/12/08Screening-level Ecological and Human Health Risk Assessment, Halaco Site
12/30/08Preliminary Evalution of the Sources, Nature, Extent, and Movement of Contamination in Surface Water and Groundwater, Halaco Site
02/06/09EPA testing plan for the Halaco Superfund Site
10/01/09Halaco Field Sampling and QA Project Plan ("Sampling and Analysis Plan")
12/11/09Halaco Building Assessment Report
02/04/10Engineering Evaluation and Cost Analysis Report / Response to Comments on EE/CA / Action Memorandum for Building Demolition
02/22/11Solid Matrix Sampling and Analysis Results for the NCL-East and NCL-North Areas, Halaco Superfund Site Remedial Investigation, Oxnard, CA (corrected version_03/16/11)
03/17/11 Solid Matrix Sampling and Analysis Results for the Wetlands and Beach Areas, Halaco Superfund Site Remedial Investigation, Oxnard, CA
06/09/11Solid Matrix Sampling and Analysis Results for the Oxnard Industrial Drain and Lagoon Areas, Halaco Superfund Site
08/29/11Solid Matrix and Soil Gas Sampling and Analysis Results for the Smelter Parcel and Waste Management Areas, Halaco Superfund Site
03/15/12Surface Water and Groundwater Sampling and Analysis Results, Halaco Superfund Site
12/20/122nd Addendum to the 2009 Sampling and Analysis Plan
01/01/13“Step-out" Solid Matrix Sampling and Analysis Results and Sediment Chromium Speciation, Halaco Superfund Site
Hide details for [<script>document.write("26".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Pacific Coast Pipeline".link(document.links[document.links.length-1]))</script>]
02/01/84Environmental Evaluation Report
06/26/87Assessment of Exposure and Public Health Risks During the Excavation of a Refinery Wastes Contaminated Site
09/29/89Remedial Investigation / Feasibility Study Workplan for the Texaco Facility - Fillmore, California
06/27/91Final Remedial Investigation Report, Texaco Fillmore Facility
12/10/91Final Baseline Risk Assessment
02/01/92Final Texaco Fillmore Site Feasiblity Study Report
12/16/94Final Phase 2 Design Report
05/02/95Final Phase 2 Remedial Action Work Plan
09/28/01First Five-Year Review Report
10/16/02Technical Memorandum - Proposal for Ground Water Treatment System Operational Modification and Pilot Study for Enhanced Bioremediation
05/26/05Evaluation of the Enhanced Bioattenuation Pilot Study
09/28/06Second Five-Year Review Report
11/14/07Report of Natural Attenuation & Soil Vapor Characteristics Above Dissolved-Phase Benzene-Plumes
01/12/10Reuse Assessment
04/20/10Addendum to 2nd Five Year Review
01/14/11Final Remedial Investigation / Focused Feasibility Study (RI/FS)
09/20/11Five-year Review Report, Third
06/15/12Groundwater Project Work Plan (excluding Appendix A)
02/15/13Quarterly Groundwater Monitoring Reporting for Fourth Quarter 2012
03/26/13Dust Suppression and Air Monitoring Plan
04/26/13Final Soil Remedial Action Work Plan (excluding appendices)
04/29/13Final Soil Remedial Design
Hide details for [<script>document.write("San Fernando Valley (All Areas)".link(document.links[document.links.length-1]))</scri
08/01/961995 Groundwater Quality Monitoring Report
06/01/971996 Groundwater Quality Monitoring Report
06/01/981997 Groundwater Quality Monitoring Report
02/01/991998 Groundwater Quality Monitoring Report
02/01/991999 Groundwater Quality Monitoring Report
03/01/002000 Groundwater Quality Monitoring Report
03/01/012001 Groundwater Quality Monitoring Report
08/01/032002 Groundwater Quality Monitoring Report
01/30/04San Fernando Valley Modeling Results
07/01/042003 Groundwater Quality Monitoring Report
07/01/052004 Groundwater Quality Monitoring Report
01/01/072005 Groundwater Quality Monitoring Report
12/01/072006 Groundwater Quality Monitoring Report
03/10/08San Fernando Valley Chromium Workshop Material
07/01/092007 Groundwater Quality Monitoring Report
Hide details for [<script>document.write("San Fernando Valley (area 1 North Hollywood And Burbank)".link(document.links[documen
12/01/92Remedial Investigation of Groundwater Contamination in the San Fernando Valley
07/08/93North Hollywood, 1st Five-Year Review
10/12/95General Notice and Special Notice Letters Recipients
10/31/97List of No Further Action Recipients
10/31/97List of NFA Recipients
08/17/98North Hollywood, 2nd Five-Year Review
09/30/03North Hollywood, 3rd Five-Year Review
09/30/04Burbank, 1st Five-Year Review
09/30/08North Hollywood and Burbank, Five-Year Review
07/10/09North Hollywood OU, Focused Feasibility Study
10/05/11Final Remedial Design Work Plan
03/14/12Data Gap Analysis Report
09/10/12Health and Safety Plan for Phase 1 Pre-Design Investation
09/10/12Sampling and Analysis Plan for Phase 1 Pre-Design Investigation
09/10/12Work Plan for Phase 1 Pre-Design Investigation
09/10/12Remedial Design Quality Assurance Project Plan
09/30/13Second Five-Year Review Report for San Fernando Valley (Area 1) Superfund Site, North Hollywood and Burbank
Hide details for [<script>document.write("27".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Jet Propulsion Laboratory (NASA)".link(document.links[document.links.length-1]))</scr
02/17/12First Five Year Review Report, National Aeronautics and Space Administration Jet Propulsion Laboratory, Pasadena, California
Hide details for [<script>document.write("San Fernando Valley (area 3 Verdugo)".link(document.links[document.links.length-1]))<
05/20/04Final Close Out Report
Hide details for [<script>document.write("28,31".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("San Gabriel Valley (area 1) El Monte, South El Monte, Whittier Narrows".link(document
09/28/06Whittier Narrows Five Year Review Report
09/14/11Whittier Narrows Second Five Year Review Report
09/11/132013 Five Year Review
Hide details for [<script>document.write("29".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("San Fernando Valley (area 2 Glendale)".link(document.links[document.links.length-1]))
09/30/08Five Year Review Report
05/01/11Tentative: Former Excello Plating Site Prospective Purchaser Agreement Resolution (4057 and 4059 Goodwin Avenue, City of Los Angeles, County of Los Angeles) (LARWQCB)
05/01/11Tentative: Former Excello Plating Site Prospective Purchaser Agreement & Covenant Not to Sue (LARWQCB)
11/21/11Final Data Compilation & Evaluation Report, Final Specified Work Plan - Glendale Chromium Operable Unit
01/01/12Timeline of Actions to Address Chromium Contamination in San Fernando Valley (1989-2011)
04/01/12Field Sampling Plan, Remedial Investigation at San Fernando Valley Area 2 Superfund Site - Glendale Chromium Operable Unit
04/01/12Remedial Investigation Work Plan, San Fernando Valley Area 2 Superfund Site - Glendale Chromium Operable Unit
04/01/12Quality Assurance Project Plan, Remedial Investigation at San Fernando Valley Area 2 Superfund Site - Glendale Chromium Operable Unit
09/30/13Second Five-Year Review Report for San Fernando Valley - Area 2 Superfund Site, Glendale
Hide details for [<script>document.write("31".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Operating Industries, Inc. Landfill".link(document.links[document.links.length-1]))</
06/21/95First Five Year Review Report
02/18/00Second Five Year Review Report
09/28/05Third Five-Year Review Report - OII Landfill Superfund Site
09/27/10Fourth Five-Year Review Report
Hide details for [<script>document.write("San Gabriel Valley Area 3".link(document.links[document.links.length-1]))</script>]
06/01/09Final Report Remedial Investigation San Gabriel Valley Area 3 - Appendix G
06/01/09Final Report Remedial Investigation San Gabriel Valley Area 3
06/01/09Final Report Remedial Investigation San Gabriel Valley Area 3 - Appendix A
06/01/09Final Report Remedial Investigation San Gabriel Valley Area 3 - Appendix C, D and E
06/01/09Final Report Remedial Investigation San Gabriel Valley Area 3 - Appendix B
06/01/09Final Report Remedial Investigation San Gabriel Valley Area 3 - Appendix F
Hide details for [<script>document.write("San Gabriel Valley (area 2) Baldwin Park".link(document.links[document.links.length-1
09/30/03Interim Remedial Action Report - La Puente Valley County Water District Subproject Operable Unit 2
09/30/04Interim Remedial Action Report - San Gabriel Valley Water Company Plant B6 Subproject Operable Unit 3
03/31/05Interim Remedial Action Report - Valley County Water District Subproject Operable Unit 4
09/28/06Interim Remedial Action Report - San Gabriel Valley Water Company Plant B5 Subproject Operable Unit 5
09/27/07Five-Year Review Report
04/18/082007 Annual Performance Evaluation Report
04/10/092008 Annual Performance Evaluation Report
03/31/102009 Annual Performance Evaluation Report
04/06/112010 Annual Performance Evaluation Report
03/31/122011 Annual Performance Evaluation Report
09/24/12Second Five-Year Review Report
04/01/13 2012 Annual Performance Evaluation Report
12/06/13Supplemental Tables for the 2012 Annual Performance Evaluation Report (Tables 5-4 and 5-5)
04/07/142013 Annual Performance Evaluation Report
Hide details for [<script>document.write("33".link(document.links[document.links.length-1]))</script>]
Hide details for [<script>document.write("Cooper Drum Co.".link(document.links[document.links.length-1]))</script>]
05/15/02Remedial Investigation Feasibility Study Report - Volume 1
04/01/05Final Results of HRC Field Pilot Study
07/01/06Remedial Design Technical Memorandum For Field Sampling Results
12/01/06Fields Pilot Study Of In Sity Chemical Oxidation Using Ozone And Hydrogen Peroxide To Treat Contaminated Groundwater At The Cooper Drum Company Superfund Site
03/27/07Remedial Design Technical Memorandym for Field Sampling Results - Addendum No. 1, Groundwater Monitoring Report August 2006
06/25/07Remedial Design Technical Memorandum for Field Sampling Results - Addendum No. 2, CPT/Hydropunch Sampling Results February/March 2007
09/18/07Soil Remedial Design Report, OU 2


Top of Page

Jump to main content.