Lawrence Livermore National Laboratory (site 300) (USDOE)

EPA #: CA2890090002

State: California(CA)

County: Alameda/San Joaquin

City: 15 miles east of Livermore

Congressional District: 10

Other Names:

Bulletin Board

Links

Description and History

NPL Listing History

NPL Status: Final

Proposed Date: 07/14/89

Final Date: 08/30/90

Deleted Date:

The 11-square mile Lawrence Livermore National Laboratory (Site 300) was developed in the 1950s as a research facility. It is operated by the Lawrence Livermore National Security, LLC, for the U.S. Department of Energy (DOE) primarily as a high-explosives and materials testing site in support of nuclear weapons research. Approximately 350 people who work in the area are provided with drinking water from groundwater in the area. Most are laboratory employees and State of California employees who work in a nearby State vehicular recreation area. Adjacent ranch houses and a State fire station also draw drinking water from the aquifer.

Top of page

Contaminants and Risks

Contaminated Media
  • Groundwater
  • Soil and Sludges

Groundwater and soil have been contaminated with solvents and other volatile organic compounds (VOCs), tritium, uranium-238, high explosive compounds (HMX, RDX), nitrate, and perchlorate. The primary health threat is drinking contaminated groundwater.

Top of page

Who is Involved

This site is being addressed as a Federal Facility with DOE as the lead agency. EPA, California Department of Toxic Substances Control (DTSC) and Central Valley Regional Water Quality Control Board (RWQCB) are signatories to the Federal Facility Agreement (FFA).

Top of page

Investigation and Cleanup Activities

This site is being addressed through a combination of removal actions and remedial actions. The Site has been divided into 9 operable units to administratively track the progress of remediating contamination.

Initial Actions

Initial Actions: In the spring of 1991, DOE installed a groundwater extraction and treatment system to curtail the migration of a VOC contamination plume near the southern boundary of the site. In the fall of 1992, another plume of VOC-contaminated groundwater was discovered. A second extraction and treatment system was installed to control this plume. DOE also began capping two landfills to prevent rainwater runoff from causing contaminant migration. In 1995, DOE signed an interim groundwater Record of Decision (ROD) for the Building 834 OU (OU 2). In November 1995, DOE/LLNL and the regulatory agencies agreed to streamline the cleanup process by implementing removal actions where appropriate. In 1997, DOE signed a final ROD for the General Services Area OU (OU1). In 1998, groundwater pumping at the site boundary of the High Explosives Process Area OU (OU 4) was decided upon in an Action Memorandum. In 2001, an Interim ROD was signed for most of the remaining contaminated areas. In 2008, a Final ROD was signed for groundwater in OUs 2-8.

Site Studies

Entire Site: Site investigations have been conducted under the facility's Environmental Restoration Program. The Site Wide Remedial Investigation Report was finalized in April 1994. The Site Wide Feasibility Study was finalized in November 1999. In March 2001, an Interim ROD was signed for the following areas of contamination: Building 834 OU, Pit 6 Landfill, HE Process Area, Building 850 OU (excluding Pit 7 complex), Building 854 OU, Building 832 Canyon, Building 801 Dry Well and Pit 8 Landfill, Building 833, Building 845 Firing Table and Pit 9 Landfill, and Building 851 Firing Table. In 2006, DOE finalized a Remedial Investigation (RI) and Feasibility Study (FS) for the Pit 7 complex, a subarea of OU 5. In 2008, a Final ROD was signed for groundwater in OUs 2-8. DOE conducted a non-time-critical removal action for PCB contaminated soil in OU5. The RA construction completion for all of OU5 was documented in 2011.


An RI/FS is being prepared for the Building 812 OU (OU9) - scheduled to be completed by 2015; one for Building 865 (OU8); and another for Building 850 Perchlorate (OU5). The Record of Decision Amendment is scheduled to be completed by 2017.

Remedy Selected

The Site-Wide FS, ROD, and Five Year Reviews are located on-line at http://www-erd.llnl.gov/library/

A Federal Facilities Agreement was signed between EPA, DOE, and the State agencies in June 1992. It outlines DOE's responsibilities and milestones for addressing site contamination.

Top of page

Cleanup Results to Date

Groundwater is being pumped and treated at several locations (GSA, Building 834, HE Process Area, Building 832 Canyon). Soil Vapor Extraction to treat VOCs in the vadose zone is being conducted at GSA and Building 834 and Building 832 Canyon. Treatability studies have been conducted for perchlorate; perchlorate is treated by ion exchange and/or bioreactors.

Top of page

Potentially Responsible Parties

Potentially responsible parties (PRPs) refers to companies that are potentially responsible for generating, transporting, or disposing of the hazardous waste found at the site.


DOE is responsible for contamination at this site. They are the lead Agency. Their work is overseen by EPA, as well as the State of California.

Top of page

Documents and Reports


Show details for Administrative RecordsAdministrative Records
Show details for Records of DecisionRecords of Decision

Top of page

Community Involvement

Public Meetings:

Top of page

Public Information Repositories

The public information repositories for the site are at the following locations:

Livermore Public Library,
1000 South Livermore Avenue,
Livermore, CA 94550

The most complete collection of documents is the official EPA site file, maintained at the following location:

Superfund Records Center

Mail Stop SFD-7C

95 Hawthorne Street, Room 403

San Francisco, CA 94105

(415) 820-4700

Enter main lobby of 75 Hawthorne street, go to 4th floor of South Wing Annex.

Additional Links

Administrative Records and Records of Decision can be found here: http://www-erd.llnl.gov/library/
Records of Decision, other documents, and additional information can be found here: http://www.envirostor.dtsc.ca.gov/public/hwmp_profile_report.asp?global_id=CA2890090002

Top of page

Contacts

EPA Site Manager
Andrew Bain
415-972-3167
Bain.Andrew@epamail.epa.gov
US EPA Region 9
Mail Code SFD
75 Hawthorne Street
San Francisco, CA 94105
EPA Community Involvement Coordinator
Viola Cooper
415-972-3243
1-800-231-3075
Cooper.Viola@epamail.epa.gov
US EPA Region 9
Mail Code SFD
75 Hawthorne Street
San Francisco, CA 94105
EPA Public Information Center
415-947-8701
r9.info@epa.gov
State Contact
Jacinto Soto
510 540-3842
JSoto@dtsc.ca.gov
DTSC
PRP Contact
Claire Holtzapple
925 422-0670
claire.holtzapple@oak.doe.gov
DOE Livermore Site Office
Community Contact
Marylia Kelley
925 443-7148
marylia@trivalleycares.org
Tri-Valley CAREs
http://www.trivalleycares.org/new/
Other Contacts
After Hours (Emergency Response)
US EPA
(800) 424-8802

Top of page



Jump to main content.