Jump to main content or area navigation.

Contact Us

Pacific Southwest, Region 9: Superfund

Serving Arizona, California, Hawaii, Nevada, the Pacific Islands, and Tribal Nations

San Gabriel Valley (area 4) City Of Industry, Puente Valley

EPA #: CAD980817985

State: California(CA)

County: Los Angeles

City: Los Angeles

Congressional District: 38

Other Names:

Links

Description and History

NPL Listing History

NPL Status: Final

Proposed Date: 09/08/83

Final Date: 05/08/84

Deleted Date:

The San Gabriel Valley Area 4 site is an area of contaminated groundwater that runs along San Jose Creek in La Puente. This site is one of four Superfund sites located in the 170-square-mile San Gabriel Valley. More than 30 square miles of groundwater under the Valley may be contaminated. The sites include four large areas of groundwater contamination that underlie significant portions of the Cities of Alhambra, Arcadia, Azusa, Baldwin Park, Industry, El Monte, La Puente, Monrovia, Rosemead, South El Monte, West Covina, and other areas of the San Gabriel Valley. Contamination of the groundwater by volatile organic compounds (VOCs) was first detected in 1979 when Aerojet Electrosystems in Azusa sampled nearby wells in the Valley County Water District. Following this discovery, the California Department of Health Services (CDHS) initiated a well sampling program to assess the extent of contamination. By 1984, 59 wells were found to be contaminated with VOCs. The basin's groundwater provides approximately 85 percent of the domestic water supply for more than 1,000,000 people who live in the Valley. Water supply wells are used in the basin to extract groundwater for industrial, business, agricultural, and domestic uses. Water utilities in the area provide clean water that meets all state drinking water standards.

Top of page

Contaminants and Risks

Contaminated Media
  • Groundwater
  • Soil and Sludges

Groundwater and soil are contaminated with various VOCs. The primary VOC contaminants are trichloroethylene (TCE), perchloroethylene (PCE), and 1,4-dioxane. Low levels of perchlorate have also been detected. People who inhale vapors from groundwater that contain VOCs could be exposed to hazardous substances. Currently, all drinking water provided meets Federal and State drinking water standards.

Top of page

Who is Involved

This site is being addressed through Federal and State actions.

Top of page

Investigation and Cleanup Activities

The cleanup approach is groundwater extraction and treatment at the western end of the Puente Valley. Three separate projects are planned to address and contain contaminated groundwater. These are known as the Shallow Zone North, Shallow Zone South and Intermediate Zone remedies.

The Shallow Zone North and Shallow Zone South remedies will include extraction wells capable of pumping approximately 2.0 million gallons per day (MGD). The project will include granular activated carbon water treatment equipment (for removal of VOCs), advanced oxidation equipment (for removal of 1,4-dioxane) and, ion exchange equipment (for removal of perchlorate). The design of the SZ South system is currently underway and may be completed in early 2016.

The treated water from the Shallow Zone North remedy was to be originally discharged to a local flood control channel. In light of new environmental concerns, EPA is re-evaluating this discharge option.

The Remedial Design Investigation (or RDI) for the Shallow Zone South remedy will be completed in Summer 2015.

The Intermediate Zone remedy may include up to eight extraction wells capable of pumping approximately 1.5 MGD. The project will include granular activated carbon water treatment equipment for removal of VOCs and advanced oxidation (for removal of 1,4-dioxane) ion exchange (for removal of perchlorate) and reverse osmosis to reduce inorganic constituents. Treated groundwater is anticipated to be provided to a local water supply distribution system.

Site Studies

Area-wide Contamination: In 1984, the EPA began a study of the nature and extent of contamination throughout the San Gabriel Valley. The intent of this investigation is to identify specific areas of the site for focused study and provide support to ongoing activities at all areas of the San Gabriel Valley site.

Site Studies

Puente Valley Area: Potentially responsible parties, under EPA oversight, investigated the nature and extent of contamination at the Puente Valley area. This phase of the project, commonly referred to as the Remedial Investigation/Feasibility Study (RI/FS) was completed in June 1996.

Site Studies

Source Identification and Control: The California Regional Water Quality Control Board, Los Angeles Region, working under a Cooperative Agreement with the EPA, is identifying sources of contaminants. To date, nearly 400 individual facilities throughout the San Gabriel Valley have been confirmed as having soil contamination.

Remedy Selected

The selected remedy for the PVOU includes extraction, containment and treatment of contaminated groundwater in the shallow and intermediate zones at the mouth of Puente Valley. The remedy also includes a set of wells for monitoring the groundwater in the shallow, intermediate, and deep zones at mid-valley and the mouth of the valley, to ensure that the remedy meets the performance criteria set in the September 1998 Record of Decision (ROD) and updated in the 2005 Explanation of Significant Differences (ESD) which included the contaminants 1,4-dioxane and perchlorate.. Cost estimates for the remedy assume that additional extraction and treatment systems will be needed for both the intermediate and shallow zones. The estimate also assumes that the treatment technology will be air stripping and adsorption of VOCs in the off-gas. The net worth of this interim remedy, at the time of the ESD, was approximately $51 million.
This remedy specifies criteria that the treatment system must meet while providing flexibility in implementing the system. For example, in the intermediate zone at the mouth of the valley, the ROD provides the option to either install a series of extraction wells or use an existing well-field extraction system, as long as the following performance criteria is met: "the remedial action shall provide sufficient hydraulic control, through groundwater extraction, to capture groundwater contaminated with VOCs above MCLs [Maximum Contaminant Levels allowed by State law], and prevent it from migrating into or beyond the B7 well field area (depending on the location of extraction)." The shallow zone remedy must comply with the following performance criteria: "the remedial action shall apply measures necessary to prevent further migration of groundwater in the shallow zone with VOCs above 10 times MCLs from migrating beyond its current lateral and vertical extent."

Extracted groundwater will be treated to remove VOCs and other constituents before it is discharged. EPA is evaluating discharge options in light of potential environmental concerns regarding discharge to surface water.

Remedy Design

The Remedial Investigation and Feasibility Study was completed in May 1997 and a cleanup plan adopted in September 1998 (the Puente Valley Operable Unit Interim Record of Decision). In September 2001, after negotiations failed, EPA ordered Carrier Corporation to design, build, and operate the shallow zone remedy. In March 2002, EPA issued a second order to TRW Inc. to design, build, and operate the intermediate zone remedy. TRW is now known as Northrop Grumman Systems Corporation (Northrop Grumman)). In June 2005, EPA issued an Explanation of Significant Differences (ESD) to update the 1998 cleanup plan by requiring additional treatment for 1,4-dioxane and possibly perchlorate. The Record of Decision is available on EPA’s website as part of the site overview for the San Gabriel Valley Area 4 Superfund Site.


In August 2005, EPA and the Department of Justice reached an agreement requiring United Technologies Corporation (UTC) and its subsidiary Carrier Corporation to implement the Shallow Zone North remedy. Significant work is underway. The Consent Decree also requires Carrier Corp. to carry out an environmental project at a former duck farm overlying a portion of the contaminated groundwater. The Watershed Conservation Authority purchased the former duck farm and plans to use it for the benefit of the local community. The environment project was completed in September 2014.

In August 2009, EPA and the Department of Justice reached an agreement with Northrop Grumman Corp. to implement the Intermediate Zone remedy in the form of a Consent Decree. In September 2011, EPA issued an order to Northrop Grumman to investigate, design, build, and operate the Shallow Zone South Remedy after lead agency oversight was transferred from the Los Angeles Regional Water Quality Control Board for work related to the former Benchmark Technology facility located in the City of Industry. In 2015, EPA plans to issue a new order to Northrop Grumman to conduct and RI/FS to address the source area located near and around the former Benchmark Technology facility.

With work underway in both the shallow and intermediate zones, EPA is continuing to negotiate settlement agreements with remaining parties. Fifteen settlements together worth approximately $17 million have been negotiated so far and others are in progress.

Top of page

Cleanup Results to Date

EPA continues to oversee installation of wells, pipelines, and other remedial activities in the City of La Puente, City of Industry and unincorporated areas of Los Angeles County. These structures are part of a groundwater cleanup project called the “San Gabriel Valley Superfund Site, Puente Valley Operable Unit” (PVOU). The goal of the project is to protect drinking water.

The cleanup system consists of three major parts: the “Intermediate Zone (or IZ) remedy”, the “Shallow Zone North (or SZ North) remedy”, and the “Shallow Zone South (or SZ South) remedy”. Northrop Grumman Corp. is responsible for the IZ and SZ South cleanup systems. Northrop Grumman has partially completed installation of extraction wells and pipelines for the IZ Remedy and construction of the water treatment plant is expected in spring 2016. United Technology Corporation/Carrier has completed installation of extraction wells and is conducting additional field activities for the SZ North. Northrop Grumman Corp. is currently conducting field investigations for the SZ South. Pipeline installation and construction of the SZ treatment plant system will begin as soon as an alternative discharge option for treated water is determined.

EPA thanks residents, business owners, and local governments for their cooperation an patience during site investigation and monitoring well installations. We are currently re-evaluating and expect to finalize all Remedial Designs related to the interim groundwater remedy in light of new environmental concerns by Fall 2016. We expect to complete all construction for the project by May 2017. Once constructed, the three groundwater cleanup systems may operate for approximately 15 to 30 years.

EPA and the companies have notified local residents and businesses of work through fact sheets and in flyers. EPA also hosted community meetings in La Puente to describe pipeline and other construction activities.

Top of page

Potentially Responsible Parties


Potentially responsible parties (PRPs) refers to companies that are potentially responsible for generating, transporting, or disposing of the hazardous waste found at the site.


PUENTE VALLEY OPERABLE UNIT
SPECIAL NOTICE RI/FS - 1993
ALPHABETICAL DISTRIBUTION LIST
(366 Kb, PDF format, requires Adobe Acrobat reader)

PVOU PRP List for 1993, 1997, 1999, 2000.pdf

Top of page

Documents and Reports


Show details for Administrative RecordsAdministrative Records
Show details for Fact SheetsFact Sheets
Show details for MapsMaps
Show details for Records of DecisionRecords of Decision
Show details for Technical DocumentsTechnical Documents

Top of page

Community Involvement

Public Meetings:

Top of page

Public Information Repositories

The public information repositories for the site are at the following locations:

Hacienda Heights Public Library
16010 La Monde Street,
Hacienda Heights, CA 91745
(626) 968-9356

La Puente Public Library
15920 E. Central Avenue
La Puente, CA 91744
(626) 968-4613

West Covina Library
1801 West Covina Parkway
West Covina, CA 91790
(626) 962-3541

The most complete collection of documents is the official EPA site file, maintained at the following location:

Superfund Records Center

Mail Stop SFD-7C

95 Hawthorne Street, Room 403

San Francisco, CA 94105

(415) 820-4700

Enter main lobby of 75 Hawthorne street, go to 4th floor of South Wing Annex.

Additional Links

Top of page

Contacts

EPA Site Manager
Raymond Chavira
415-947-4218
Chavira.Raymond@epamail.epa.gov
US EPA Region 9
Mail Code SFD
75 Hawthorne Street
San Francisco, CA 94105
EPA Community Involvement Coordinator
Viola Cooper
415-972-3243
1-800-231-3075
Cooper.Viola@epamail.epa.gov
US EPA Region 9
Mail Code SFD
75 Hawthorne Street
San Francisco, CA 94105
EPA Public Information Center
415-947-8701
r9.info@epa.gov
State Contact
Deena Stanley
916-255-6583
Deena.Stanley@dtsc.ca.gov
California Department of Toxic Substances Control
8800 Cal Center Drive
Sacramento, CA 95826
PRP Contact

Amy Sullivan
(Intermediate Zone Remedy
Shallow Zone South Remedy and Benchmark Source Area)


Bradley A. Barquest
(Shallow Zone North Remedy)

310-600-4571






763-432-5695

Amy.Sullivan@ngc.com






bradley.barquest@utc.com

Northrop Grumman Corp.
2989 Fairview Park Drive
Falls Church, VA 22142




United Technologies / Carrier,
9716 Avocet Street NW,
Coon Rapids, MN 55433
Community Contact
Other Contacts
After Hours (Emergency Response)
US EPA
(800) 424-8802

Top of page



Jump to main content.