Date Title / pdf File
09/01/04 NEWMARK OU: Remedial Action Report

NEWMARK OU
FINAL INTERIM REMEDIAL ACTION REPORT (VOLUME I)
FILES
Table of Contents Table of Contents from Final Interim RA Report.pdf
Section 1 through Section 11:

1.0 Introduction
2.0 Operable Unit Background
3.0 Construction Activities
4.0 Chronology of Events
5.0 Performance Standards and Construction Quality Control
6.0 Final Inspection and Certification
7.0 Operation and Maintenance
8.0 Summary of Project Costs
9.0 Observations and Lessons Learned
10.0 Points of Contact
11.0 References
sec1.0-11.1 pp.1-1 to 11-1.pdf
Appendix A: Construction Inspection Reports

A1: North and South Plants Construction and Sitework

A2: Granular Activated Carbon Vessel
1 1.0 Introduction - 2.0 Concrete Summary
Appendix A: Concrete Test Results
2 Appendix C: Change Order Request Log

A3: Mountain View Overcrossing Bridge Penetration

A4: North Plant Transmission Pipeline
1 1.0 Introduction - 2.0 Construction Summary
Appendix A: Compaction Test Results
Appendix B: Concrete Test Results
2 Appendix C: Change Order Request Log
A1 .pdf

A2 (1) .pdf A2 (2) .pdf

A3 .pdf

A4 (1).pdf A4 (2).pdf
NEWMARK OU
FINAL INTERIM REMEDIAL ACTION REPORT (VOLUME II)
FILES
Appendix A (continued):

A5: South Plant Transmission Pipeline Phase I and Phase II
1.0 Introduction - 2.0 Construction Summary
Appendix A: Compaction Test Results
Appendix B: Change Order Request Log
1
1. Change Order No. 1 Item No. 1 Breakdown
2. Change Order No. 1 Item No. 2 Breakdown
3. Change Order No. 1 Item No. 3 Breakdown
4. Change Order No. 1 Item No. 4 Breakdown
2
5. Change Order No. 1 Item No. 5 Breakdown
6. Change Order No. 1 Item No. 6 Breakdown
7. Change Order No. 1 Item No. 7 Breakdown
8. Change Order No. 1 Item No. 8 Breakdown
9. Change Order No. 1 Item No. 9 Breakdown
10. Change Order No. 1 Item No. 10 Breakdown
3
11. Change Order No. 1 Item No. 11 Breakdown
12. Change Order No. 1 Item No. 12 Breakdown
13. Change Order No. 1 Item No. 13 Breakdown
14. Change Order No. 1 Item No. 14 Breakdown
15. Change Order No. 1 Item No. 15 Breakdown
Change Order No. 3 to Contract No. 1267
4
Change Order No. 3 to Contract No. 1267
Change Order No. 2 to Contract No. 1267
5
Change Order No. 1 to Contract 1267
Exceptions to Bid Specification No. 1277
6
Bid Proposal Specification No. 1267
Appendix C: Punch List
1
Newmark O/U South Pipeline Segment 1
2
Newmark Waterline 11th Street Pipeline Cut Sheets
3
Material List Per Sheet

A6: South Plant Transmission Pipeline Phase III
A5 sec 1.0-appA.pdf

A5 appB (1).pdf A5 appB (2) .pdf A5 appB (3).pdf A5 appB (4) .pdfA5 appB (5) .pdf A5 appB (6).pdf

A5 appC (1).pdf A5 appC (2).pdf A5 appC (3).pdf

A6 .pdf
Appendix B: Construction Photographs

A1-1 North Plant- Site Clearing
A1-2 North Plant- Disturbed Utilities
A1-3 North Plant- Exposed Unidentified Pipe
A1-4 North Plant- Brick Septic Tank
A1-5 North Plant- Yard Piping
A1-6 North Plant- Yard Piping
A1-7 North Plant- Compaction of Excavation
A1-8 North Plant- Compaction of Excavation
A1-9 North Plant- Installing the Anti-Srphon Loop
A1-10 North Plant- Anti-Srphoon Loop Installation
A1-11 North Plant- GAC Vessel Concrete Pad Reinforcing Bar
A1-12 North Plant- Concrete Pad
A1-13 North Plant- Concrete Pad
A1-14 North Plant- GAC Vessel Concrete Pad
A1-15 North Plant- GAC Vessel Installation
A1-16 North Plant- Conduitinstallation
A1-17 Waterman Plant- Yard Piping
A1-18 Waterman Plant- Yard Piping
A1-19 Waterman Plant- Tie-into Reservoir
A1-20 Waterman Plant- Concrete Pad Installation
A1-21 Waterman Plant- GAC Vessel Pad Form Work, and Reinforcing Bar
A2-1 US Filter Underdam System 20,000 lb Vessel
A2-2 Northwest Carbon Red Bluff, Valve Tree Assembly for GAC Vessel
A2-3 Northwest Carbon Manufacturing Facility Red-Bluff, CA
A2-4 Northwest Carbon Red-Bluff Manufacturing Facility
A3 Bridge Crossing-Pipe Support Saddles
A4-1 North Plant Pipeline- Storm Water Channel Pipeline Concrete Encasement
A4-2 North Plant Pipeline- Storm Water Channel Repair
A5-1 South Plant Pipeline- Pipeline Installation
A5-2 South Plant Pipeline- 12" PVC Pipeline Installation
A5-3 South Plant Pipeline- Pipeline Installation
A5-4 South Plant Pipeline- Pipeline Installation
A5-5 South Plant Pipeline- Pipeline Installation
A5-6 South Plant- CAV, Butterfly Valve, and Blow-off Assembly
A5-7 South Plant Pipeline- Valve Can Installation
A5-8 South Plant Pipeline- Air Vacuum Valve Installation
A5-9 South Plant Pipeline- Pipeline Installation
A5-10 South Plant Pipeline- Pipeline Installation
A5-11 South Plant Pipeline- Pipeline Installation
A5-12 South Plant Pipeline- Pipeline Installation
A5-13 South Plant Pipeline- Blow-off Valve Installation
A5-14 South Plant Pipeline- Pipeline Installation
A5-15 South Plant Pipeline- Trench Paving
A7 North Plant- Pressure Sustaining Valve Installation
appB.pdf


















Appendix C: List of DocumentationappC.pdf
Appendix D: System Drawings

1
G-2 Sheet Index and General Notes
G-3 Vicinity and Location Maps
G-4 Legend & Symbols
P-1 North Plant Process Flow Diagrams
P-2 North Plant Piping and Instrumentation Diagram
P-3 North Plant Piping and Instrumentation Diagram
P-4 North Plant Piping and Instrumentation Digram
P-5 North Plant Piping and Instrumentation Diagram
P-6 North Plant Carbon Units Valve Schedule
P-7 Waterman Plant Process Flow Diagram
P-8 Waterman Plant Piping and Instrumentation Diagram
P-9 Waterman Plant Piping and Instrumentation Diagram
P-10 Waterman Plant Piping and Instrumentation Diagram
P-11 Waterman Plant Piping and Instrumentation Diagram
P-12 Waterman Plant Carbon Unit Valve Schedule
C-1 North Plant Demolition Plan
C-2 North Plant Site Grading and Paving
C-3 North Plant Yard Piping

2
C-4 North Plant Site Layout
C-5 North Plant Carbon Treatment System Layout
C-6 North Plant Piping and Backwash Drain Plan and Sections C-7 Waterman Plant Irrigation
C-8 Waterman Plant Site Grading and Paving
C-9 Waterman Plant Yard Piping
C-10 Waterman Plant Site Layout
C-11 Waterman Plant Carbon Treatment System Layout
C-12 Waterman Plant Piping and Backwash Drain Plan and Sections
C-13 Standard Details
C-14 Standard Details
S-1 North Plant Structural Details
S-2 Waterman Plant Structural Details
S-3 Concrete Details
E-1 Carbon Filters Monitor Panel
E-2 Carbon Filter Panel PLC Diagrams

3
E-3 Carbon Filter/ Waterman Electrical Site Plan
E-4 Carbon Filter/ North Plant Electrical Site Plan
E-6 Electrical Details
E-7 Control Building North Plant
G-3 Legend & Symbols
P-6 South Plants Process Flow Diagrams
P-12 17th Street Piping and Instrumentation Diagram
C-13 17th Street Plant Site Layout
C-14 17th Street Typical Carbon Unit Crossover Loop Piping
E-1 Carbon Filters Monitor Panel
E-2 Carbon Filter Panel PLC Diagrams
E-5 Carbon Filter/ 17th Street Electrical Site Plan
E-6 Electrical Details
1 Location Maps & General Notes
2 Sheet Index, Legend & Abbreviations

4
3 Plan and Profile Western Ave.
4 Plan and Profile Western Ave. Flood Control Levee
5 Miscellaneous Details
6 Miscellaneous Details
1 Location Maps General Notes
2 Index, Legend and Abbreviations

5
3 Plan and Profile Sierra Way
4 Plan and Profile 11th St.

6
5 Plan and Profile 11th St. & Moutain View Ave.
6 Plan and Profile 11th St. & Sierra Way
7 Plan and Profile 11th St.

7
8 Plan and Profile Mountain View Ave.
9 Plan and Profile Mountain View Ave.

8
10 Plan and Profile Mountain View Ave.
11 Plan and Profile Mountain View Ave

9
12 Plan and Profile Mountain View Ave.
13 Plan and Profile Mountain View Ave.

10
4 Plan and Profile Mountain View Ave.
15 Plan and Profile Mountain View Ave.

11
15 Plan and Profile Mountain View Ave.
17 Plan and Profile Marshall Blvd.
18 Plan and Profile Marshall Blvd.

12
19 Plan and Profile Leroy St.
20 South Plant Pipeline Waterman Plant Improvements
21 Plan and Profile 17th St.
22 Miscellaneous Details
23 Miscellaneous Details
24 Mountain View Ave. Overcrossing Details

13
25 Mountain View Ave, Overcrossing Details
G-2 Treatment Plant Partial Site Plans
G-1 Vicinity and Location Maps
C-2 17th Street Plant Standard Details
C-3 Waterman Plant Standard Details
appD (1).pdf appD (2).pdf appD (3).pdf appD (4).pdf appD (5).pdf appD (6).pdf appD (7).pdf appD (8).pdf appD (9).pdf appD (10).pdf appD (11).pdf appD (12).pdfappD (13).pdf