September 1997 Record of Decision (part 3)

Administrative Record Index

To request copies of administrative record documents, an electronic order form is available.

The documents contained in this administrative record (AR) were used by the U.S. Environmental Protection Agency (EPA) in identifying appropriate remedial activities for the Record of Decision (ROD) signed by EPA on September 30, 1997. This ROD addresses sources in the Slickrock Creek watershed at the Iron Mountain Mine Superfund site near Redding, California. The original AR compilation and its first three supplements were referred to as “Spring Creek Debris Dam Operable Unit”, because the documents supported EPA’s 1994 Proposed Plan to enlarge the Spring Creek Debris Dam. For administrative convenience, Supplements 4-8 continued to be identified as “Spring Creek Debris Dam Operable Unit” even though the Proposed Plan for May 1996 did not propose enlargement or modification of the dam. With this final supplement and the signing of ROD4, however, the administrative record has finally adopted its current, more accurate title. Key documents in this administrative record include the 1994 Proposed Plan (AR #355), the 1996 Proposed Plan (AR #1424), EPA’s response to comments (AR #2396 - #2400) and the ROD (AR #2395).
Eight previous administrative records are included by reference in this September 1997 Record of Decision administrative record: the October 1986 Record of Decision AR, the 1988 Removal AR, the Administrative Order 89-18 AR, the Administrative Order 91-07 AR, the Boulder Creek Operable Unit, September 1992 Record of Decision AR, the Unilateral Administrative Order 92-96 AR, the Old/#8 Mine Seep OU AR, and the Flat Creek Bridge Removal Action AR.

The administrative record file was added to as documents became available. The file was updated in nine supplements and contains 2400 documents (not including documents incorporated by reference). The cumulative index lists the documents in ascending chronological order.

The list of U.S. Environmental Protection Agency guidance documents which were considered or relied upon in the selection of the remedy are documents AR #28, #1281 and #1677. Copies of the guidance documents are contained in the Compendium of CERCLA Response Selection Guidance Documents located in the Region 9 Superfund Records Center.

March 4, 1998

List of Abbreviations and Acronyms Used in Administrative Record Index

ABBREVIATIONMEANING
ACSAmerican Chemical Society
ADSAdvanced Drainage Systems, Inc.
AIDSAuto Immune Deficiency Syndrome
AIMEAmerican Institute of Mining, Metallurgical and Petroleum Engineers
AMDAcid Mine Drainage
AMSAcid Mine Spillage
AOAdministrative Order
APCOAir Pollution Control Officer
ASMAerated Simple Mix
AssocAssociates
ATSDRAgency for Toxic Substances and Disease Registry
attchattachment
BCMOMouth of Boulder Creek
BFPBrick Flat Pit
BHPCompany name
BLMBureau of Land Management
BORBureau of Reclamation (U.S. Department of Interior)
CACooperative Agreement or State of California
CADDComputer Aided Design
CADOWRCalifornia Department of Water Resources
CaOCalcium Oxide
CERCLAComprehensive Environmental Response, Compensation, and Liability Act of 1980 (Superfund)
CFRCode of Federal Regulations
CH2M HillEnvironmental Company
CIMCanadian Institute of Mining
CoCompany
CONCEPTCConceptual Design Concurrence
CRContaminant Resistant
CRWQCBCalifornia Regional Water Quality Control Board
CrystaBONDTrademark
CVPCentral Valley Project
DFGDepartment of Fish and Game
DNADeoxyribonucleic Acid
DOJDepartment of Justice
DTSCCalifornia Department of Toxic Substances Control
E&MJEngineering and Mining Journal
EAEnvironmental Analysis
EBMUDEast Bay Municipal Utilities District
EIMCOCompany name
EIREnvironmental Impact Report
EISEnvironmental Impact Statement
enclenclosure
EPAEnvironmental Protection Agency
ESUEvolutionarily Significant Unit
FFSFocus Feasibility Study
FLTBTributary to Flat Creek
FOIAFreedom of Information Act
FORTRANProgramming language
frfrom
FSFeasibility Study
FSAFood Security Act
FSPField Sampling Plan
FYFiscal Year
GLCGas Liquid Chromatography
GSAGeneral Services Administration
HBMSHudson Bay Mining and Smelting Co.
HDSHigh Density Sludge
HDSTPHigh Density Sludge Treatment Plan
HSPFHydrologic Simulation Program FORTRAN
IAGInteragency Agreement
ICIPRP contractor
ICIAICI Americas (PRP contractor)
IMIron Mountain
IMMIron Mountain Mine
IMMIIron Mountain Mine, Inc.
IMMWQIron Mountain Mine Water Quality
MDAMethylenedianilline
MgOMagnesium Oxide
MKMorrison Knudsen
MMAJMetal Mining Agency of Japan
MRRCMining Remedial Recovery Co., Inc.
MSCAMulti-Site Cooperative Agreement
mtgmeeting
NNorth
NAWQANational Ambient Water Quality Assessment
NPDESNational Pollutant Discharge Elimination System
NPLNational Priorities List
OHState of Ohio
ORCOffice of Regional Counsel
OUOperable Unit
P&IDPiping & Instrumentation Design
PACETrademark
PG&EPacific Gas and Electric
pHAcidity/Alkalinity
PMFProbable Maximum Flood
PMTProject Management Team
PRPPotentially Responsible Party
QAQuality Assurance
QAPPQuality Assurance Project Plan
RRiver
RARemedial Action
RA/RIRemedial Action/Remedial Investigation
RDRemedial Design
RD/RARemedial Design/Remedial Action
REVIEWCType of decision memo from U.S. Department of Interior
RIRemedial Investigation
RI/FSRemedial Investigation/Feasibility Study
ROCRecord of Communication
RODRecord of Decision
RPRhone-Poulenc
rptreport
SSouth
SactoSacramento
SAPSampling and Analysis Plan
SCAPSuperfund Comprehensive (or Consolidated) Accomplishments Plan
SCDDSpring Creek Debris Dam
SEASpaulding Environmental Associates
SEEDSafety Evaluation of Existing Dams
SFSan Francisco
SMARASurface Mining & Reclamation Act
SMCStauffer Management Co.
SNSAShasta Natural Science Association
SOWStatement of Work or Scope of Work
SPECBSpecifications (having to do with bids)
SRCSlickrock Creek
SRTPCPSacramento River Toxic Pollutant Control Program
SRWPSacramento River Watershed Program
SSPSite Safety Plan
SVTCSacramento Valley Toxics Campaign
TATechnical Assistance
TACTechnical Advisory Committee
TAGTechnical Assistance Grant
TLTransmittal Letter
TSCSuperfund Technical Support Center (Hotline)
UAOUnilateral Administrative Order
UCUniversity of California
USUnited States
USAUnited States Army
USBRUnited States Bureau of Reclamation (U.S. Department of Interior)
USDOIUnited States Department of Interior
USFWSUnited States Fish and Wildlife Service (U.S. Department of Interior)
USGSUnited States Geologic Survey
vversus or volume
w/with
w/owithout
WQMWater Quality Management Plan
ZnZinc

Administrative Record Index

Doc DateAuthor / Author Org.Addressee / Addressee Org.Title / SubjectDoc ID
9/16/1994Morrison Knudsen CorpStauffer Management CoOversize drawing: Slickrock base flow collection surface features plan (pre-final, for bid purpose only) (box 9)63743
9/19/1994US Dept of the Interior - Bureau of Reclamation -Spring Creek water quality rpt w/TL to R Sugarek fr C Sarsfield57200
9/21/1994Robert Dewey / US Dept of the Interior - Bureau of Reclamation -Design team mtg #12, final designs60557
9/23/1994Joseph Kelly / Stauffer Management CoRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Response to 104(e) request for information - list of objections to info request60549
9/26/1994Jeff Zelikson / Environmental Protection Agency - Region 9Michael Schulters / US Geological SurveyLtr: request for signature on IAG amendment, w/IAG amendment & SOW63249
9/26/1994Morrison Knudsen Corp -Clean water diversion calculations - summary of excavation, rd fill, structure, rd ditch excavation volume (box 5)58121
9/26/1994Lee Erickson / Zeneca IncDennis Heiman / CA Regional Water Quality Control Board - Central Valley RegionLtr: Modification of Central Valley Basin plan objective in Sacramento River62581
9/26/1994Ivan Joya / Morrison Knudsen CorpMark Tavelli / Morrison Knudsen CorpMemo: Base flow pumping system design, w/ marginalia (box 9)63750
9/27/1994Morrison Knudsen Corp -Slickrock Creek clean water diversion - Flood hydrology & hydraulic computations56868
9/27/1994Morrison Knudsen Corp -Abstract of proposals - Slickrock baseflow collection base bid (box 10)63845
9/28/1994C H 2 M Hill, Inc -Responses to CH2M Hill review comments 9/12/94 & 9/26/9456107
9/28/1994John Spitzley / C H 2 M Hill, IncLloyd Freese / Stauffer Management CoMemo: Requests cost information62524
9/28/1994Morrison Knudsen Corp -Curb calculations (box 5)63748
9/29/1994Mary MaloneyHuss / Stauffer Management CoDuncan Austin / CA Environmental Protection Agency - Dept of Toxic Substances Control
James Pedri / CA Regional Water Quality Control Board - Central Valley Region
Harry Rectenwald / CA Regional Water Quality Control Board - Central Valley Region
Ltr: Transmits copy of PACE engineering rpt & AutoCADD topography disks re EPA proposed expansion of SCDD60555
9/29/1994US Dept of the Interior - Bureau of Reclamation -Summary of SCDD dilution operations, 1987 to present, w/TL to R Sugarek fr K Doebbler62878
9/29/1994Mary MaloneyHuss / Stauffer Management CoRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Transmits draft confidentiality agreement w/encl & TL to R Sugarek fr M MaloneyHuss62470
9/29/1994John Spitzley / C H 2 M Hill, IncRichard Sugarek / Environmental Protection Agency - Region 9Memo: Revised feasibility cost estimates for 2-dam option & Slickrock Creek option, w/attch62580
9/30/1994John Spitzley / C H 2 M Hill, IncRichard Sugarek / Environmental Protection Agency - Region 9TL: Contract documents for construction of partial cap above Richmond Mine60554
9/30/1994Environmental Protection Agency - Region 9US Geological SurveyFully executed IAG amendment (signed) for technical support, w/SOW, & w/TL fr J Johansen to C Ely (undated)63247
10/1/1994CA Regional Water Quality Control Board - Central Valley Region -IMM monitoring rpt w/TL fr D Heiman56528
10/1/1994Emilie Reyes / CA Regional Water Quality Control Board - Central Valley Region -Review of copper, cadmium & zinc toxicity in freshwater aquatic organisms58022
10/1/1994Emilie Reyes / Univ of California, Davis
Valerie Connor / CA Regional Water Quality Control Board - Central Valley Region
Howard Bailey / Univ of California, Davis
David Hinton / Univ of California, Davis
-Role of microorganisms & zinc in ceriodaphnia mortality observed in Sacramento bioassays58023
10/1/1994Morrison Knudsen Corp -Slickrock Creek baseflow collection system description, w/marginalia (box 9)63194
10/1/1994Morrison Knudsen Corp -Handwritten notes: Baseflow collection calculations (box 9)63869
10/4/1994John Livingston / C H 2 M Hill, IncRichard Sugarek / Environmental Protection Agency - Region 9Memo: Prefinal design - Slickrock Creek baseflow collection & pumping system62935
10/4/1994Kevin Hennessy / Morrison Knudsen CorpAnne Connell / Morrison Knudsen Corp
Ivan Joya / Morrison Knudsen Corp
Ltr: Piping & instrumentation design (P&ID) status, w/marginalia (box 9)63835
10/4/1994Churn Creek ConstructionMorrison Knudsen CorpBid form - base bid schedule for Brick Flat Pit sulfide capping, w/attch p 2 (box 10)63850
10/4/1994Donald F Gallino, IncMorrison Knudsen CorpBid form - base bid schedule for Brick Flat Pit sulfide capping, w/attch p 2 (box 10)63851
10/5/1994Lloyd Freese / Stauffer Management CoRichard Sugarek / Environmental Protection Agency - Region 9TL: Response to comments on prelim designs62579
10/6/1994Michael Hingerty / Environmental Protection Agency - Region 9Joseph Kelly / Stauffer Management CoLtr: Implementation of unapproved response actions60552
10/6/1994Michael Hingerty / Environmental Protection Agency - Region 9Mary MaloneyHuss / Stauffer Management CoLtr: HDS information & draft confidentiality agreement60553
10/6/1994Morrison Knudsen Corp -Old/#8 & Slickrock Creek flow data, 11/30/93-1/25/94 (box 9)58123
10/7/1994Richard Sugarek / Environmental Protection Agency - Region 9Jacqueline Lane / Environmental Protection Agency - Region 9Site tour agenda 10/17-10/18/94 w/TL60550
10/7/1994Michael Hingerty / Environmental Protection Agency - Region 9Joseph Kelly / Stauffer Management CoLtr: Discusses legal issues re 104(e) request for information62471
10/7/1994John Spitzley / C H 2 M Hill, IncRichard Sugarek / Environmental Protection Agency - Region 9Memo: Missing info fr PACE engineering drainage study62578
10/7/1994Frank Peter / Zeneca IncRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Confirmation of agenda for mtgs at IMM on 10/12 & 10/13/9462819
10/10/1994Jim Stefanoff / C H 2 M Hill, Inc
John Spitzley / C H 2 M Hill, Inc
Richard Sugarek / Environmental Protection Agency - Region 9Memo: Review comments re Stauffer submittal review - Technical summary - use of magnesium oxide to treat acid mine drainage, 8/12/9457278
10/10/1994Morrison Knudsen Corp -Bid form - base bid schedule for Slickrock clean water diversion, w/marginalia (box 5)63751
10/11/1994Morrison Knudsen Corp -Slick Rock Creek clean water diversion bid quantities (modified), base bid schedule & pre-final drawings, 9/15/97-10/11-97, w/marginalia (box 5)58119
10/11/1994Morrison Knudsen Corp -Air vent calculations & drawings (box 5)58124
10/11/1994Morrison Knudsen Corp -Clean water diversion rd ditch data, calculations & drawings (box 5)58125
10/11/1994Larry Hall / Stauffer Management Co -Proposed 94-95 Slickrock Creek Basin investigation63028
10/13/1994US Dept of the Interior - Bureau of Reclamation -Spring Creek water quality rpt w/TL to R Sugarek fr C Sarsfield57201
10/13/1994Steve Atkinson / Baker & McKenzie (Attorneys)Joseph Kelly / Stauffer Management CoLtr: Stauffer implementation of response action without approval of IMMI62472
10/14/1994Morrison Knudsen Corp -Bid form - base bid schedule for Slickrock clean water diversion (box 5)63190
10/14/1994Morrison Knudsen Corp -Sludge pond options - order-of-magnitude estimate (box 2 set 2)63191
10/18/1994Ken Iceman / C H 2 M Hill, Inc -Calculations re superelevation of roadway/channel berm, w/TL header to F Woo fr K Iceman 10/17/94 (box 2 set 2)58126
10/19/1994Morrison Knudsen Corp -Handwritten notes: Contractors, water division curb, 9/29/94-10/19/94 (box 5)58120
10/19/1994Morrison Knudsen Corp -Drawing: Typical cross-section, Slick Rock Creek clean water diversion, w/TL to A Christiansen fr A Connell 10/25/94 (box 2 set 2)63195
10/20/1994Lloyd Freese / Stauffer Management CoAnne Connell / Morrison Knudsen CorpROC: Morrison Knudsen (MK) to set up new task called baseflow 2 (box 9)63192
10/20/1994Morrison Knudsen CorpStauffer Management CoScope of work for Slick Rock Creek base flow 2 (draft), w/marginalia (box 9)63193
10/21/1994Charles Alpers / US Geological SurveyRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Preliminary volume estimates completed for fine-grained bottom sediment in Keswick Reservoir w/attchs62930
10/21/1994Morrison Knudsen Corp -Abstract of proposals - Richmond Tunnel maintenance base bid (box 10)63217
10/21/1994Ken Iceman / C H 2 M Hill, IncRichard Sugarek / Environmental Protection Agency - Region 9Memo: Review comments on Stauffer (SMC) submittal pre-final design for Slickrock Creek clean water diversions62937
10/24/1994Lloyd Freese / Stauffer Management CoRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Time critical response action request62939
10/25/1994Jorge Torrico / Morrison Knudsen Corp -Slickrock base flow collection pumping system rpt (box 9)58127
10/27/1994C H 2 M Hill, Inc -Pre-final design for Slickrock Creek baseflow collection & pumping & prefinal design for SRC clean water diversions, w/TL to L Erickson fr R Sugarek62936
10/28/1994Morrison Knudsen CorpStauffer Management CoOversize drawings: Slick Rock Creek diversion - construction drawings (7) w/list of 14 drawings (mapcase)57182
10/28/1994Morrison Knudsen CorpStauffer Management CoOversize drawings: Slickrock Creek clean water diversion - construction drawings (14), w/notes57519
10/28/1994Morrison Knudsen CorpStauffer Management CoOversize drawings: Slickrock Creek clean water diversion - revised construction drawings (8), w/notes (box 10)57669
11/1/1994 - -IMM proposed sampling program57279
11/2/1994Richard Sugarek / Environmental Protection Agency - Region 9Frank Peter / Stauffer Management CoLtr: EPA authorizes implementation of 3 proposed actions62938
11/4/1994Edwin Liu / Environmental Protection Agency - Region 9Winona Victery / Environmental Protection Agency - Region 9Memo: Peer review62577
11/7/1994Richard Sugarek / Environmental Protection Agency - Region 9Lee Erickson / Zeneca IncLtr: Formal approval of Stauffer (SMC) design for Slickrock Creek clean water diversion project62940
11/8/1994Robert Trauger / Colloid Environmental Technologies CoLloyd Freese / Zeneca IncLtr: Bentomat CR compatibility testing proposal - Iron Mountain Lagoon lining project, w/TL to R Sugarek fr Lloyd Freese62473
11/9/1994John Spitzley / C H 2 M Hill, IncFrank Peter / Stauffer Management CoLtr: Transmits information re sediments in Keswick Reservoir w/o encls60548
11/10/1994Joseph Kelly / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9Ltr: Request that EPA invite CRWQCB representative to 11/15 mtg w/TL62474
11/10/1994John Spitzley / C H 2 M Hill, IncRichard Sugarek / Environmental Protection Agency - Region 9Memo: Review comments re proposed GLC testing plan submitted by Stauffer 11/8/9462475
11/14/1994C H 2 M Hill, Inc -Calculations of Slickrock Creek runoff from contaminated area62594
11/16/1994Henry Steinberg / Henry M Steinberg (Chemist, Attorney)Richard Sugarek / Environmental Protection Agency - Region 9Ltr: Removal of dissolved metals by electrolysis62310
11/17/1994John Spitzley / C H 2 M Hill, Inc
Ken Iceman / C H 2 M Hill, Inc
Richard Sugarek / Environmental Protection Agency - Region 9Memo: Spring Creek Debris Dam sizing case studies 17/17B & 18/18B56089
11/17/1994Stauffer Management Co -Analytical results of Iron Mountain AMD neutralization treatment system for 10/94, w/TL to J Pedri fr J Coglaiti62575
11/21/1994Richard Sugarek / Environmental Protection Agency - Region 9Paul Fujitani / US Dept of the Interior - Bureau of ReclamationROC: 1994 SCDD operations60547
11/21/1994Dorothy Patton / Environmental Protection Agency - Washington, D C-- Coordinators / Environmental Protection Agency - Washington, D CMemo: Peer review workshop & clinic w/agenda for 1/10/95-1/11/9562576
11/23/1994Dale Vargas / Sacramento Bee -Newsclip: Fine for Southern Pacific62315
11/25/1994Gail Dethloff / Univ of California, DavisRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Discusses research & transmits copy of proposal for study of sublethal effects of heavy metal contamination on immune system of rainbow trout57203
11/28/1994James Pedri / CA Regional Water Quality Control Board - Central Valley RegionLee Erickson / Zeneca IncLtr: Stauffer use of magnesium oxide for treatment at IMM62476
12/1/1994Roy F Weston, IncStauffer Management CoProcess performance optimization plan for IMM permanent AMD treatment plant55782
12/1/1994C H 2 M Hill, Inc -High density sludge treatment plant & AMD storage facility (design drawings)56081
12/1/1994 - -Final basis of design report - high density sludge treatment plant & AMD storage facilities56502
12/1/1994C H 2 M Hill, IncEnvironmental Protection Agency - Region 9Bidding requirements, subcontract forms, general conditions, v1 of 4 for construction of high density sludge treatment plant & AMD storage facility56503
12/1/1994C H 2 M Hill, IncEnvironmental Protection Agency - Region 9Specifications, v2 of 4 for construction of high density sludge treatment plant & AMD storage facility (final)56504
12/1/1994C H 2 M Hill, IncEnvironmental Protection Agency - Region 9Design criteria rpt, v4 of 4 for construction of high density sludge treatment plant & AMD storage facility56505
12/1/1994C H 2 M Hill, IncEnvironmental Protection Agency - Region 9Final performance standards verification plan high density sludge treatment plant56506
12/1/1994US Dept of the Interior -Excerpt: Operation of lime magnesium carbonate plant & article that describes methods for estimating pre-mining conditions in mineralized area w/TL56527
12/1/1994Daniel Taylor / Bat Conservation International
Merlin Tuttle / Bat Conservation International
-Article: Bats & mines (Bat conservation international, Inc, resource publiction #3)57817
12/1/1994Valerie Conner / CA Regional Water Quality Control Board - Central Valley Region
Linda Deanovic / Univ of California, Davis
Emilie Reyes / CA Regional Water Quality Control Board - Central Valley Region
-Basin plan metal implementation plan development project - Bioassay results, 91-92 final rpt (draft)58024
12/1/1994Lee Erickson / Zeneca Inc -Quality assurance project plan (QAPP) - assessment of water quality parameters at site57233
12/2/1994Jim Ragon / Stauffer Management Co -Tabulation of quotations - Brick Flat Pit, Slickrock Creek & Richmond tunnel, 9/27/94-12/2/94 (box 10)58143
12/2/1994Morrison Knudsen Corp -Abstract of proposals - Brick Flat Pit surface water diversion base bid schedule (box 10)63846
12/5/1994Richard Sugarek / Environmental Protection Agency - Region 9Lloyd Freese / Stauffer Management CoROC: Remedial actions at site60546
12/5/1994Paul Ekoniak / Zeneca IncLee Erickson / Zeneca IncTL: Sampling summary results 5/94-11/94 (flow & metals loading data)62477
12/5/1994Alfred Christiansen / Zeneca IncAnne Connell / Morrison Knudsen CorpMemo: Transmits information drawings of mountain & operations, w/o maps 1 & 3-5, w/maps 2 & 6 (box 4)63196
12/5/1994John Spitzley / C H 2 M Hill, IncFrank Peter / Zeneca Inc
Richard Sugarek / Environmental Protection Agency - Region 9
Memo: Transmits data showing Boulder Creek copper concentrations vs flow & spreadsheet showing metal concentrations fr various locations, w/encls62574
12/6/1994John Spitzley / C H 2 M Hill, Inc
Jim Stefanoff / C H 2 M Hill, Inc
Richard Sugarek / Environmental Protection Agency - Region 9Memo: Solids formed & thickener size for Old/#8 Seep & Slickrock Creek AMD62820
12/7/1994Lee Erickson / Zeneca IncRichard Sugarek / Environmental Protection Agency - Region 9TL: Metal loading study summary rpt collected 5/1/94-10/31/94 & sampling program quality assurance plan for 94-95 season62478
12/7/1994Gene Crippa / Western EcoloRichard Sugarek / Environmental Protection Agency - Region 9Memo: Comments on dam enlargement - followup to discussion at Redding mtg, w/Howard Worne resume62934
12/7/1994Kirk Nordstrom / US Geological SurveyRichard Sugarek / Environmental Protection Agency - Region 9Memo: Pre-mining water quality estimates re IMM62573
12/9/1994Paul Ziemkiewicz / West Virginia Univ
Ray Lovett / NONE
Jeff Skousen / NONE
-Article: Open limestone channels for treating acid mine drainage: a new look at an old idea (Green lands, Fall 94, 36-41)57197
12/9/1994Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9Ltr: Requests information on background levels of metals in streams on site60543
12/11/1994Denis Cuff / San Ramon Valley Times -Newsclip: U S EPA makes next move in long struggle to control water60556
12/11/1994Dave Thom / San Ramon Valley Times -Newsclip: Crucial announcements on Delta fish Thursday60583
12/12/1994Anne Connell / Morrison Knudsen CorpLloyd Freese / Stauffer Management CoMemo: Capacity of pipelines, w/calculations by F Woo 12/9/94 (box 2 set 2, box 7)63198
12/14/1994Karl Longley / CA Regional Water Quality Control Board - Central Valley Region -Memo: Public workshop on abandoned mine drainage w/agenda, issue paper & map62108
12/15/1994 - -Principles for agreement on Bay-Delta standards between state of CA & federal govt57234
12/16/1994Zeneca Inc -Flow & metals loading data for 11/94 fr Boulder Creek, Slick Rock Creek & Spring Creek57188
12/16/1994US Dept of the Interior - Bureau of Reclamation -Spring Creek water quality rpt w/TL to list fr John Martin57204
12/16/1994Leslie Scism / Wall Street Journal, The -Newsclip: Tanker owners rush to insure for oil spills60584
12/20/1994Jim Stefanoff / C H 2 M Hill, IncRichard Sugarek / Environmental Protection Agency - Region 9TL: Final RD submittal docs62311
12/20/1994Lee Erickson / Stauffer Management CoKatherine Mrowka / CA Water Resources Control BoardLtr: Request that Regional Bd consider Stauffer concerns prior to issuance of proposed permit to treat AMD at IMM62110
12/21/1994Vernon Persson / CA Dept of Water Resources - Div of Safety of DamsBrian Stiller / Stauffer Management CoLtr: Brick Flat Pit containment dam inspection w/o certificate of approval & emergency procedures notice for dam60544
12/21/1994Duncan Austin / CA Environmental Protection Agency - Dept of Toxic Substances ControlRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Progress of RA activities, discussion of HDS treatment system60545
12/22/1994Denny Walsh / Sacramento Bee -Newsclip: Claims in Dunsmuir train spill dismissed62313
12/22/1994Nancy Vogel / Sacramento Bee -Newsclip: Water-project ruling called a victory for fisheries60582
1/1/1995Zeneca Inc -IMM summary rpt - stream monitoring program rainfall & metals loading data, Jan 199555977
1/1/1995CA Dept of Fish & Game -Draft test results fr sediment toxicity testing of Spring Creek & Keswick Reservoir Sediments56109
1/1/1995Stauffer Management Co -IMM summary rpt stream monitoring program rainfall & metals loading data, Jan 1995, w/o 2 computer disks56325
1/1/1995Thomas Hesemann / Rocky Mountain Consultants, Inc -Resume of Thomas Hesemann w/TL to R Sugarek fr T Hesemann 8/8/95 (Privileged, FOIA ex 6)57380
1/1/1995Richard Sugarek / Environmental Protection Agency - Region 9 -Storm data analysis 1994-95 (Sacramento River data)57400
1/1/1995C H 2 M Hill, Inc -Water year comparisons57401
1/1/1995Richard Sugarek / Environmental Protection Agency - Region 9 -EPA analysis of Stauffer data - Jan 95 site data quality57404
1/1/1995C H 2 M Hill, Inc -EPA analysis - 1995 Boulder Creek site data57405
1/1/1995Richard Sugarek / Environmental Protection Agency - Region 9 -Simple modeling analysis57406
1/1/1995Richard Sugarek / Environmental Protection Agency - Region 9 -New spread sheet - Boulder Creek RA57407
1/1/1995Richard Sugarek / Environmental Protection Agency - Region 9 -1995 Sacramento River data (1995 precipitation calculations)57411
1/1/1995Richard Sugarek / Environmental Protection Agency - Region 9
C H 2 M Hill, Inc
-Precipitation model57414
1/1/1995US Dept of the Interior - Bureau of Reclamation -Sampling data - total Cu & Zn concentrations expressed in MG/1, 1994-9562927
1/1/1995C H 2 M Hill, Inc -Comparison of Jan 95 to other storm yrs62928
1/1/1995Environmental Protection Agency - Region 9 -(Redacted, FOIA ex 5) Site management plan57221
1/1/1995Robert Dewey / US Dept of the Interior - Bureau of Reclamation -SCDD service agreement57235
1/1/1995Samual Luoma / US Geological Survey -Article: Prediction of metal toxicity in nature fr bioassays - limitations & research needs57853
1/1/1995Kirk Nordstrom / US Geological Survey -Article: RIs, decisions & geochemical consequences at IMM (Proceedings of Sudbury 95 - Mining & Environment, 5/28-6/1/95, 633-42)58096
1/1/1995Carol Thompson / S H N Consulting Engineers & Geologists -Article: IMM - Superfund cleanup site (Science & nature, fall/winter, 1995, 4-6)62759
1/1/1995Morrison Knudsen Corp -Handwritten notes: AMD pipeline extension calculations (box 7)63871
1/1/1995Stauffer Management Co -IMM summary rpt stream monitoring program rainfall & metals loading data, Jan 1995 (disks only)90556
1/3/1995US Dept of the Interior - Bureau of Reclamation -Spring Creek water quality rpt w/TL to list fr J Martin57192
1/3/1995Jim Ragon / Stauffer Management CoAnne Connell / Morrison Knudsen CorpMemo: Transmits Slick Rock Creek test core drilling bid docs, w/attchs (box 2 set 2)58128
1/5/1995Paul Ekoniak / Stauffer Management CoRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Requests approval for use of Rhodamine dye tracer technique to measure creek water flow thru weir systems, w/App I54468
1/5/1995Anette Rardin, Resident / City of ReddingRichard Sugarek / Environmental Protection Agency - Region 9ROC: Storm damage60542
1/9/1995McKenna / City of ReddingRichard Sugarek / Environmental Protection Agency - Region 9ROC: Storm damage60541
1/9/1995Mike Sukop / C H 2 M Hill, Inc
John Dickey / C H 2 M Hill, Inc
John Spitzley / C H 2 M Hill, IncMemo: Preliminary SOW for Spring Creek Reservoir sediment studies62879
1/10/1995US Fish & Wildlife Service -Water quality data - Jan 95 w/TL to R Sugarek & J Spitzley fr D Welsh (94-95 spill data)57397
1/10/1995C H 2 M Hill, Inc
Basic Laboratory
CA Regional Water Quality Control Board
-Stauffer storm data (offsite)57432
1/10/1995Michael Hingerty / Environmental Protection Agency - Region 9Joseph Kelly / Stauffer Management CoLtr: Response to 12/27/95 ltr re 104(e) request for information62880
1/11/1995Stauffer Management Co -Supplemental rpts as part of Rhone-Poulenc response to water management FS study, for inclusion in public record, v3757353
1/11/1995Morrison Knudsen Corp -Draft 1995 design/construction schedule (box 2 set 2)63199
1/12/1995C H 2 M Hill, Inc -Water quality sampling results w/TL to F Peter fr J Spitzley 2/22/95 (94-95 spill data)57425
1/12/1995C H 2 M Hill, Inc -Water quality test results w/TL to L Erickson fr J Spitzley 1/20/95 (94-95 spill data)57426
1/12/1995Brian Spiller / Stauffer Management CoRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Permission given to EPA to announce discussions with Stauffer re selection of remedy action at Iron Mountain62479
1/12/1995Brian Spiller / Stauffer Management CoRichard Sugarek / Environmental Protection Agency - Region 9Ltr: EPA may publicly announce that EPA & Stauffer are engaged in technical discussions re selection of alternative RA at site62109
1/12/1995Quality Analytical Laboratories, Inc -Analytical data w/TL to R Sugarek fr J Spitzley62572
1/13/1995North Coast Laboratories, Ltd -Regional Bd samples w/TL to R Sugarek fr D Heiman (94-95 spill data)57427
1/13/1995Morrison Knudsen CorpStauffer Management CoPreliminary design - AMD storage, per AO 93-01, w/o attchs (box 2 set 2)58129
1/15/1995Brian Finlayson / CA Dept of Fish & GameHarry Rectenwald / CA Dept of Fish & GameMemo: Aquatic toxicology lab rpt w/tables62662
1/18/1995Zeneca IncEnvironmental Protection Agency - Region 9Flow & metals loading data for 12/94 fr Boulder Creek, Slick Rock Creek & Spring Creek w/TL to R Sugarek fr L Erickson56507
1/18/1995Ron Metheny / Stauffer Management CoGreg Richardson / Morrison Knudsen CorpROC: Limit of rock excavation for Slickrock AMD pipeline extension (box 2 set 2)63200
1/19/1995John Spitzley / C H 2 M Hill, Inc
Ken Iceman / NONE
Richard Sugarek / Environmental Protection Agency - Region 9Memo: Spring Creek Debris Dam revisions to case studies 15-1956508
1/20/1995John Spitzley / C H 2 M Hill, IncLee Erickson / Stauffer Management Co
Frank Peter / Stauffer Management Co
Memo: Transmits water quality test results (samples collected above Spring Creek reservoir) w/encl56084
1/20/1995US Dept of the Interior - Bureau of Reclamation -Preliminary results re Keswick water quality w/TL to R Sugarek fr P Fujitani (94-95 spill data)57420
1/20/1995US Dept of the Interior - Bureau of Reclamation -Computation sheets re storm damage w/TL to R Sugarek fr R Klepp 1/23/9557236
1/23/1995Morrison Knudsen Corp -Precipitation charts57323
1/23/1995Charles Alpers / US Geological SurveyRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Transmits draft Keswick reservoir studies by USGS & cooperating agencies, FY95 w/encls57394
1/23/1995C H 2 M Hill, Inc -Shasta & SCDD inflows Jan 95 storm w/TL to R Sugarek fr J Spitzley (94-95 spill data)57421
1/25/1995Greg Richardson / Morrison Knudsen Corp -Hydraulic design calculations - Slickrock Creek AMD pipeline extension, w/excerpts fr Driscopipe & APCO catalogs & Handbook of Hydraulics (box 7)58130
1/25/1995Robert Dewey / US Dept of the Interior - Bureau of Reclamation -Bureau of Reclamation work planning schedule62571
1/26/1995US Dept of the Interior - Bureau of Reclamation -Mtg materials for area source reduction in Slickrock & Boulder basins re SCDD sizing project56106
1/26/1995Bill Walker / Shasta County - Dept of Resource ManagementT W Arman / Iron Mountain Mines, IncLtr: Is ore removal activity subject to requirements for reclamation plan under Surface Mining & Relclamation Act (SMARA)?62482
1/26/1995Patricia Jacobus / Sacramento Bee -Newsclips: Growth plans hinge on Travis60569
1/26/1995Doug Conner / Los Angeles Times (Newspaper) -Newsclip: U S proposes hydropower changes to save salmon60585
1/27/1995Zeneca IncEnvironmental Protection Agency - Region 9Flow & metals loading data & rainfall summary for 1-7/95 fr Boulder Creek, Slick Rock Creek & Spring Creek w/TL to R Sugarek fr L Erickson w/o disk56509
1/30/1995Morrison Knudsen CorpStauffer Management CoOversize drawings: Old #8 acid mine drainage (AMD) pipeline - revised construction drawings (26), re order 94-12 (box 10)58227
1/30/1995Robert McCandless / Canada - Environment CanadaFraser Felter / Environmental Protection Agency - Region 9Memo: Discussion of site visit w/marginalia & background info on Britannia Mine site62483
2/1/1995Stauffer Management Co -IMM summary rpt stream monitoring program rainfall & metals loading data, Feb 199556120
2/1/1995Brian Finlayson / CA Dept of Fish & Game
Charlie Huang / NONE
Robert Fujimura / CA Dept of Fish & Game
-Chemical & toxicological characterization of Keswick reservoir sediments w/TL fr Brian Finlayson 2/10/9556529
2/1/1995Greg Richardson / Morrison Knudsen Corp -Hydraulic design calculations - Slickrock Creek AMD pipeline extension, w/excerpts fr Driscopipe & APCO catalogs (box 7)58039
2/1/1995Robert McCandless / Canada - Environment CanadaFrank Peter / Zeneca IncLtr: Site visit delayed until mid-March62484
2/1/1995US Dept of the Interior - Bureau of Reclamation -Summary cost estimates for TSC on Spring Creek Dam & IMM work scenarios (with dam raise & without dam raise) w/TL to R Sugarek fr B Dewey62570
2/2/1995Anne Connell / Morrison Knudsen CorpLloyd Freese / Zeneca IncLtr: Transmits AMD pipeline extension summary, flow capacity calculations, hydraulic design calculations & cost estimate, w/attchs (box 2 set 2)58037
2/2/1995Morrison Knudsen Corp -Slickrock Creek - acid mine drainage (AMD) pipeline extension summary, w/attchs (box 2 set 2)63201
2/3/1995Jim Sefanoff / C H 2 M Hill, IncRichard Sugarek / Environmental Protection Agency - Region 9Memo: Polymer use in sludge beds by Stauffer62485
2/7/1995Dennis Heiman / CA Regional Water Quality Control Board - Central Valley RegionRichard Sugarek / Environmental Protection Agency - Region 9Memo: IMM samples62925
2/7/1995Fraser Felter / Environmental Protection Agency - Region 9Dianna Weaver / Shasta Natural Science AssnTL: TAG handboooks63551
2/8/1995John Trojanowski / US Dept of the Interior - Bureau of Reclamation
Curtis Cain / US Dept of the Interior - Bureau of Reclamation
Robert Dewey / US Dept of the Interior - Bureau of Reclamation
Krista Doebbler / US Dept of the Interior - Bureau of ReclamationTraval rpt re EPA alternative #2 - design & construction of Slickrock Creek dam & no enlargement of SCDD w/attchs 1 & 256087
2/8/1995John Spitzley / C H 2 M Hill, IncNancy Parker / US Dept of the Interior - Bureau of ReclamationTL: May water quality model & Focused FS rpt for mitigation of AMD62486
2/8/1995John Spitzley / C H 2 M Hill, IncTom Morstein-Marx / US Dept of the Interior - Bureau of ReclamationTL: May 94 water quality model62562
2/8/1995Frank Peter / Zeneca IncRichard Sugarek / Environmental Protection Agency - Region 9TL: 4 privileged documents re treatability & other analytical info in support of proposed global settlement62569
2/9/1995Larry Hall / Zeneca Inc -Definition of metal source areas within Slickrock Creek basin - results of sampling program w/TL to R Sugarek fr F Peter56088
2/9/1995Morrison Knudsen Corp -Preliminary design AMD storage re AO 93-01 w/TL to R Sugarek fr L Freese 2/9/95 w/attchs57289
2/9/1995John Spitzley / C H 2 M Hill, Inc
Ken Iceman / C H 2 M Hill, Inc
Richard Sugarek / Environmental Protection Agency - Region 9
Robert Dewey / US Dept of the Interior - Bureau of Reclamation
Memo: SCDD sizing - outlet discharge distribution & transmits flow-duration curves for daily outlet discharges, w/encl62568
2/9/1995Dallas Linford / US Dept of the Interior - Bureau of Reclamation -Ltr: Interagency agreement - IMM & SCDD raise62612
2/9/1995Anette Rardin, Resident / City of ReddingLee Erickson / Zeneca IncLtr: Water supply to 12640 & 12642 Iron Mountain Rd, Shasta County, CA w/post-it note to R Sugarek fr A Rardin62621
2/9/1995Morrison Knudsen Corp -Oversize maps: Slickrock Creek basin base map, drainage areas, & copper & zinc concentration in runoff (box 5)63836
2/10/1995Stauffer Management Co -Specifications for high density sludge (HDS) treatment facilities, w/TL to R Sugarek fr L Freese 2/14/97 (box 4)58131
2/12/1995Stauffer Management Co -Tables 2-1, 2-2, 2-3, 2-5 & 2-6 fr specifications for high density sludge (HDS) treatment facilities, w/marginalia (box 2 set 2)63832
2/13/1995John Spitzley / NONE
John Livingston / NONE
Larry Well / C H 2 M Hill, Inc
Richard Sugarek / Environmental Protection Agency - Region 9Memo: Sludge drying bed performance57237
2/14/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9Ltr: Response to 104(e) ltr of request for information, w/TL & encls62908
2/14/1995John Duffy / Zeneca Inc -Ltr: Invitation to bid - high density sludge (HDS) treatment facility, w/o attchs A & C-H, w/attch B & special instructions (box 4)58132
2/15/1995Walter Heckathorn / US Fish & Wildlife ServiceNatural Resource TrusteesLtr: Conference call information62489
2/15/1995Morrison Knudsen CorpStauffer Management CoPreliminary design - Slickrock Creek AMD pipeline extension (box 2 set 2)58133
2/21/1995Shepherd Miller, Inc -Mini-piezometer workplan (attch 2)55554
2/21/1995Frank Peter / Zeneca Inc -Comments on preliminary design for Slickrock Creek AMD pipeline extension, w/handwritten note & TL to A Connell fr F Peter 3/13/95 (box 2 set 2)58135
2/21/1995Alfred Christiansen / Zeneca Inc
C Hanby / Zeneca Inc
Lloyd Freese / Zeneca IncMemo: Comments on AMD pipeline extension preliminary design summary, w/TL to A Connell fr A Christiansen (box 2 set 2)63202
2/21/1995Frank Peter / Zeneca IncDuncan Austin / CA Environmental Protection Agency - Dept of Toxic Substances ControlLtr: Transmits SOW outline re Boulder Creek source identification program w/TL62567
2/22/1995US Dept of the Interior - Bureau of Reclamation -Travel rpt w/TL to R Sugarek fr C Cain57239
2/23/1995Dick Coon / C H 2 M Hill, Inc
John Spitzley / C H 2 M Hill, Inc
Richard Sugarek / Environmental Protection Agency - Region 9Memo: Inspection of Richmond audit 2/17/9562566
2/24/1995John Spitzley / C H 2 M Hill, IncRichard Sugarek / Environmental Protection Agency - Region 9Memo: Scope & cost for providing aerial photography, digital mapping & field surveys for site, w/TL62488
2/27/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9Ltr: Response to 1/30/96 request for sampling information62909
2/27/1995Al Meyerhoff / Natural Resources Defense CouncilMichael Hingerty / Environmental Protection Agency - Region 9Ltr: Request copy of complaint in IMM litigation62487
2/28/1995 - -Slickrock Creek retention pond sizing studies hydrology comments w/TL to R Sugarek fr R Swain62613
3/1/1995US Dept of the Interior - Bureau of Reclamation -Data evaluation - Spring Creek air monitoring program54434
3/1/1995Nancy Parker / US Dept of the Interior - Bureau of ReclamationJohn Spitzley / C H 2 M Hill, IncMemo: Concerns about Spring Creek project in prep for 3/3/95 mtg, w/TL to Sugarek fr Spitzley, list of mtg attendees & series of model run comparisons56105
3/1/1995Stauffer Management Co -IMM summary rpt stream monitoring program rainfall & metals loading data, March 199556869
3/1/1995Roy F Weston, Inc -Flow data analysis - Jan-Mar 9557418
3/1/1995US Dept of the Interior - Bureau of Reclamation -Keswick dredging water sampling results, w/encls & marginalia62881
3/1/1995Greg Richardson / Morrison Knudsen CorpAnne Connell / Morrison Knudsen CorpMemo: Flowrate discrepancy for Boulder Creek pipeline, w/marginalia (box 2 set 2)63203
3/1/1995Anne Connell / Morrison Knudsen CorpGreg Richardson / Morrison Knudsen CorpMemo: Responds to 3/1/95 memo re flowrate discrepancy for Boulder Creek pipeline (box 2 set 2)63204
3/2/1995Lee Erickson / Zeneca IncRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Transmits Boulder Creek tracer program w/encl & TL57240
3/2/1995Stauffer Management Co -Potential waste rock pile disposal & costs, w/TL to A Connell fr A Christiansen (box 6)63205
3/2/1995Morrison Knudsen CorpStauffer Management CoOversize drawings: Waste rock pile plans (2) (box 10)63206
3/3/1995Robert McCandless / Canada - Environment CanadaFrank Peter / Zeneca IncLtr: Site visit62490
3/4/1995Richard Sugarek / Environmental Protection Agency - Region 9 -Mtg notes: Boulder Creek team kickoff mtg 4/19/95 w/agenda & handouts56085
3/6/1995CA Dept of Fish & Game -Public notice: To discuss draft survey of chemical, physical & toxicological properties of metal sludge deposits in Keswick Reservoir below IMM62491
3/6/1995Michael Hingerty / Environmental Protection Agency - Region 9Al Meyerhoff / Natural Resources Defense CouncilLtr: Transmits copy of US complaint in IMM litigation, copy of most recent proposed plan & FS for last proposal, w/o encls62492
3/7/1995Richard Sugarek / Environmental Protection Agency - Region 9Daniel Klepp / US Dept of the Interior - Bureau of ReclamationHandwritten note: Info about 3 IMM administrative orders - 93-01, 94-12, 91-07 & Stauffer independent work62542
3/7/1995Alfred Christiansen / Zeneca Inc
C Hanby / Morrison Knudsen Corp
Lloyd Freese / Zeneca IncMemo: Slickrock clean water diversion surface treatment, w/TL to A Connell fr A Christiansen (box 4)63207
3/8/1995Robert Dewey / US Dept of the Interior - Bureau of ReclamationRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Request to determine environmental consequences of extremely large flows into Keswick Reservoir, w/encl56870
3/8/1995Robert Holquist / Record Searchlight (Newspaper) -Newsclip: Toxic sediments in Keswick Lake worry scientists62527
3/8/1995Morrison Knudsen Corp -Hematite pile stabilization/remediation preliminary FS (draft), w/attchs & TL to L Freese & F Peter fr B Claire & J Kuo 3/10/95 (box 4)58134
3/9/1995John Spitzley / C H 2 M Hill, Inc
Ken Iceman / C H 2 M Hill, Inc
Richard Sugarek / Environmental Protection Agency - Region 9Memo: Spring Creek Debris Dam revisions to case studies 15-1956118
3/10/1995Rocky Mountain Consultants, IncNational Oceanic & Atmospheric AdministrationPhysical restoration analysis, Blackbird mine, Lemhi County, ID, w/o oversize maps & drawings57302
3/10/1995Jim Mavis / C H 2 M Hill, Inc
Jim Stefanoff / C H 2 M Hill, Inc
John Spitzley / NONE
Richard Sugarek / Environmental Protection Agency - Region 9Memo: High density sludge plant bid specifications - draft review comments57242
3/10/1995Richard Sugarek / Environmental Protection Agency - Region 9 -Handwritten notes: Conference call re Keswick reservoir accretion flows62552
3/10/1995Rocky Mountain Consultants, IncNational Oceanic & Atmospheric AdministrationPhysical restoration analysis, Blackbird mine, Lemhi County, ID (Oversize maps & drawings only)97232
3/14/1995James Pedri / CA Regional Water Quality Control Board - Central Valley RegionDennis Heiman / CA Regional Water Quality Control Board - Central Valley RegionMemo: Prelim results of Boulder Creek tracer study w/TL to R Sugarek fr D Heiman 3/20/95 & sampling data54425
3/14/1995Richard Sugarek / Environmental Protection Agency - Region 9 -Mtg notes: High density sludge, w/handout & list of attendees57281
3/14/1995Sally Lehrman / San Francisco Examiner, The (Newspaper) -Newsclip: Fear of flooding when snow melts62528
3/15/1995 - -Memo: IMM project description62493
3/15/1995Torri Minton / San Francisco Chronicle (Newspaper)
Michael McCabe / Environmental Protection Agency
-Article: Upper Sacramento above flood stage62529
3/16/1995Shepherd Miller, IncStauffer Management CoDraft groundwater investigation SOW w/TL to R Sugarek fr L Erickson 3/21/9556104
3/16/1995Basic Laboratory -Storm data fr Stauffer57403
3/16/1995Richard Sugarek / Environmental Protection Agency - Region 9Brian Spiller / Stauffer Management CoLtr: High density sludge (HDS) treatment plant components design & construction62494
3/16/1995Cecily Burt / Oakland Tribune, The (Newspaper) -Article: EBMUD prepared to pay $5 million for mine cleanup62530
3/17/1995Zeneca Inc -Boulder Creek source identification workplan w/TL to R Sugarek fr L Erickson55529
3/17/1995Jim Ragon / Stauffer Management CoAnne Connell / Morrison Knudsen CorpROC: Draft preliminary design package - rd closures during construction of Slickrock AMD pipeline (box 2 set 2)63208
3/20/1995Quality Analytical Laboratories, Inc -Rpt of analytical results w/sample ID cross-reference table & case narrative55500
3/22/1995C H 2 M Hill, IncEnvironmental Protection Agency - Region 9EPA analysis of Jan 95 Sacramento River data57398
3/22/1995Brad Knickerbocker / Christian Science Monitor -Newsclip: New federal plan attempts to solve salmon shortage62531
3/23/1995Richard Sugarek / Environmental Protection Agency - Region 9Paul Fujitani / US Dept of the Interior - Bureau of ReclamationROC: Powerplant issues62882
3/23/1995Richard Sugarek / Environmental Protection Agency - Region 9 -Handwritten notes: Review of M Watts method calculation w/Spring Creek Reservoir storage v outlet capacity graphs62921
3/23/1995Brian Spiller / Stauffer Management CoRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Declines invitation to assume lead role in construction & design of HDS facility at IMM without global settlement62495
3/23/1995Dallas Linford / US Dept of the Interior - Bureau of ReclamationEnvironmental Protection Agency - Region 9Ltr: Transmits descriptions of 30 photos showing various work items performed at IMM w/encl, w/o photos62496
3/24/1995John Spitzley / C H 2 M Hill, IncRichard Sugarek / Environmental Protection Agency - Region 9Memo: Transmits IMM water quality sampling fr Slickrock Creek Basin 3/9/95 w/encl56086
3/24/1995Roger Robb / Bakersfield Californian, The (Newspaper)
Nancy Vogel / NONE
-Newsclips: Ltr to editor re flood control dams & beneficial effects of rains62532
3/27/1995Richard Sugarek / Environmental Protection Agency - Region 9Brian Spiller / Stauffer Management CoLtr: EPA will proceed with construction of HDS treatment system62497
3/28/1995Brian Finlayson / CA Dept of Fish & GameJanet Black / CA Water Resources Control BoardMemo: Responsiveness summaries of 2/24/95 & 3/6/95 mtgs, & written comments received on final rpt on Keswick Reservoir sediments, w/encls57360
3/29/1995Nancy Vogel / Sacramento Bee -Newsclip: Agencies pursuing cleanup - Penn Mine plan calls for US to pay half62533
3/29/1995Los Angeles Times (Newspaper) -Newsclip: America's imperiled fisheries62534
3/30/1995Brian Finlayson / CA Dept of Fish & GameJanet Blake / CA Water Resources Control BoardMemo: Responsiveness summaries of 2/24/95 & 3/6/95 mtgs & written comments received on final rpt re Keswick Reservoir sediments, w/attchs57310
3/30/1995Morrison Knudsen Corp -Photos: 27 4x6 color copies, of site, 6/30/94-3/30/95 (box 8)58040
3/30/1995Ivan Joya / Morrison Knudsen Corp -Calculation for pipeline diameter by ICI formula, w/sizing curve & excerpt fr ICI guide (box 2 set 2)63209
3/31/1995C Hanby / Zeneca Inc
Alfred Christiansen / Zeneca Inc
Lloyd Freese / Zeneca IncMemo: Comments on draft emergency AMD storage pond in lieu of tow storage tanks (box 4)63213
3/31/1995Donald Runnells / NONE -Deposition of Donald Runnells in the case of Beartooth Alliance vs Crown Butte Mines, Inc, w/TL to T Bloomfield fr A Haller 5/28/97, w/o disk58146
3/31/1995US Dept of the Interior - Bureau of ReclamationUS Dept of the Interior - Bureau of ReclamationTechnical memo SCDRN-8150-1 - review of channel lining proposed for Slickrock Creek clean water diversion w/TL to R Sugarek fr B Dewey 4/4/9562615
4/1/1995Pace Engineering -Specifications for Rardin water system w/TL to A & B Rardin fr J Spitzley 10/13/95, w/o oversize drawing56132
4/1/1995US Dept of the Interior - Bureau of Reclamation -Spring Creek debris dam enlargement, technical paragraphs SPECB copy57305
4/1/1995Environmental Protection Agency - Region 9 -(Redacted, FOIA ex 5) Site management plan57222
4/1/1995California Lawyer (Journal) -Article: Salmon have been driven to brink of extinction by entrenched water rights62565
4/1/1995Pace Engineering -Specifications for Rardin water system w/TL to A & B Rardin fr J Spitzley 10/13/95 & drawing (oversize drawing only)88988
4/3/1995Dennis Heiman / CA Regional Water Quality Control Board - Central Valley RegionJames Pedri / CA Regional Water Quality Control Board - Central Valley RegionMemo: Metal concentrations in Sacramento River fish w/encl62498
4/4/1995Richard Sugarek / Environmental Protection Agency - Region 9Frank Peter / Zeneca IncLtr: Peer review mtg 4/19/9562551
4/5/1995John Spitzley / C H 2 M Hill, IncRichard Sugarek / Environmental Protection Agency - Region 9Memo: Trip memo resulting fr tour of site62616
4/11/1995C H 2 M Hill, IncEnvironmental Protection Agency - Region 9Workplan amendment 7 for RD/RA oversight (Privileged, FOIA ex 4 & 5)57933
4/11/1995C H 2 M Hill, IncEnvironmental Protection Agency - Region 9Workplan amendment 7 for RD/RA oversight w/attchs (Privileged, FOIA ex 4)57839
4/12/1995C H 2 M Hill, Inc -Confluence of Slickrock & Spring Creek (at mouth), Table of rainfall, flow, & metal loading 3/1/95-3/31/9554718
4/12/1995Edward Seigmund / Shasta County - Dept of Public WorksRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Discusses steady deterioration of Iron Mountain road & transmits copies of use permits with conditions for road maintenance, w/encls56510
4/12/1995Nancy Parker / US Dept of the Interior - Bureau of Reclamation -Review of IMMWQ model application to Slickrock dam alternative, w/TL to R Sugarek fr K Doebbler57361
4/12/1995Mary MaloneyHuss / Stauffer Management CoJohn Spitzley / Zeneca IncLtr: Addresses of Stauffer nominees to Boulder Creek panel, w/TL62518
4/13/1995Shepherd Miller, IncStauffer Management CoSummary rpt on results of mini-piezometer study of gw along Boulder Creek (without oversize map)56328
4/13/1995Richard Sugarek / Environmental Protection Agency - Region 9Krista Doebbler / US Dept of the Interior - Bureau of ReclamationMemo: Responses to questions re SCDD enlargement specifications & upcoming peer review mtg62499
4/13/1995Shepherd Miller, IncStauffer Management CoSummary rpt on results of mini-piezometer study of gw along Boulder Creek (oversize map only)90959
4/14/1995Richard Sugarek / Environmental Protection Agency - Region 9 -Ltr: Peer review orientation mtg w/attch (guiding principles of peer review)54299
4/14/1995Sacramento Bee -Newsclip: Stink over Penn mine (EBMUD pursued as PRP)62558
4/15/1995Barbara Bycsek / Environmental Protection Agency - Region 9Udai Singh / C H 2 M Hill, IncLtr: Disapproves request to work for another contractor at site - conflict of interest63360
4/16/1995Morrison Knudsen CorpStauffer Chemical CoOversize drawings: Waste rock pile removal/disposal cell expansion - construction drawings (10), pre-final (box 10)58136
4/18/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9Ltr: Stauffer nominees to Boulder Creek panel62480
4/19/1995Richard Sugarek / Environmental Protection Agency - Region 9 -Mtg notes: Peer review w/list of attendees56103
4/19/1995Steve Robertson / US Dept of the Interior - Bureau of ReclamationRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Clarification of 4/4/95 technical memo - SCDD enlargement62617
4/21/1995Stauffer Management Co -Liner plates repair sketch w/TL to R Sugarek fr L Freese 4/26/9562692
4/24/1995R Berry / Zeneca IncLarry Hall / Zeneca IncMemo: List of IMM maps w/TL to J Spitzley fr L Hall 6/2/9562548
4/25/1995M Saiki / National Biological Service - Midwest Science Center Field Research Station -Article: Copper, cadmium & zinc concentrations in aquatic food chains fr upper Sacto River (Archives of Environ Contamination & Toxicology, v29, 484+)63678
5/1/1995James McLaughlin / McLaughlin Water Engineers, Ltd -Article: Demonstration of innovative heavy metals removal process (Environmental progress, v14, #1)56137
5/1/1995Richard Sugarek / Environmental Protection Agency - Region 9 -Handwritten notes: Upper Sacramento copper standards under EPA state-wide promulgation62883
5/1/1995Environmental Protection Agency - Region 9 -Establishment of numeric criteria for priority toxic pollutants & toxicity for state of CA, w/encls (Privileged, FOIA ex 5)57377
5/1/1995CA Regional Water Quality Control Board - Central Valley Region -Briefing paper - Upper Sacramento R metal objectives (Privileged, FOIA ex 5)57378
5/2/1995Lloyd Freese / Stauffer Management CoRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Transmits revised design for Slick Rock water diversions, w/attch57438
5/3/1995Richard Sugarek / Environmental Protection Agency - Region 9 -Ltr: Information & schedule for 2nd peer review mtg62618
5/4/1995Richard Sugarek / Environmental Protection Agency - Region 9 -AMD dilutions analysis62922
5/4/1995Nancy Parker / US Dept of the Interior - Bureau of ReclamationRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Slickrock dam alternative for Spring Creek remediation62619
5/5/1995US Dept of the Interior - Bureau of Reclamation -TL: Bureau of Reclamation safety & health standards (blasting operations)62611
5/8/1995Richard Sugarek / Environmental Protection Agency - Region 9Frank Peter / Stauffer Management CoLtr: Rpt on 1st peer review mtg w/info provided to peer review panel54256
5/8/1995Dick Coon / C H 2 M Hill, IncJohn Spitzley / C H 2 M Hill, IncMemo: review comments on Stauffer submittal - 4/26/95 Richmond mine liner repair62620
5/10/1995John Spitzley / C H 2 M Hill, IncRichard Sugarek / Environmental Protection Agency - Region 9Estimated copper production - Jan & Feb 95 treatment plant operations (Spring Creek reservoir & Boulder Creek)62919
5/11/1995CA Dept of Fish & Game -Sample results - Sacramento River at Keswick, w/TL to R Sugarek fr J Vorpagel (94-95 spill data)57424
5/11/1995Diana Weaver / Shasta Natural Science AssnFraser Felter / Environmental Protection Agency - Region 9Ltr: List of selection team members & transmits breakdown of how businesses scored re TAG-TA proposals w/encls & business card57954
5/11/1995Anne Connell / Morrison Knudsen CorpRobert Claire / Morrison Knudsen CorpMemo: Visit to Happy Camp Mine site to look at Mondutank, w/marginalia (box 8)63339
5/12/1995 - -Supplemental rpts as pt of Rhone-Poulenc response to water management FS, for inclusion in public record, v4, w/o oversize map55962
5/12/1995Stauffer Management CoRhone-Poulenc Basic Chemicals CoSupplemental rpts as pt of Rhone-Poulenc response to water management FS, for inclusion in public record, v355968
5/12/1995Stauffer Chemical CoRhone-Poulenc Basic Chemicals CoSupplemental rpts as pt of Rhone-Poulenc response to water management FS, for inclusion in public record, v255969
5/12/1995Stauffer Chemical CoRhone-Poulenc Basic Chemicals CoSupplemental rpts as pt of Rhone-Poulenc response to water management FS, for inclusion in public record, v155970
5/12/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9Ltr: Transmits v1-4 of EPA water management RI/FS for inclusion in public record, w/o encl62501
5/12/1995CA Regional Water Quality Control Board - Central Valley Region -Northern CA mine summary - information on Shasta Lake mines, w/TL to R Sugarek fr D Heiman57244
5/12/1995Morrison Knudsen Corp -Preliminary design - disposal cell expansion, p 1 (AO 93-01), w/o attchs (box 10)63211
5/12/1995 - -Supplemental rpts as pt of Rhone-Poulenc response to water management FS, for inclusion in public record, v4 (oversize map only)87747
5/14/1995Mey Wong / C H 2 M Hill, IncRichard Sugarek / Environmental Protection Agency - Region 9Memo: Transmits Boulder Creek water quality graphs in support of water management FS, w/encls57362
5/15/1995Joe Coglaiti / Stauffer Management CoJames Pedri / CA Regional Water Quality Control Board - Central Valley RegionLtr: Transmits analytical results of AMD neutralization treatment system for April 95, w/encl62502
5/18/1995Mey Wong / C H 2 M Hill, IncJim Mavis / C H 2 M Hill, IncMemo: Summary of Best fits through Lithium Tracer study data, w/Lithium data 3/12/95 re Boulder Creek water management FS & handwritten data57363
5/18/1995Morrison Knudsen Corp -Mtg notes: 5/18/95 mtg re AMD storage/grit chambers, w/TL to L Freese fr A Connell 6/1/95 (box 4)63212
5/18/1995Morrison Knudsen Corp -Mtg notes: 5/18/95 mtg re AMD storage/grit chambers (draft), w/marginalia (box 8)63834
5/23/1995Fritz Carlson / C H 2 M Hill, IncJohn Livingston / C H 2 M Hill, IncMemo: Potential groundwater sources w/attchs62825
5/24/1995John Livingston / C H 2 M Hill, Inc -Memo: RA alternatives in Boulder Creek, w/encls57364
5/25/1995Lee Erickson / Zeneca IncRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Investigation activities at site62550
5/26/1995Stauffer Chemical CoRhone-Poulenc Basic Chemicals CoSupplemental rpts as part of Rhone-Poulenc response to water management FS, for inclusion in public record, v555959
5/26/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9TL: V5 of EPA water management RI/FS for inclusion in public record62563
5/26/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9TL: Supplemental rpts, v562626
5/30/1995Frank Sweeney / San Jose Mercury News -Newsclip: Saving salmon with sound - noisy hum turns them around62538
5/31/1995US Dept of the Interior - Bureau of Reclamation -Spring Creek water quality data 10/13/94 - 5/31/9557419
5/31/1995Frank Peter / Zeneca IncRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Deliverables schedule for Boulder Creek study information62549
5/31/1995Marcia Howe / Shasta Natural Science AssnEnvironmental Protection Agency - Region 9TAG form63554
6/1/1995Dick Coon / C H 2 M Hill, Inc
John Spitzley / NONE
Richard Sugarek / Environmental Protection Agency - Region 9Memo: Operational review57245
6/1/1995Stauffer Management Co -Analytical results of AMD neutralization treatment system for 6/95 w/TL to J Pedri fr J Coglaiti 7/13/9562631
6/2/1995Stauffer Chemical CoRhone-Poulenc Basic Chemicals CoSupplemental rpts as pt of Rhone-Poulenc response to water management FS, for inclusion in public record, v655961
6/2/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9TL: V6 of EPA water management RI/FS for inclusion in public record62503
6/2/1995Winona Victery / Environmental Protection Agency - Region 9 -Memo: Transmits appendices C & D re peer review workproducts w/attchs62547
6/4/1995Paul McHugh / San Francisco Chronicle (Newspaper) -Newsclip: Plumbing depths (to save Sacramento River decimated salmon population)62504
6/6/1995John Spitzley / C H 2 M Hill, IncRichard Sugarek / Environmental Protection Agency - Region 9Memo: Review comments re Stauffer submittal of plans & specs for Slickrock Creek Clean Water Diversion62546
6/7/1995Stauffer Chemical CoRhone-Poulenc Basic Chemicals CoSupplemental rpts as part of Rhone-Poulenc response to water management FS, for inclusion in public record, v755960
6/7/1995Stauffer Chemical CoRhone-Poulenc Basic Chemicals CoSupplemental rpts as pt of Rhone-Poulenc response to water management FS, for inclusion in public record, v1155963
6/7/1995Stauffer Chemical CoRhone-Poulenc Basic Chemicals CoSupplemental rpts as pt of Rhone-Poulenc response to water management FS, for inclusion in public record, v955965
6/7/1995Stauffer Chemical CoRhone-Poulenc Basic Chemicals CoSupplemental rpts as pt of Rhone-Poulenc response to waste water management FS, for public record, v855966
6/7/1995Stauffer Chemical CoRhone-Poulenc Basic Chemicals CoSupplemental rpts as pt of Rhone-Poulenc response to water management FS, for inclusion in public record, v1055967
6/7/1995C H 2 M Hill, Inc
Richard Sugarek / Environmental Protection Agency - Region 9
-Portal spill contribution to Jan 95 Boulder Creek discharge57428
6/7/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9TL: V7-11 of EPA water management RI/FS for inclusion in public record62505
6/7/1995Frank Peter / Zeneca IncRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Transmittal to John Spitzley of water quality monitoring rpts 1/95-3/9562506
6/7/1995Robert Dewey / US Dept of the Interior - Bureau of ReclamationRichard Sugarek / Environmental Protection Agency - Region 9Memo: work performed by TSC per 1/95 agreement to be revised57748
6/7/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9Ltr: Transmits EPA water management RI/FS for inclusion in public record, w/o encl, w/TL62539
6/7/1995Ron Ott / C H 2 M Hill, IncJohn Spitzley / C H 2 M Hill, IncMemo: IMM Boulder Creek 100 yr peak flow62622
6/8/1995Environmental Protection Agency - Region 9 -EPA rev comments on design for Stauffer Slickrock Creek clean water diversion w/TL & USBR safety & health standards (blasting operations)56102
6/8/1995Richard Sugarek / Environmental Protection Agency - Region 9Frank Peter / Stauffer Management CoLtr: Requests that Stauffer repair Iron Mountain Rd re work performed as respondent to orders 93-01 & 94-1262507
6/9/1995Stauffer Management Co -Boulder Creek metal sources identification, quantification & remedial options phase 1 w/TL fr F Peter 8/24/95 & attchs, w/o slides or oversize parts56079
6/9/1995Heather Jamieson / Queen's UnivRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Request to visit site62714
6/9/1995Stauffer Management Co -Boulder Creek metal sources identification, quantification & remedial options phase 1 w/TL fr F Peter 8/24/95 & attchs, w/o slides (oversize map only)88476
6/9/1995Stauffer Management Co -Boulder Creek metal sources identification, quantification & remedial options phase 1 w/TL fr F Peter 8/24/95 & attchs, w/o slides (oversize drawing only)88477
6/10/1995Stauffer Chemical CoRhone-Poulenc Basic Chemicals CoSupplemental rpts as pt of Rhone-Poulenc response to water management FS, for inclusion in public record, v12, w/o oversize drawings55964
6/10/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9TL: V12 EPA water management RI/FS for inclusion in public record62509
6/10/1995Stauffer Chemical CoRhone-Poulenc Basic Chemicals CoSupplemental rpts as pt of Rhone-Poulenc response to water management FS, for inclusion in public record, v12 (oversize drawings only)87936
6/12/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9Ltr: Concerns about 2nd Boulder Creek peer review mtg & transmits SMC proposed questions for mtg, w/encl62510
6/14/1995Alfred Christiansen / Zeneca Inc -Comments on technical specifications & drawings for waste rock pile removal & disposal, w/TL to A Connell fr A Christiansen (box 10)63214
6/14/1995Mary Huss / Stauffer Management CoRichard Sugarek / Environmental Protection Agency - Region 9TL: EPA water management RI/FS for IMM supplement to AR62298
6/15/1995Michael Hingerty / Environmental Protection Agency - Region 9Mary MaloneyHuss / Stauffer Management CoLtr: Addresses 6/12/95 ltr re peer review, w/TL62511
6/15/1995Joe Coglaiti / Stauffer Management CoJames Pedri / CA Regional Water Quality Control Board - Central Valley RegionLtr: Transmits analytical results of AMD neutralization treatment system for 5/95, w/attch62512
6/15/1995Joe Coglaiti / Stauffer Management CoAlfred Christiansen / Zeneca IncLtr: 1995 sludge haul dates & cost (box 10)63210
6/15/1995Donald Klepp / US Dept of the Interior - Bureau of Reclamation -List of tasks for Stauffer re Slickrock Creek pipeline & diversion dam, Upper Spring Creek drop inlet structure & pipeline w/TL & trans confirmation62623
6/16/1995C H 2 M Hill, Inc -Treatment plant capacity (storm data offsite) w/TL to R Sugarek fr P Lawson 6/16/9557399
6/16/1995Michael Doyle / Sacramento Bee -Newsclips: People with AIDS cautioned on tap water & July CVP survey to decide its sale62535
6/20/1995Stauffer Management Co -Amended version of v10(A) of supplemental rpts on behalf of Rhone-Poulenc, v3 of 356867
6/20/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9TL: Amended version of v10(A) supplemental rpts on behalf of Rhone-Poulenc (water management RI/FS) for inclusion in AR62519
6/20/1995Nancy Vogel / Sacramento Bee -Newsclip: Group seeks to slow CVP transfer62536
6/21/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9Ltr: Sending John Spitzley copy of Stauffer database for Boulder Creek w/TL62513
6/21/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9Ltr: Sending Boulder Creek database to John Spitzley62520
6/21/1995Morrison Knudsen Corp -Oversize drawings: 90 & 450 acre foot dams (box 10)63853
6/22/1995Stauffer Management Co -Supplemental rpts as part of Rhone-Poulenc response to water mgt FS, v1356093
6/22/1995US Dept of the Interior - Bureau of Reclamation -Spring Creek water quality rpt62514
6/22/1995Frank Peter / Zeneca IncRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Temporary repairs on Iron Mountain Rd until AO 93-01 & 94-12 construction complete62515
6/22/1995Frank Peter / Zeneca IncRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Electronic transfer to Basic Laboratories revised March data62516
6/22/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9TL: V13 of EPA water management RI/FS for inclusion in public record62521
6/23/1995Jim Ragon / Stauffer Management CoBob Claire / Morrison Knudsen CorpLtr: Transmits calculation sheet & pricing for 1/2-inch rebar in Slickrock diversion ditch, w/attchs (box 6)63215
6/26/1995Richard Sugarek / Environmental Protection Agency - Region 9Lee Erickson / I C I Americas, IncLtr: Transmits EPA performance review comments re operation of IMM treatment plant RD/RA, during 94-95 wet season per AOs #93-01 & #94-12, w/attch57365
6/30/1995C H 2 M Hill, Inc -IMM copper & zinc water quality data - preliminary database presentation of SMC draft final data for 1/95-3/95, w/TL to R Sugarek fr J Spitzley, w/o 2 disks54671
6/30/1995 - -SOW - Brick flat pit sludge disposal preparations w/TL to R Sugarek fr L Freese 7/12/9557252
6/30/1995C H 2 M Hill, Inc -IMM copper & zinc water quality data - preliminary database presentation of SMC draft final data for 1/95-3/95 - w/TL to R Sugarek fr J Spitzley84049
7/3/1995Morrison Knudsen CorpStauffer Management CoRequest for proposal - waste rock pile removal & disposal cell expansion (partial), w/marginalia (box 10)58137
7/7/1995Mary MaloneyHuss / Stauffer Chemical CoE Seigmund / Shasta County - Dept of Public WorksLtr: Stauffer will reimburse Shasta County for materials to affect temporary repairs to IMM Road62627
7/9/1995Richard Sugarek / Environmental Protection Agency - Region 9 -Memo: Stauffer January 1995 data review (data anomaly)57434
7/9/1995US Geological SurveyEnvironmental Protection Agency - Region 9Draft workplan for USGS technical support, w/TL fr C Alpers to R Sugarek57745
7/10/1995Randall Ranken / Pace EngineeringJames Pedri / CA Regional Water Quality Control Board - Central Valley RegionLtr: Sewage treatment & disposal system at site to be installed by Stauffer w/TL to R Sugarek fr D Heiman 7/12/9562628
7/11/1995John Wood / TETRA Technologies, IncJohn Spitzley / C H 2 M Hill, IncLtr: Patent infringements claimed, w/encls56133
7/11/1995US Dept of the Interior - Bureau of Reclamation -Spring Creek water quality rpt w/TL fr J Martin62629
7/12/1995Ken Hansen / Portland Cement AssnCentennial Engineering, IncROC: CH2M Hill call to brainstorm ways to build Slick Rock Creek & Boulder Creek dams (box 10)63216
7/12/1995Joe Jung / Environmental Protection Agency - Financial Management DivJeffrey Marsala / Environmental Protection Agency - Financial Management Div
Fred Nichols / US Geological Survey
Kirk Nordstrom / US Geological Survey
Memo: Closeout of IAG, w/IAG amendment & attchs A, B, C57749
7/12/1995Lee Erickson / Zeneca IncRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Investigation activities at IMM62624
7/13/1995C H 2 M Hill, Inc -Mouth of Boulder Creek (BCMO) model flow & rainfall data w/o disk (Ron Ott flow analysis)57402
7/13/1995Michael Hingerty / Environmental Protection Agency - Region 9Mary MaloneyHuss / Stauffer Management CoLtr: Stauffer peer review presentation62517
7/13/1995C H 2 M Hill, Inc -Mouth of Boulder Creek (BCMO) model flow & rainfall data (Ron Ott flow analysis) (computer disk only)100058
7/14/1995Larry Well / C H 2 M Hill, Inc -Memo: IMM waste rock area cover system options54678
7/14/1995Richard Sugarek / Environmental Protection Agency - Region 9EIMCO Process Equipment Co
C H 2 M Hill, Inc
ROC: Re-bid issues (Privileged FOIA ex 4)56589
7/14/1995Frank Peter / Zeneca IncRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Scientific review panel dates (peer review)62625
7/14/1995Roger Lindquist / C H 2 M Hill, IncJohn Spitzley / C H 2 M Hill, IncMemo: IMM/Boulder Creek - review of Stauffer Plan 6/9562632
7/17/1995Dan Klepp / US Dept of the Interior - Bureau of ReclamationRichard Sugarek / Environmental Protection Agency - Region 9Memo: Recommends disapproval of raising roadbed re order 93-01 w/specs & drawings for Brick Flat Pit sludge disposal preparations fr Stauffer56113
7/17/1995John Spitzley / C H 2 M Hill, Inc
Larry Well / C H 2 M Hill, Inc
-Memo: Stauffer design review submittal - Construction specs & bid documents, earthworks & lining system at sludge drying bed #362695
7/18/1995Oakland Tribune, The (Newspaper) -Newsclip: Water surges through broken Folsom Dam gate62633
7/18/1995David Ridenour / National Center for Public Policy Research -Newsclip: To save wildlife, scrap endangered species act62634
7/18/1995San Jose Mercury News -Newsclip: Broken dam gate unleashes torrent62635
7/18/1995Los Angeles Times (Newspaper) -Newsclip: Warnings issued after break in Folsom Dam62636
7/18/1995Nancy Vogel / Sacramento Bee -Newsclip: Folsom Dam gate fails62637
7/18/1995Kimberly Moy / Sacramento Bee -Newsclip: Flow poses no flood threat, officials reassure residents62638
7/18/1995Keith Takata / Environmental Protection Agency - Region 9Brian Spiller / Stauffer Management CoLtr: Compliance with order 94-12 re operation & maintenance of treatment plant (concurrence copy)62639
7/18/1995Keith Takata / Environmental Protection Agency - Region 9Brian Spiller / Stauffer Management CoLtr: Order 94-12 requires continuing operation & maintenance of RAs on behalf of Rhone-Poulenc62640
7/18/1995Max Vanzi / Los Angeles Times (Newspaper) -Newsclip: Battle looms over extent of protection for Coho salmon62641
7/18/1995John Spitzley / C H 2 M Hill, IncJeri Simmons / Environmental Protection Agency - Region 9TL: Copy of patent info re application of HDS (high density sludge) technology62717
7/19/1995Michael Hingerty / Environmental Protection Agency - Region 9Mary MaloneyHuss / Stauffer Management CoLtr: Peer review mtg62671
7/19/1995John Spitzley / C H 2 M Hill, Inc
Dick Coon / C H 2 M Hill, Inc
Richard Sugarek / Environmental Protection Agency - Region 9Memo: Review comments - Richmond tunnel lining & piping62694
7/20/1995Nancy Vogel / Sacramento Bee -Newsclip: Maintenance on spillway gates ignored for 7 yrs62644
7/20/1995John Spitzley / C H 2 M Hill, IncLloyd Freese / Stauffer Management CoTL: Draft comments re Stauffer construction specs & bid docs, Richmond tunnel lining & piping & Richmond & Lawson portals AMD conveyance upgrade62645
7/21/1995Joel Medlin / US Fish & Wildlife ServiceRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Review of results of toxicity testing of ambient water samples collected fr Upper Sacramento R 1/13-17/95 storm event62646
7/21/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9Ltr: Peer review mtg62647
7/21/1995Don Mandel / CA Environmental Protection Agency - Dept of Toxic Substances ControlRichard Sugarek / Environmental Protection Agency - Region 9Ltr: List of data to request fr Stauffer62648
7/24/1995Morrison Knudsen Corp -Abstract of proposals - waste rock pile removal & disposal cell expansion alternates (box 10)63218
7/24/1995Morrison Knudsen Corp -Draft order of magnitude cost estimates - waste rock pile removal & disposal cell expansion alternates (box 10)63219
7/24/1995Roy F Weston, Inc -Map: Landslide adjacent to Boulder Creek (figure 1), w/TL to A Connell fr D Berry (box 10)63220
7/24/1995Richard Sugarek / Environmental Protection Agency - Region 9Frank Peter / Stauffer Management CoROC: Peer review62649
7/25/1995Nathan Lau / Environmental Protection Agency - Region 9Brian Spiller / Stauffer Management CoLtr: 104(e) request for information56077
7/25/1995Richard Sugarek / Environmental Protection Agency - Region 9Lee Erickson / Zeneca IncLtr: Transmits review comments on Stauffer designs re orders 93-01 & 94-12, w/encls56095
7/25/1995Environmental Protection Agency - Region 9Brian Spiller / Stauffer Management CoLtr: 104(e) request for information (concurrence copy) w/mail receipt P424 454 73062650
7/26/1995Richard Sugarek / Environmental Protection Agency - Region 9 -IMM info re rescission & list of needed site-specific info62720
7/27/1995Brian Spiller / Stauffer Management CoKeith Takata / Environmental Protection Agency - Region 9Ltr: Stauffer operations on behalf of Rhone-Poulenc at site62651
7/27/1995Penny Howard / US Dept of the Interior - Bureau of ReclamationRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Comments on Results of toxicity testing of ambient water samples62652
7/27/1995Anette Rardin, Resident / City of ReddingRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Requests written comments before water system plan is implemented62680
7/28/1995Shepherd Miller, Inc -Supplemental rpts as pt of Rhone-Poulenc resp to water mgt FS, v1454598
7/28/1995John Spitzley / C H 2 M Hill, Inc -Ltr: IMM peer review mtg (8 ltrs)54679
7/28/1995Larry Hall / Zeneca IncRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Update56114
7/28/1995John Spitzley / C H 2 M Hill, IncRon Ott / C H 2 M Hill, IncMemo: Peer review mtg, 8/10-11/9562681
7/28/1995John Spitzley / C H 2 M Hill, IncJohn Woods / TETRA Technologies, IncLtr: RA high density sludge treatment plant patented technology62711
7/28/1995C H 2 M Hill, Inc -Memo: IMM high density sludge treatment plant - EIMCO initial bid clarifications w/TL to R Sugarek fr L Beaton 7/31/9562718
7/31/1995Richard Sugarek / Environmental Protection Agency - Region 9File / NONEMemo: Comments on Stauffer submittal, v12, tab 4 & App H.2, fr 1994 data56078
7/31/1995Don Mandel / CA Environmental Protection Agency - Dept of Toxic Substances ControlRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Proposed questions for peer review, w/mail receipt P424 454 730 & TL to R Sugarek fr D Mandel62653
7/31/1995Michael Hingerty / Environmental Protection Agency - Region 9Mary MaloneyHuss / Stauffer Management CoLtr: Videotaping of peer review mtg62654
7/31/1995Richard Sugarek / Environmental Protection Agency - Region 9Kent Kitchingman / Environmental Protection Agency - Region 9Memo: IMM end of year funding requirements62712
8/1/1995C Adano / C H 2 M Hill, IncCraig McDonald / EIMCO Process Equipment CoLtr: Post-bid clarifications56557
8/1/1995US Dept of the Interior - Bureau of ReclamationEnvironmental Protection AgencySpring Creek debris dam enlargement draft design summary, v2 w/o oversize drawings57306
8/1/1995US Dept of the Interior - Bureau of ReclamationEnvironmental Protection AgencySpring Creek Debris Dam enlargement draft design summary, v157307
8/1/1995Richard Sugarek / Environmental Protection Agency - Region 9FileDraft memo review of Shepherd Miller rpt on work for Stauffer re metal discharge v flow57393
8/1/1995C H 2 M Hill, IncEnvironmental Protection Agency - Region 9Boulder Creek remedial alternative study, v258048
8/1/1995C H 2 M Hill, IncEnvironmental Protection Agency - Region 9Boulder Creek remedial alternative study, v158049
8/1/1995Richard Sugarek / Environmental Protection Agency - Region 9Frank Peter / Stauffer Management CoLtr: Boulder Creek Area source remediation peer review mtg, w/agenda for 8/10-ll/9562655
8/1/1995US Dept of the Interior - Bureau of ReclamationEnvironmental Protection AgencySpring Creek debris dam enlargement draft design summary, v2 (Oversize drawings only)98084
8/2/1995John Spitzley / C H 2 M Hill, IncRon Ott / C H 2 M Hill, IncMemo: Transmits agenda & other information re upcoming peer review panel mtg on 8/11/95, w/encls57375
8/2/1995John Spitzley / C H 2 M Hill, IncDiane Shaw / Wilke, Fleury, Hoffelt, Gould & Birney (Attorneys)TL: IMM document indexes (library map), US v IMM, Rhone-Poulenc vs State Water Resources Control Bd62884
8/2/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9Ltr: Peer review mtg w/TL to M Hingerty fr M MaloneyHuss62656
8/3/1995Dick Coon / C H 2 M Hill, IncJohn Spitzley / C H 2 M Hill, IncMemo: Comments on Stauffer exploration - flow & water quality monitoring in Boulder Creek, Jan & Mar 9562657
8/3/1995Michael Hingerty / Environmental Protection Agency - Region 9Mary MaloneyHuss / Stauffer Management CoLtr: Peer review mtg & extension to complete supplementation of record re remediation at Boulder Creek62658
8/3/1995Don Mandel / CA Environmental Protection Agency - Dept of Toxic Substances Control -Potential questions for EPA peer review panel - proposed remediation for Boulder Creek watershed area62659
8/3/1995John Spitzley / C H 2 M Hill, IncRichard Sugarek / Environmental Protection Agency - Region 9Richmond Portal - copper to zinc ratio & flow, 12/85-10/9362660
8/7/1995Richard Sugarek / Environmental Protection Agency - Region 9 -Draft questions for peer review panel w/TL to F Peter fr R Sugarek56096
8/7/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9Ltr: Peer review mtg w/TL62661
8/7/1995Jane Little / Sacramento Bee -Newsclip: Past foes team up to save streams62663
8/7/1995Richard Sugarek / Environmental Protection Agency - Region 9Richard McLaughlin / McLaughlin Water Engineers, LtdLtr: Proven low cost heavy metals removal process62721
8/8/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9Ltr: Requests postponement of peer review mtg62664
8/8/1995Michael Hingerty / Environmental Protection Agency - Region 9Mary MaloneyHuss / Stauffer Management CoLtr: Peer review mtg62665
8/9/1995Environmental Protection Agency - Region 9 -Boulder Creek remedial alternatives study peer review workbook, w/TL to Colleagues fr R Sugarek56115
8/9/1995Morrison Knudsen Corp -Order-of-magnitude estimate summary, approximate sludge capacities & drawings for Brick Flat Pit sludge embankment options (box 2 set 2)63221
8/10/1995Cardomon Group, Inc -Videotapes: IMM peer review mtg (tapes 1 & 2 of 4) (video shelf)56129
8/10/1995Cardomon Group, Inc -Videotapes: IMM peer review mtg (tapes 3 & 4 of 4) (video shelf)56130
8/10/1995Stauffer Management Co -Stauffer Management Co presentation to Boulder Creek peer review panel, w/handouts & overheads57366
8/11/1995 - -IMM Boulder Creek remedial alternatives - peer review panel mtg 8/10-8/11/9556110
8/11/1995Cardomon Group, Inc -Videotapes: IMM peer review mtg (tapes 1-3) (video shelf)56128
8/11/1995Joseph Kelly / Stauffer Management CoNathan Lau / Environmental Protection Agency - Region 9Ltr: Response to 104(e) request for information w/TL62666
8/11/1995Richard Sugarek / Environmental Protection Agency - Region 9 -Peer review panel mtg introduction 8/10-11/95 w/marginalia & mtg schedules62667
8/12/1995Richard Sugarek / Environmental Protection Agency - Region 9 -IMM chronology fr 94-present re treatment plant62668
8/14/1995Michael Hingerty / Environmental Protection Agency - Region 9Joseph Kelly / Stauffer Management CoLtr: Response to Stauffer objections to 104(e) request for information62669
8/14/1995Mary MaloneyHuss / Stauffer Management CoMichael Hingerty / Environmental Protection Agency - Region 9TL: 3 copies of videotapes of peer review panel presentation62670
8/15/1995William Crooks / CA Regional Water Quality Control Board - Central Valley RegionJoseph Kelly / Stauffer Management CoLtr: Water quality objectives for Upper Sacramento River62730
8/16/1995 - -Supplemental rpts as part of Rhone-Poulenc response to water mgt FS, v1556074
8/16/1995Nathan Lau / Environmental Protection Agency - Region 9Keith Takata / Environmental Protection Agency - Region 9Decision memo: Recommends approval to amend IAG to increase funding for USGS technical support (concurrence copy), w/o attchs63245
8/16/1995Nathan Lau / Environmental Protection Agency - Region 9Keith Takata / Environmental Protection Agency - Region 9Decision memo: Recommends approval to amend IAG to increase funding for USGS technical support, w/IAG amendment (unsigned), SOW & commitment notice57743
8/17/1995John Spitzley / C H 2 M Hill, IncFrank Peter / Stauffer Management CoTL: Boulder Creek Remedial Alternative Study, v1 & 2 & 2 disks of spreadsheet files of load regression equations used for remedial alternative study62672
8/17/1995 - -Ltr: Transmits analytical results of acid mine drainage (AMD) neutralization treatment system for 6/95, w/attch62728
8/18/1995Richard Sugarek / Environmental Protection Agency - Region 9Mary MaloneyHuss / Stauffer Management CoLtr: Transmits list of members of peer review panel w/attch62674
8/22/1995Richard Sugarek / Environmental Protection Agency - Region 9Don Deere / Rocky Mountain Consultants, IncTL: Videotape of peer review mtg62729
8/24/1995Morrison Knudsen Corp -Revised drawings for Richmond & Lawson portals AMD conveyance upgrade re order 93-01, w/TL to R Sugarek fr L Freese54704
8/24/1995Dan Klepp / US Dept of the Interior - Bureau of Reclamation -Photos: Showing various work items performed at IMM (16) w/TL fr D Linford56116
8/24/1995Morrison Knudsen Corp -Revised drawings for Flat Creek erosion protection re order 93-01, w/TL to R Sugarek fr L Freese57246
8/24/1995Morrison Knudsen Corp -Set of drawings for AMD storage tank (pre-final) re order 93-01, w/TL to R Sugarek fr L Freese57247
8/24/1995Frank Peter / Stauffer Management CoRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Comments on EPA proposed HDS plant62675
8/24/1995Ken Walters / K G Walters Construction Co, IncRichard Sugarek / Environmental Protection Agency - Region 9Ltr: Transmits 2 ltrs addressed to Chris Adamo w/encls62723
8/25/1995Shepherd Miller, Inc -Supplemental rpts as part of Rhone-Poulenc response to water mgt FS, v1656094
8/26/1995Michael Doyle / Fresno Bee, The (Newspaper)
Mark Grossi / NONE
-Newsclip: Farm group eyes CVP - Valley irrigators explore buying water project62537
8/26/1995Nancy Vogel / Sacramento Bee -Newsclip: Chances ebb for CVP deal in 9562677
8/26/1995Stacey Shull / Sacramento Bee -Newsclip: Coho salmon caught in political net62678
9/1/1995Morrison Knudsen Corp -Supplemental rpts as part of Rhone-Poulenc response to water mgt FS, v1756075
9/1/1995Richard Sugarek / Environmental Protection Agency - Region 9 -FY 95 accomplishments & planned FY 96 actions62833
9/5/1995Scott Morrison / C H 2 M Hill, IncRichard Sugarek / Environmental Protection Agency - Region 9Memo: Review comments of Stauffer pre-final construction drawings for Spring Creek diversion outlet erosion protection62733
9/5/1995Ken Iceman / C H 2 M Hill, IncRichard Sugarek / Environmental Protection Agency - Region 9Memo: Review comments on draft construction drawings for Flat Creek temporary erosion protection62734
9/5/1995Tom Hesemann / Rocky Mountain Consultants, IncRichard Sugarek / Environmental Protection Agency - Region 9Memo: Transmits Blackbird mine physical restoration analysis rpt w/o rpt, w/newsclip - Chase gulch dam passes halfway point63681

Top of Page

Jump to main content.