Date Title / pdf File
07/01/97 NEWMARK OU: Remedial Design Documents

Newmark Operable Unit 1 Remedial Design Documents

FINAL 100 PERCENT CONSTRUCTION PLANS AND SPECIFICATIONS
NEWMARK OPERABLE UNIT REMEDIAL DESIGN
(North Plant Pipeline)
FILES
Table of Contents

Final 100 Percent Construction Plans and Specifications NOU RD (North Plant Pipeline)
Table of Contents from Construction Plans and Specifications North Plant Pipeline.pdf

Final 100 Percent Construction Plans and Specification (1).pdfFinal 100 Percent Construction Plans and Specification (2).pdf
FINAL 100 PERCENT PIPELINE DESIGN SUBMITTAL
NEWMARK OPERABLE UNIT REMEDIAL DESIGN
(North Plant)
FILES
Table of Contents

Final 100 Percent Pipeline Design Submittal NOU RD (North Plant)
Table of Contents from Design Submittal North Plant.pdf

Final 100 Percent Pipeline Design Submittal NOU RD- North Plant.pdf
FINAL 100 PERCENT DESIGN SUBMITTAL
NEWMARK OPERABLE UNIT REMEDIAL DESIGN
(North Plant)
FILES
Table of Contents

1.0 Introduction

2.0 LPGAC Component Description - 8.0 Bibliography

Appendix A: Operational Data - Appendix C: Design Calculations/Graphs

Appendix D: LPGAC Vendor Design Information
1
Wheelabrator Westates Information
2
Appendix 1.0: P&ID GAC System Suppliers Scope of Work
Appendix 2.0: Virgin Carbon Fill Specifications 40,000 Pounds
Calgon Carbon Corporation Information

Appendix E: Chlorination System and Flowmeter Design Information

Appendix F: Muscoy Plume Front Extraction Well Technical Memorandum
Table of Contents from Design Submittal North Plant.pdf

sec1.0 pp.1-11.pdf

sec2.0-8.0 pp.12-35.pdf

appA-appC .pdf

appD (1).pdf appD (2) .pdf

appE .pdf

appF .pdf
FINAL 100 PERCENT CONSTRUCTION PLANS AND SPECIFICATIONS
NEWMARK OPERABLE UNIT REMEDIAL DESIGN
(South Plant Pipeline)
FILES
Table of Contents

01001 Specification Structure Work - 01545 Protection of Work and Property

01560 Temporary Controls - 02510 Asphaltic Concrete Paving

02575 Pavement Repair and Resurfacing - 02980 Landscape Restoration

03300 Cast in Place Concrete
Table of Contents from Construction Plans and Specifications South Plant Pipeline.pdf
sec01001-01545 pp.1-40.pdf

sec01560-02510 pp.41-74.pdf

sec02575-02980 pp.75-112.pdf

sec03300 (1).pdf sec03300 (2).pdf sec03300 (3).pdf sec03300 (4).pdf
FINAL 100 PERCENT PIPELINE DESIGN SUBMITTAL
NEWMARK OPERABLE UNIT REMEDIAL DESIGN
(South Plant)
FILES
Table of Contents

1.0 Introduction - 8.0 Bibliography

Appendix A: Final Pipeline Route Study South Plant - Appendix B: Design Calculations
Table of Contents from Pipeline Design Submittal for South Plant.pdf

sec1.0-8.0 pp.1-15.pdf

appA-appB .pdf
FINAL 100 PERCENT DESIGN SUBMITTAL
NEWMARK OPERABLE UNIT REMEDIAL DESIGN
(South Plant)
FILES
Table of Contents

1.0 Introduction

2.0 LPGAC Component Description - 8:0 Bibliography

Appendix A: Operational Data - Appendic C: Design Calculations/Graphs

Appendix D: LPGAC Vendor Design Information
1
Wheelabrator Westates Information
2
Calgon Carbon Corporation Information

Appendix E: Chlorination System and Flowmeter Design Information

Appendix F: Newmark Wellfield Extraction System Technical Memorandum
Table of Contents from Design Submittal South Plant.pdf

sec1.0 pp.1-12.pdf

sec2.0-8.0 pp.13-32.pdf

appA-appC .pdf

appD (1).pdf appD (2) .pdf

appE (1) .pdf appE (2) .pdf

appF .pdf