Date Title / pdf File
04/01/06 MUSCOY OU: Construction Inspection Report for GAC Vessels
MUSCOY OPERABLE UNIT CONSTRUCTION INSPECTION REPORT FOR REMEDIAL ACTION,
GAC VESSELS
FILES
Title Page
GAC Vessels.pdf
Table of Contents
Table of Contents.pdf
Section 1.0 - 2.0:

1.0 Introduction
2.0 Construction Summary
text.pdf
Appendix A: Weekly Construction Summary
Appendix A.pdf
Appendix B: Inspector's Daily Reports

B1 May - June 2004
B2 July 2004
B3 January - June 2005
B1.pdf B2.pdf B3.pdf
Appendix C: Internal and External Vessel Coating Testing Reports

C1 February 13, 2004
C2 May 10, 2004
C3 June 3, 2004
C4 July 19, 2004
C5 August 24, 2004
C1a.pdf C1b.pdf

C2.pdf C3.pdf C4.pdf C5.pdf
Appendix D: Hydrostatic Pressure Testing Report
D1.pdf D2.pdf
Appendix E: Bacteria Testing Report
Appendix E.pdf
Appendix F: Flow Meter Calibration
Appendix F.pdf
Appendix G: Construction Photographs

25-May-04 (Photo No. 01) Looking West: USFW starting to unload and set filter vessels in the approx. location on the East concrete foundation slab in the plant expansion area.
25-May-04 (Photo No. 02) Looking West: USFW continuing to unload and set filter vessels and filter vessel pipe mainifolds from the low boy trailer truck onto the East concrete foundation slab in the plant expansion area.
25-May-04 (Photo No. 03) Looking West: Lifting the filter vessels off the trailer truck with a truck crane and then setting filters into position on the East concrete foundation slab.
25-May-04 (Photo No. 04) Looking West: Continuing to use a truck crane to move the filter vessels from the trailer truck to the foundation slab.

25-May-04 (Photo No. 05) Looking North: Continuing to use the truck crane to place the filter vessels into approx. location on the East concrete foundation slab in the plant expansion area.
27-May-04 (Photo No. 06) Looking North: Installing the filter vessel influent and effluent steel header piping on the East concrete foundation slab in the plant expansion area.
27-May-04 (Photo No. 07) Looking North: Installing the 8-inch steel lateral piping from the filter vessel valve manifold to the header piping on the East side of the filter vessels.
27-May-04 (Photo No. 08) Looking South: Continuing to install the steel lateral piping and installing the backwash header piping on the East side of the filter vessels in the plant expansion area.

22-Jun-04 (Photo No. 09) Looking Southeast: USFW setting the filter vessels on the West concrete foundation slab using a truck crane in the plant expansion area.
22-Jun-04 (Photo No. 10) Looking Southeast: Continuing to unload trailer trucks with a truck crane and placing the filter vessels on the West concrete foundation slab. 22-Jun-04 (Photo No. 11) Looking Southeast: Lifting the filter vessel off of the trailer truck with a truck crane and placing the filter vessels on the concrete foundation slab.
24-Jun-04 (Photo No. 12) Looking South: Continuing to install and bolt up the filter vessel header piping and 8-inch lateral piping from the vessel valve manifolds on the West concrete foundation slab.

28-Jun-04 (Photo No. 13) Looking East: Injecting epoxy in drilled anchor holes for the filter vessel support legs located on the West concrete foundation slab.
28-Jun-04 (Photo No. 14) Looking East: Setting the anchor bolts in the drill holes after the epoxy was injected into the anchor holes on the West concrete foundation slab.
12-Jan-05 (Photo No. 15) Looking Northwest: Installed the granular activated carbon sample ports on the filter vessels in the plant expansion area.
12-Jan-05 (Photo No. 16) Looking North: Chlorination and pressure testing the filter vessels and filter header piping at the plant expansion area.

31-Jan-05 (Photo No. 17) Looking Northwest: Touch up painting on the outside of the filter vessels at the plant expansion area.
Appendix G.pdf
Appendix H: Installation Certification and Final Inspection and Acceptance FormAppendix H.pdf
Appendix I: GAC Vesssel Specifications
Appendix I.pdf
Appendix J: Record Drawings

Site Plan & Section
HP1230 4 Level System General Assemby
Detail Sheet
Water/Carbon Sample Port Detail
SS Sample Basin
SS Sample Basin- Manifold
Appendix J.pdf