Jump to main content or area navigation.

Contact Us

Pacific Southwest, Region 9: Superfund

Serving Arizona, California, Hawaii, Nevada, the Pacific Islands, and Tribal Nations

Newmark Groundwater Contamination

Superfund Site

Technical Document

You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more.

Date Title / pdf File
04/01/05 NEWMARK OU/MUSCOY OU: Monthly Progress Report for April 2005
APRIL 2005 MONTHLY PROGRESS REPORTFILES
Title PageTitle Pages [340KB].pdf
Table of ContentsTable of Contents (100KB).pdf
Section 1.0 - Section 6.0:

1.0 Introduction
2.0 Extraction Well Operations
3.0 Treatment Plant Operations
4.0 Water Level Monitoring
5.0 Monitoring Well Sampling
6.0 Remaining Required Information
1.0 - 6.0 (1.08MB).pdf
Tables

2-1 Summary of Newmark OU O&M - Extraction Wells
2-2 Summary of Extraction Well Flow Data March and April 2005
2-3 Extraction Well Monitoring Results - PCE and TCE March and April 2005
3-1 Summary of Newmark OU O&M - GAC Treatment Plants
3-2 Summary of Treatment System Flow Data and Mass Removal Estimates March and April 2005
3-3 Treatment Plant Monitoring Results - PCE and TCE March and April 2005
4-1 Summary of Newmark OU O&M - Water Level Monitoring
6-1 Schedule of Upcoming O&M and Monitoring Events Planning Period: June/July 2005
6-2 Deliverable Tracking Form
Tables (1) [1.74MB].pdf Tables (2) [1.23MB].pdf Tables (3) [1.24MB].pdfTables (4) [1.08MB].pdf Tables (5) [1.01MB].pdf
Figure

1-1 Interim Remedial Action Facilities Map
Figure (2.63MB).pdf
Appendix A: March 2005 and April 2005 DHS Monthly ReportsAppendix A (1) [1.39MB].pdf Appendix A (2) [1.10MB].pdf Appendix A (3) [1.79MB].pdf

Top of Page

Jump to main content.