Newmark Groundwater Contamination
Superfund Site
Technical Document
You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more.
| Date |
Title / pdf File |
| 07/01/06 |
MUSCOY OU: Installation of Extraction Wells EW-108 through EW-112 and Monitoring Wells MW-135 through MW-140 |
|
|
|
|
|
|
MOU RA, Installation of Extraction Wells EW-108 through
EW-112 & Monitoring Wells MW-135 through MW-140 | FILES |
Title Page
|  |
Table of Contents
|  |
Sections 1.0 - 5.0:
1.0 Introduction
2.0 Well Installation
Map: Figure 2-1 Well Locations
3.0 Groundwater Sampling Analytical Results
Map 1: Figure 3-1 PCE Concentration Isocontours Jan-Feb 2004, 0-500 Feet Below Ground
Map 2: Figure 3-2 PCE Concentration Isocontours Jan-Feb 2004, >500 Feet Below Ground
Map 3: Figure 3-3 PCE Concentration Isocontours Nov 2005, 0-500 Feet Below Ground Surface
Map 4: Figure 3-4 PCE Concentration Isocontours Nov 2005, >500 Feet Below Ground Surface
4.0 Conclusions
5.0 References
| 




 |
Attachment A: Drilling and Well Construction Logs
Log of Extraction Well: EW-108
Log of Extraction Well: Ew-109
Log of Extraction Well: EW 110 & Log of Piezometer Wells: EW-110PZA, PZB, PZC, & PZD
Log of Extraction Well: EW-111
Log of Piezometer Wells: EW-111PZA, PZB, PZC, & PZD
Log of Extraction Well: EW-112
Log of Monitoring Wells: MW-135A, B, C
Log of Monitoring Wells: MW-136A, B, C
Log of Monitoring Wells: MW-137A, B, C
Log of Monitoring Wells: MW-138A, B, C
Log of Monitoring Wells: MW-139A, B, C
Log of Monitoring Wells" MW-140A, B, C
|

 |
Attachment B: Final Well Inspection Forms
|  |
Attachment C: Extraction Well Development Data
|  |
 |  |
Top of Page