Newmark Groundwater Contamination

Superfund Site

Technical Document

You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more.

Date Title / pdf File
11/01/05 MUSCOY OU: Construction Inspection Report for Transmission Pipeline Phase 1 Construction
MUSCOY OPERABLE UNIT CONSTRUCTION INSPECTION REPORT FOR REMEDIAL ACTION,
TRANSMISSION PIPELINE PHASE 1 CONSTRUCTION
FILES
Title Page
Transmission Pipeline Phase 1 Construction.pdf
Table of Contents
Table of Contents.pdf
Section 1.0 - 2.0:

1.0 Introduction
2.0 Construction Summary
text.pdf
Appendix A: Compaction Test Results
Appendix A.pdf
Appendix B: Summaries of URSG Inspector's Daily Reports
Appendix B.pdf
Appendix C: Construction Photos

Tree Removed
Gas Line Repair
Shoring
Temporary Pavement Patch

Waste Line Offset
Well Valving
Blow off Installation
Compaction

USA Locations
Pipe Delivery
Pipe stockpiled in yard
Installing retainer bead

Excavation and Compaction
Traffic Control
Traffic Control
Traffic Control

W. Virginia Pavement Patch
Medical Center Curb and Gutter Repair
Air Release and Blow off Vault
Appendix C.pdf
Appendix D: Record Drawings

6 Plan and Profile, W. Magnolia Ave. - N. Flores St.
7 Plan and Profile, W. Virginia St.
8 Plan and Profile, W. Virginia St.
Appendix D.pdf