Technical Documents | Region 10 | US EPA

Jump to main content.


Technical Documents

Bunker Hill Superfund Site

Bunker Hill Superfund Site Home
Community Resources

Contacts:


The following documents are Executive Summaries. To see the complete reports, please visit the site information repositories (see our Community Resources page for a list of locations):

OU2 Source Areas of Concern Report (PDF) (67 pp. 7.43MB, About PDF) - March 2008
OU2 Phase I Remedial Action Assessment (PDF) (23 pp. 4MB) - October 2007
OU2 Conceptual Site Model (PDF) (14 pp. 2.7MB) - January 2006
OU2 Water Quality Statistical Analysis (PDF) (10 pp. 3MB) - January 2006
OU2 Environmental Monitoring Plan (PDF) (15 pp. 645K) - January 2006

Bunker Hill OU2 Groundwater Long-term Monitoring and Optimization Evaluation (PDF) (124 pp. 4.2MB) - January 2006

2009 OU2 EMP Biological Resources Annual Report (PDF) (14 pp. 211K) - April 2010
2008 OU2 EMP Biological Resources Annual Report (PDF) (67 pp. 5MB) - October 2009
2007 OU2 EMP Biological Resources Annual Report (PDF) (58 pp. 1.4MB) - September 2008
2006 OU2 EMP Biological Resources Annual Report (PDF) (45 pp. 1.2MB) -December 2007

Bunker Hill Facility Non-Poulated Areas Operable Unit 2 Biological Monitoring, 2001-2004 - June 2005
Evaluation of Potential Cancer Risk from Exposure to Gypsum at the A-4 Gypsum Pond from ATSDR - (30 pp. 519K, About PDF) July 6, 2004

Refining Risk Assessment, Relative Bioavailability of Lead in Soil and Dust Evidence from Blood Lead at Bunker Hill for EPA Science Forum 2004 (1 pp. 124K , About PDF)

Abstract 746 - Pediatric Bioavailability of Lead in Soil and Dust (1 pp. 76K, About PDF) March 2004

Bunker Hill House Dust Cleaning Pilot Final Report and Workplan (76 pp. 3.MB, About PDF to start) April 2001

Phase 2 Treatability Report (1 MB , About PDF) November 2000


Publications following the Remediation Effectiveness Symposium in May 2000 Show details for BackgroundBackground


Local Navigation


Jump to main content.