Left Arrow IconPreviousRight Arrow IconNextPlus IconExpandMinus IconCollapseMagnifying Glass IconSearch

Web Attachment Count

TitleViewAttachmentsAttachment NamesAttachment Size (MB)
Adak Naval Air StationDon't put on menu2oua_rod_.pdf
AdakOUB-1ROD.pdf
1.16
3.00
Alaska Battery Enterprises0
Alaska Cleanup Sites0
Alcoa Smelter0
Alder Gold and Copper Mill43AlderBottledWater.PDF
www.methowvalleynews.PDF
aldermillremovalassessmentmemo.PDF
aldermillTable1.PDF
aldermillTable2.PDF
aldermillTable3.PDF
aldermilltables4thru8.PDF
fs map.jpg
Alder_ActMemo.pdf
20020415fs_alder.pdf
map402_3b&w.jpg
aldermillphoto1.jpg
aldermillphoto2.jpg
aldermillphoto3.jpg
aldermillphoto4.jpg
aldermillphoto5.jpg
aldermillphoto6.jpg
ATTZP70J
ATTW6B63
ATTWEFUH
ATTJ6SN8
aldergoldSQAP0502.PDF
aldertables0502.PDF
rev fig 1-3.pdf
ecologyaldermilldata2001.xls
alder photomap2.gif
Arsenic Issue Paper.pdf
20020829_FS_alder.pdf
alder actionmemo.PDF
Alder Integrated Assessment.pdf
Sec_3 Figures.pdf
Figure 7-3.pdf
Figure 7-4.pdf
Photos.pdf
Sec_2 Figures.pdf
Figure 7-1_7-2.pdf
publicmeeting902.PDF
DOH info -Twisp.PDF
20021021_FS_alder.pdf
MillPondPreposition2.JPG
Dumping3.JPG
P1010047.jpg
Alder_FS_20030610.pdf
0.01
0.14
0.10
0.01
0.01
0.01
0.02
0.22
0.02
0.29
0.39
0.01
0.01
0.01
0.01
0.01
0.02
0.36
0.87
1.02
1.67
0.20
0.07
0.36
0.04
0.21
0.45
0.13
0.04
0.90
4.07
2.33
3.20
4.61
1.12
2.72
3.79
0.07
0.15
0.58
0.54
0.20
0.78
Alexander Farms, Benton County, WA3699alex.pdf
999alex.pdf
200alex.PDF
0.11
0.09
0.03
Alley Fuels0
Allied Plating, Inc.2Second Allied Plating five-year review.pdf
Allied-Plating-3rd-FYR.pdf
0.08
0.79
American Crossarm & Conduit Co.2ACC904photo.pdf
ACC2ndfiveyerfinal.pdf
0.99
0.22
Anchorage Terminal Reserve7AnchorageTR FS5-18-04.pdf
ak anchor term 7-15-04.pdf
Anchorage Term CIP 11-9-04.pdf
ak anchor term 8-18-05.pdf
ak-term-res-fs.pdf
Anchorage Terminal Reserve fs .pdf
Anchorage-Terminal-Reserve-FS-7-14-08.pdf
0.10
0.09
0.11
0.12
0.18
0.08
0.09
Anchorage Terminal Reserve Technical Documents52Ship Creek Surface Water and Sediment Assessment Report.pdf
Northern Boundary Assessment Interim Action Work Plan.pdf
Northern Boundary Assessment Report.pdf
RAO Tech Memo FINAL.pdf
RI-FS WP Revision 1 Aug. 15 2005.pdf
Ship Creek Initial Habitat Assessment Interim Action Work Plan.pdf
Ship Creek Literature Review.pdf
Ship Creek Prelim Habitat Survey figures.pdf
Ship Creek Prelim Habitat Survey photos.pdf
Ship Creek Prelim Habitat Survey.pdf
Revised WP Drawing Binder.pdf
Northern Boundary Assessment Interim Action Work Plan figures.pdf
atr_aoc2.pdf
AKRRAOC - June 28 '04.pdf
anchorage AOC june 04.pdf
AOC public comments.pdf
AOC response to comments.pdf
atr_sow.pdf
SOW - final.pdf
SBR Textsm.pdf
Figures 1-4 and 1-5.pdf
Figure 1-2.pdf
Figure 1-3.pdf
Figure 2-1.pdf
Figure 2-2.pdf
Figure 2-3.pdf
Figure 2-4.pdf
Figure 2-5.pdf
Figure 2-6.pdf
Figure 3-1.pdf
Figure 3-10.pdf
Figure 3-11.pdf
Figure 3-12.pdf
Figure 3-13.pdf
Figure 3-2.pdf
Figure 3-3.pdf
Figure 3-4.pdf
Figure 3-5.pdf
Figure 3-6.pdf
Figure 3-7.pdf
Figure 3-8.pdf
Figure 3-9.pdf
Figure 4-1.pdf
Figure 1-1.pdf
Appendices.pdf
Addendium Figures.pdf
ARRC-AOC.pdf
Appendix-B-Attachments.pdf
Appendix-B-HHRA.pdf
Appendix-C-ERA-Full.pdf
Attachment-B-Figures.pdf
ATR-RI.pdf
15.55
3.92
6.32
1.19
7.42
5.68
9.54
35.54
7.89
0.24
42.56
4.42
0.38
0.51
0.51
1.30
0.02
0.14
0.08
2.01
0.14
0.36
11.54
11.23
9.17
8.73
0.50
0.44
0.65
0.02
1.00
0.62
0.55
0.61
0.17
36.09
0.10
1.01
1.63
0.49
1.37
0.55
7.81
0.60
76.32
27.22
0.83
7.48
0.87
2.56
8.03
0.67
Anderson-Calhoun Mine and MillDon't put on menu6topo-map.jpg
AndersonCalhoun_EECA_June2007.pdf
AndersonCalhoun_EECA_June2007_Tables.pdf
AndersonCalhoun_EECA_June2007_Figures.pdf
AndersonCalhoun_EECA_Appendices.pdf
CIP-Anderson-Calhoun.pdf
0.29
0.41
0.45
1.43
6.21
0.13
Annual Data Evaluation Monitoring Report: Year 0 Long-Term Pilot Cap Monitoring19TOC for Revised Year 0 Annual Eval Monit Rept.pdf
Appendix A.pdf
Appendix B.pdf
Appendix C.pdf
Appendix D.pdf
Appendix E.pdf
Appendix F.pdf
Appendix G.pdf
Appendix H.pdf
Appendix I.pdf
Appendix J.pdf
Appendix K.pdf
Appendix L.pdf
Appendix M.pdf
Appendix N.pdf
Appendix O.pdf
Appendix P.pdf
NW Natural Response to Comments.pdf
Revised Year 0 Annual Eval Monit Rept.pdf
0.49
0.46
0.26
4.54
0.05
4.16
1.56
1.33
0.93
0.09
0.27
0.22
0.28
0.37
0.35
0.24
0.11
0.33
15.02
Arctic Surplus6900arctic2.PDF
ESDFIG_2.pdf
ArcticSurplusESDFIG_1.pdf
ArticSurplus603.pdf
Arctic EXPLANATION OF SIGNIFICANT DIFFERENCES.pdf
Arctic Surplus fs 7-27-06.pdf
0.04
0.13
0.21
0.06
0.17
0.11
Arkema2atofina areal 300 dpi.jpg
Final Decision on Disputes of 2-19-08 and 3-27-08 by Legacy Site Services LLC (LSS) Regarding Docket No. CERCLA 10-2005-0191.pdf
1.82
1.76
Arkema Draft Report Documents622006-07-14_RevDraft_Arkema_EECA_WP_Text.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_2-Chlorophenol.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Aldrin.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_alpha-Hexachlorocyclohexane.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Aluminum.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_AppI.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_AppA.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_AppB.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_AppC.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_AppD.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_AppF.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_AppG.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_AppH.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Tetrachloroethene.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Benzaanthracene.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Benzoapyrene.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_beta-Endosulfan.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_beta-Hexachlorocyclohexane.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_bis2-ethylhexylphthalate.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Cadmium.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Carbazole.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Carbon_disulfide.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Carbon_tetrachloride.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Chlordanes.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Chloride.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Chloroform.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_cis-Chlordane.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Copper.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_DDD.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_DDE.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_DDT.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_DDx.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Dibutyl_phthalate.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Dieldrin.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Endrin.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Figures.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_gamma-Hexachlorocyclohexane.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Heptachlor_epoxide.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Hexachlorobenzene.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Hexachlorobutadiene.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_HexChromium.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Lead.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Manganese.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_MapFolio.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_MCB.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Methylene_chloride.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_mp-Xylene.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Naphthalene.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Nickel.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_PCB_Aroclors.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Pentachlorophenol.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Perchlorate.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Phenol.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Selenium.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Silver.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Tetrachlorodibenzo-p-dioxin.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Zinc.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Toluene.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Total_PAHs.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_TotalChromium.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_trans-Chlordane.pdf
2006-07-14_RevDraft_Arkema_EECA_WP_Trichloroethene.pdf
2.31
2.56
2.47
2.47
3.19
0.32
15.28
0.17
4.61
2.26
5.23
2.02
0.17
2.35
2.69
2.69
2.47
2.47
2.46
3.22
2.58
2.55
2.56
2.47
17.08
2.45
2.49
3.20
17.80
17.86
19.91
17.75
2.57
2.49
2.58
14.90
2.47
2.48
2.68
2.47
17.10
3.22
3.15
1.47
17.17
2.56
2.44
2.59
3.20
3.05
2.47
16.73
2.45
2.68
3.20
3.00
3.21
2.55
2.45
3.22
2.37
2.45
Arkema EECA Workplan 2007139Table 8-7.pdf
AppA-Supplemental Figures.pdf
AppB-SummaryofDetections.pdf
AppC-Reference Table.pdf
AppD-JSC.pdf
AppE-NPDES Permit.pdf
Arkema EECA Work Plan.pdf
Arkema EECA-redline.pdf
AttachmentA-TM - GW&SW Load Estimate 121306.pdf
AttachmentB-Isopleth Methods.pdf
Figure 1-1.pdf
Figure 2-1.pdf
Figure 2-2.pdf
Figure 2-3.pdf
Figure 2-4.pdf
Figure 3-1a.pdf
Figure 3-1b.pdf
Figure 3-2.pdf
Figure 3-3.pdf
Figure 3-4.pdf
Figure 3-5.pdf
Figure 3-6.pdf
Figure 3-7.pdf
Figure 3-8.pdf
Figure 3-9.pdf
Figure 4-1.pdf
Figure 4-2.pdf
Figure 4-3.pdf
Figure 4-4.pdf
Figure 6-1a.pdf
Figure 6-1b.pdf
Figure 6-2a.pdf
Figure 6-2b.pdf
Figure 6-3a.pdf
Figure 6-3b.pdf
Figure 6-4.pdf
Figure 6-5.pdf
Figure 6-6.pdf
Figure 6-7a.pdf
Figure 6-7b.pdf
Figure 6-8a.pdf
Figure 6-8b.pdf
Figure 6-9a.pdf
Figure 6-9b.pdf
Figure 6-9c.pdf
Figure 6-9d.pdf
Figure 6-10a.pdf
Figure 6-10b.pdf
Figure 6-10c.pdf
Figure 6-10d.pdf
Figure 6-11a.pdf
Figure 6-11b.pdf
Figure 6-11c.pdf
Figure 6-11d.pdf
Figure 6-12a.pdf
Figure 6-12b.pdf
Figure 6-12c.pdf
Figure 6-12d.pdf
Figure 6-13a.pdf
Figure 6-13b.pdf
Figure 6-13c.pdf
Figure 6-13d.pdf
Figure 6-14a.pdf
Figure 6-15a.pdf
Figure 6-15b.pdf
Figure 6-15c.pdf
Figure 6-15d.pdf
Figure 8-1.pdf
Figure 8-2.pdf
Figure 8-3.pdf
Figure 9-1.pdf
Figure 10-1.pdf
Table 1-1.pdf
Table 1-2.pdf
Table 2-1.pdf
Table 2-2.pdf
Table 2-3.pdf
Table 3-1.pdf
Table 3-2.pdf
Table 3-3.pdf
Table 3-4.pdf
Table 3-5.pdf
Table 3-6.pdf
Table 5-0_ Notes.pdf
Table 5-1a.pdf
Table 5-1b.pdf
Table 5-2.pdf
Table 5-3a.pdf
Table 5-3b.pdf
Table 5-3c.pdf
Table 5-3d.pdf
Table 5-3e.pdf
Table 5-3f.pdf
Table 5-3g.pdf
Table 5-3h.pdf
Table 5-4a.pdf
Table 5-4b.pdf
Table 5-4c.pdf
Table 5-4d.pdf
Table 5-4e.pdf
Table 5-4f.pdf
Table 5-4g.pdf
Table 5-4h.pdf
Table 5-5a.pdf
Table 5-5b.pdf
Table 5-5c.pdf
Table 5-5d.pdf
Table 5-5e.pdf
Table 5-5f.pdf
Table 5-5g.pdf
Table 5-5h.pdf
Table 5-5i.pdf
Table 5-5j.pdf
Table 5-5k.pdf
Table 5-5l.pdf
Table 5-6a.pdf
Table 5-6b.pdf
Table 5-6c.pdf
Table 5-6d.pdf
Table 5-6e.pdf
Table 5-6f.pdf
Table 5-6g.pdf
Table 5-6h.pdf
Table 5-6i.pdf
Table 5-6j.pdf
Table 5-6k.pdf
Table 5-6l.pdf
Table 5-7.pdf
Table 6-1.pdf
Table 6-2.pdf
Table 8-1.pdf
Table 8-2.pdf
Table 8-3.pdf
Table 8-4.pdf
Table 8-5.pdf
Table 8-6.pdf
Arkema EECA Work Plan-Front.pdf
WPComments7-133-07Att1.pdf
WPComments7-13-07.pdf
0.05
20.68
1.34
0.23
18.12
2.38
1.50
1.80
0.06
0.02
1.88
2.19
0.09
9.36
1.61
1.53
1.55
1.51
1.48
1.38
1.31
2.29
2.90
3.06
2.87
0.96
0.72
1.57
1.67
0.27
0.27
0.27
0.27
0.31
0.27
0.31
0.27
0.27
0.27
0.27
0.27
0.27
0.75
0.73
0.72
0.71
0.73
0.69
0.69
0.68
0.75
0.70
0.66
0.65
0.74
0.70
0.71
0.69
0.77
0.69
0.69
0.69
0.64
0.71
0.66
0.66
0.66
1.53
1.37
1.35
0.23
0.36
0.07
0.07
0.05
0.05
0.06
0.06
0.05
0.05
0.05
0.05
0.05
0.10
0.07
0.08
0.07
0.11
0.11
0.09
0.11
0.11
0.11
0.08
0.09
0.10
0.09
0.09
0.10
0.10
0.09
0.08
0.09
0.11
0.10
0.05
0.06
0.05
0.05
0.06
0.05
0.06
0.06
0.06
0.06
0.02
0.06
0.01
0.05
0.05
0.05
0.06
0.05
0.06
0.06
0.06
0.06
0.12
0.06
0.05
0.06
0.05
0.05
0.05
0.05
0.05
0.98
5.65
0.80
Arkema Photo GalleryDon't put on menu51DSCN0828.JPG
DSCN0822.JPG
DSCN0821.JPG
View of shoreline from dock 1 looking west 023.JPG
From dock 2 looking downriver to RR bridge 013.JPG
From dock 2 looking upriver 010.JPG
View from dock 1 looking downriver to dock 2 & RR bridge 024.JPG
view inside chemical plant now undergoing demolition 022.JPG
view of salt pads looking north northeast 012.JPG
Close up of treatment train for SVE system for chlorobenzene plume 019.JPG
arkema oblique.jpg
Arkema dnapl.jpg
arkema 2.JPG
arkema 3.jpg
arkema_aug17_2.jpg
arkema_aug18_3801.jpg
arkema_aug18_3803.jpg
arkema_aug18_3805.jpg
arkema_aug18_3794.jpg
arkema_aug18_008.jpg
arkema_aug18_001.jpg
arkema_aug18_004.jpg
arkema_aug19_007.jpg
arkema_aug20_005.jpg
arkema_aug20_007.jpg
arkema_aug20_020.jpg
arkema_aug21_194.jpg
arkema_aug24_003.jpg
arkema_aug24_014.jpg
arkema_aug25_004.jpg
arkema_aug26_003.jpg
arkema_aug26_009.jpg
arkema_aug26_016.jpg
arkema_aug27_002.jpg
arkema_aug27_005.jpg
ATTO81O4
September 1, 2009 005.jpg
September 2, 2009 002.jpg
September 2, 2009 003.jpg
September 2, 2009 006.jpg
September 8, 2009 002.jpg
September 8, 2009 007.jpg
September 9, 2009 006.jpg
September 10, 2009 012.jpg
arkema_sept11_007.jpg
arkema_sept16_005.jpg
arkema_sept17_012.jpg
arkema_100109_007.jpg
arkema_100109_001.jpg
arkema_102009_005.jpg
arkema_102009_010.jpg
1.03
0.96
0.97
0.26
0.28
0.33
0.24
0.32
0.21
0.30
0.20
0.14
0.70
1.29
0.07
0.29
0.23
0.20
0.16
0.13
0.17
0.27
0.14
0.17
0.10
0.13
0.14
0.17
0.20
0.72
0.42
0.29
0.51
0.19
0.32
0.39
2.31
2.44
2.36
2.88
3.05
3.64
2.28
2.68
0.27
0.21
0.27
2.13
0.22
2.19
1.92
Arkema Stormwater Interim Remedial Measures Field Sampling and Data ReportDon't put on menu8Stormwater_IRM_Nov_2_07.pdf
Appx_A_CB_Sheets.pdf
Appx_B_SW_Sheets.pdf
Appx_D_Data_Val_Rpts.pdf
Appx_E_Topo_Maps.pdf
Appx_F _FSS_Outline.pdf
Cover_Letter.pdf
Final_Letter_to_DEQ.pdf
3.29
2.04
1.30
39.75
2.30
0.17
0.10
0.51
Arkema Technical DocumentsDon't put on menu213SurfSoilSamp&AnalWkpln12-20-04.pdf
arkema Complete Final Persulfate IRM WP 070705.pdf
finalaocremoval.pdf
finalSOW 1 2005.pdf
Arkema Site Figure revised 5 9 2005.pdf
Arkema EE-CA Dispute LETTER ONLY.pdf
2005.01.12_DNAPL Eval e-Work Plan.pdf
Arkema IAS Eval Work Plan.pdf
arkema 2005.01.09_Final Test Matrix Samples e-Letter.pdf
Arkema dispute 2-2-06 cover letter.pdf
arkema dispute 2 2 06 Revised Data Screening Approach.pdf
arkema dispute 2 2 06 Figures for Revised Data Screening Approach.pdf
arkema Lots 1 & 2 Report1 6 2006 cover letter.pdf
DDT Bioaccumulation Screening v3.pdf
January 2006 Hex Chrome IRM Field Data 021006.pdf
January 2006 Analytical Data 021006.pdf
FebCrPR.pdf
arkema chrome IRM March 2006 monthly report.pdf
TR0162 Letter to Client Relocating Phase 2 Locations - 2006-05-10.pdf
1225775.pdf
Arkema_COIFiguresDraft_053006.pdf
2006-05-03_Hot Spot Report_e-Draft_Rev2.pdf
2006-04-28_DNAPL Summary e-Report_Draft_Part1of2.pdf
2006-04-28_DNAPL Summary e-Report_Draft_Part2of2.pdf
Arkema Pilot Test Workplan - Final - 2006-03-10.pdf
Arkema Complete CD.pdf
arkema 2005.01.09_Final Test Matrix Sample e-Report.pdf
arkema Lots 1 & 2 Report1 6 2006.pdf
Arkema Hex Chrome IRM Nov 2005 Monthly Report.pdf
arkema December 2005 Progress Report.pdf
Arkema EECA Workplan comments - Enclosure 11 1 2005.pdf
Arkema EECA Workplan comments 11 1 2005.pdf
EPA comments to date 7 12 2006.pdf
NorthPlantAreaRemedialActionRpt04-1995.pdf
Elf Atochem Acid Plant RI.pdf
arkema chrome irm Final Complete 060105.pdf
EnvSummRpt7-23-03.pdf
Arkema Active Pilot Test Workplan FINAL 8 July 2006.pdf
approval-memo-6-05signed.pdf
Arkema_Stormwater_WP_MJJ.pdf
arkema_in_situ_persulfate_IRM.pdf
06-8-7_Dioxin_Furan_Sampling_Letter.pdf
Arkema-Dioxin-Furan-memo-Oct.pdf
Arkema-Dispute.pdf
GW-Source-Control-IRM-Scoping-Arkema.pdf
Arkema-ODEQ-Response-Final-RI.pdf
Riverbank-soil-memo.pdf
Arkema_ODEQ_Response2.pdf
Arkema_ODEQ_Response1.pdf
Stage 1 SCE Tech Memo.pdf
Perchlorate-GAO-05-462.pdf
Arkema-Cap-Approval.pdf
2007-02-21_CompR2Rep_Sec11-3-11_Maps.pdf
PT&RAAResponseLetter.pdf
2007-02-21_CompR2Rep6_1-9ato6_112b_Maps.pdf
DDx_Mass_Analysis.pdf
DRAFT-RODs-summary.pdf
Arkema-Geotech-Compatibility-Testing.pdf
Perchlorate-Sources-Occurance-In-the-Environment.pdf
SodiumChlorateWastes.pdf
RDX-Perchlorate-Nitrate-DegradationStudies.pdf
Pechlorate-Biodegradation-HighSaltSolutions.pdf
Perchlorate-Biodegradation-HighSalts2.pdf
Perchlorate-Biodegradation-HighSalts3.pdf
Perchlorate-POUTreatment-IXResins.pdf
Perchlorate-Salinity-Inhibition-Effects.pdf
Arkema-Chloride&Perchlorate.pdf
guildslake.pdf
Final-GCR.pdf
Spr-2005-TM.pdf
Phase II Stage 1 & 2 GW-Sed Investigation.pdf
Spr-2004-GMR-AppE.pdf
Spr-2004-GMR.pdf
Win-2006-GW-Data-Submittal.pdf
Draft-Stage-1-SCE-Workplan.pdf
Stage 2 SCE Tech Memo.pdf
Draft-NFA-ISCM-WP.pdf
DataGap-TM-wfigures.pdf
Draft-Source-Control-Eval-041707.pdf
ODEQresponsetocomments.pdf
ResponsetoComments7-24-07.pdf
Riverbank Soil Data.pdf
ArkemaRBankFSPApproval.pdf
Stage-1-Beach-Sed-Sampling-Mod-Scope.pdf
Draft-WDL-EECA07.pdf
Eval-GW-Discharge-Willamette.pdf
Draft-Arkema-Groundwater-Modeling-Report.pdf
Arkema-FFS-Alts-Sum-eMemo-08.pdf
Arkema_CAG_2008_02_12.pdf
Arkema-SCE-Addendum-1.pdf
AAI7-062.1 FINAL REPORT - APPENDIX A - ELECTRONIC April, 10 2008.pdf
Bench Final Report - Arkema Facility in Portland - April 10 2008.pdf
Tab 5 - Powers February 4, 2008 E-mail.pdf
20080325 Deb Yamamoto Transmittal of EPA's Response to Arkema's Dispute Statement.pdf
Arkema Dispute Support Technical Memo 16-APR-08.pdf
Enclosure and Attachments.pdf
LSS Position Statement.pdf
scanned signature page.pdf
Tab 1A - Resolution of 'A' Comments.pdf
Tab 1B - Resolution of 'B' Comments.pdf
Tab 2 - June 26, 2007 Presentation Material.pdf
Tab 3 - Sheldrake November 7, 2007 Letter and Accepted LSS Revisions.pdf
Tab 4 - Cora January 30, 2008 E-mail.pdf
Final Decision on Disputes of 2-19-08 and 3-27-08 by Legacy Site Services LLC (LSS) Regarding Docket No. CERCLA 10-2005-0191.pdf
Appendix B Vapor Modeling Spreadsheets.pdf
2008-05-16_DRAFT_Arkema HHRA AppendixC.pdf
2008-05-16_DRAFT_Arkema HHRA Figures.pdf
2008-05-16_DRAFT_Arkema HHRA Tables.pdf
Appendix A Environmental Data and Pro UCL Output.xls
2008-05-16_DRAFT_Arkema HHRA Text.pdf
2008-07-22_Arkema Work Plan Addendum Text Figures Tables.pdf
2008-07-22_Arkema Work Plan Addendum Appendix A.pdf
2008-07-22_Arkema Work Plan Addendum Appendix B.pdf
2008-07-22_Arkema Work Plan Addendum Appendix C.pdf
2008-07-22_Arkema Work Plan Addendum Appendix D.pdf
2008-07-22_Arkema Work Plan Addendum Cover Letter.pdf
2008-07-03_Final_Arkema Stormwater IRM FFS.pdf
2008-07-03_Arkema Stormwater IRM FFS Cover Letter_Electronic.pdf
2008-07-03_Final_Arkema Stormwater IRM FFS Appendix A.pdf
2008-07-03_Final_Arkema Stormwater IRM FFS Appendix B.pdf
2008-07-03_Final_Arkema Stormwater IRM FFS Appendix C.pdf
2008-07-03_Final_Arkema Stormwater IRM FFS Appendix D.pdf
pops_report.pdf
June 19 EPA letter and Arkema 725 08 Response reduced.pdf
LSS HFO + EHC-M.xls
Arkema-Aug8-Consultation-Meeting-08.pdf
08_2008-08-21_Arkema HASP Complete.pdf
00_2008-08-21_Arkema Work Plan Appendices Cover Letter.pdf
02_2008-08-21_Arkema FSP Complete.pdf
03_2008-08-21_Arkema FSP Attachment A Complete.pdf
04_2008-08-21_Arkema FSP Attachment B Complete.pdf
05_2008-08-21_Arkema QAPP Complete.pdf
06_2008-08-21_Arkema QAPP Attachment A.pdf
06a_ARI QA Manual.pdf
06b_TA_Burlington_QAM_2008.pdf
06c_TA_Nashville_QAM_2008.pdf
06d_TA_Tacoma_QAM_2008.pdf
06e_TA_West_Sacramento_QAM_2008.pdf
07_2008-08-21_Arkema QAPP Attachment B Complete.pdf
FFS-IRM-Response-to-ODEQ-Comments.pdf
Draft-FFS-GW-Source-Control-IRM.pdf
01_2008-08-21_Arkema Work Plan Appendices Starter File.pdf
Response to EPA Comments on FSP QAPP.pdf
Table 4-4_2008-09-30_MJM.pdf
2008-10-10_Final Response to EPA Comments on WP Addendum_AugSep.pdf
Figure2-1_Cross-section .pdf
Figure 9-1 Arkema EECA schedule Final Work Plan_rev10_10_2008DRAFT.pdf
Table 2-2_2008-09-29_MJM.pdf
Arkema-Uplands-SOW-102108.pdf
Arkema-Uplands-ACO-102108.pdf
Arkema-Well-Installation-WP-120208.pdf
Arkema-Revised-Draft-Project-Management-Plan-121508.pdf
Arkema-Draft-RB-Erodible-Soil-SCSE-121508.pdf
2008-12-05_Arkema HHRA_Main Report.pdf
2008-12-05_Arkema HHRA_Appendix A.zip
2008-12-05_Arkema HHRA_Appendix B.pdf
2008-12-05_Arkema HHRA_Appendix C.pdf
2008-12-05_Arkema HHRA_Cover Letter.pdf
2009-01-16_Arkema Upland Level II ERA_Text.pdf
2009-01-16_Arkema Upland Level II ERA_Appendix A Part 1 of 7 (Text).pdf
2009-01-16_Arkema Upland Level II ERA_Appendix A Part 2 of 7 (Figures).pdf
2009-01-16_Arkema Upland Level II ERA_Appendix A Part 3 of 7 (Tables).pdf
2009-01-16_Arkema Upland Level II ERA_Appendix A Part 4 of 7 (Appendices).pdf
2009-01-16_Arkema Upland Level II ERA_Appendix A Part 5 of 7 (Appendices).pdf
2009-01-16_Arkema Upland Level II ERA_Appendix A Part 6 of 7 (Appendices).pdf
2009-01-16_Arkema Upland Level II ERA_Appendix A Part 7 of 7 (Appendices).pdf
2009-01-16_Arkema Upland Level II ERA_Appendix B Part 1 of 11 (Main Text).pdf
2009-01-16_Arkema Upland Level II ERA_Appendix B Part 2 of 11 (Figures).pdf
2009-01-16_Arkema Upland Level II ERA_Appendix B Part 3 of 11 (AppA.pdf
2009-01-16_Arkema Upland Level II ERA_Appendix B Part 4 of 11 (AppB).pdf
2009-01-16_Arkema Upland Level II ERA_Appendix B Part 5 of 11 (AppC).pdf
2009-01-16_Arkema Upland Level II ERA_Appendix B Part 6 of 11 (AppD).pdf
2009-01-16_Arkema Upland Level II ERA_Appendix B Part 7 of 11 (AppF).pdf
2009-01-16_Arkema Upland Level II ERA_Appendix B Part 8 of 11 (AppG).pdf
2009-01-16_Arkema Upland Level II ERA_Appendix B Part 9 of 11 (AppH).pdf
2009-01-16_Arkema Upland Level II ERA_Appendix B Part 10 of 11 (AppI).pdf
2009-01-16_Arkema Upland Level II ERA_Appendix B Part 11 of 11 (MapFolio).pdf
2009-01-16_Arkema Upland Level II ERA_Appendix C.pdf
2009-01-16_Arkema Upland Level II ERA_Appendix D.pdf
2009-01-16_Arkema Upland Level II ERA_Appendix E.pdf
2009-01-16_Arkema Upland Level II ERA_Appendix F.pdf
2009-01-16_Arkema Upland Level II ERA_Appendix G.pdf
2009-01-16_Arkema Upland Level II ERA_Appendix H.pdf
2009-01-16_Arkema Upland Level II ERA_Cover Letter.pdf
2009-01-16_Arkema Upland Level II ERA_Figures.pdf
2009-01-16_Arkema Upland Level II ERA_Tables.pdf
arkema_geotech_letter_apr09.pdf
arkema_eeca_wp_fsp_qapp_hasp_cond_app_061209_letter_enclosures.pdf
00_2009-05-15_Arkema EECA WP Appendices_Cover Letter.pdf
01_2009-05-15_Arkema EECA WP Appendices Starter File.pdf
02_2009-05-15_Arkema FSP.pdf
03_2009-05-15_Arkema FSP_Attachment A.pdf
04_2009-05-15_Arkema FSP_Attachment B.pdf
05_2009-05-15_Arkema QAPP.pdf
06_2009-05-15_Arkema QAPP_Attachment A.pdf
06a_QAPP Att A - Kleinfelder Quality Systems Guidelines Manual.pdf
06b_QAPP Att A - TA Burlington QAM 2008.pdf
06c_QAPP Att A - TA Knoxville QAM 2008.pdf
06d_QAPP Att A - TA Tacoma QAM 2008.pdf
06e_QAPP Att A - TA West Sacramento QAM 2008.pdf
07_2009-05-15_Arkema QAPP_Attachment B.pdf
08_2009-05-15_Arkema HASP.pdf
09_2009-05-15_Arkema HASP_Attachments.pdf
Arkema final SAP.pdf
lss_response_comments.pdf
arkema_draft_groundwater_scm_wp.pdf
stormwater workplan.pdf
Arkema_DataGaps_03_09.pdf
2009-07-02_Response to ODEQ Comments_GW Sampling.pdf
2009-08-25_Response to ODEQ Conditional Approval_Pump Test.pdf
2009-10-14_D-F Work Plan Addendum_Final.pdf
arkema_summary_remedial_alternatives_101609.pdf
dgi_soil_sampling_report_060410.pdf
0.91
6.70
0.18
0.15
0.34
1.03
0.92
0.54
0.17
0.60
0.56
1.24
0.10
0.19
1.04
1.32
0.32
2.81
0.25
0.31
3.24
4.40
3.95
3.70
2.32
5.86
2.78
4.47
4.27
3.14
0.52
0.06
1.01
10.36
12.38
3.80
8.33
2.04
0.05
5.03
0.21
0.83
0.27
0.50
0.60
5.74
0.68
2.74
2.44
38.45
1.23
0.02
11.13
0.98
4.57
0.05
0.05
0.33
0.27
0.27
0.74
0.26
0.19
0.18
0.10
0.87
0.02
1.63
56.90
6.59
2.91
0.22
11.07
13.37
4.68
29.53
14.35
1.19
8.22
0.30
0.24
0.56
0.37
0.27
22.41
1.43
5.14
2.59
0.56
5.07
2.30
1.70
0.12
0.90
0.09
5.36
3.82
0.35
0.23
0.22
4.51
1.23
0.05
1.76
0.83
1.17
1.12
2.97
16.25
1.49
1.02
0.07
0.08
0.07
0.47
0.03
4.82
0.11
1.99
0.11
0.50
0.67
1.40
3.74
0.03
2.75
1.28
0.04
0.70
1.37
0.35
0.96
0.06
0.48
1.12
2.58
2.83
1.47
0.11
16.11
9.18
0.16
1.29
0.07
0.15
0.11
0.05
0.07
0.07
0.16
1.30
0.10
2.36
19.40
3.58
0.82
0.98
0.18
1.40
0.92
13.83
0.86
16.26
15.32
31.36
17.65
2.27
10.87
13.65
0.17
4.32
2.26
5.23
2.02
0.17
0.32
1.47
5.39
0.68
0.21
0.70
0.81
0.16
0.11
2.25
0.53
0.23
1.23
0.14
0.08
0.86
1.53
0.40
1.03
0.06
0.84
1.12
1.46
2.83
1.47
0.11
0.45
0.96
4.27
0.10
0.71
1.61
5.93
0.63
0.75
0.25
1.04
15.89
Arkema Upland Remedial Investigation Lots 3 and 4 Tract A Revision 15Report Final 120105.pdf
Final Appendices G through M.pdf
Final Figures 1-1 through 7-1.pdf
Final Tables 2-1 through 7-1.pdf
Final Appendices A through F.pdf
5.21
121.78
20.23
1.19
45.97
ARRCOM (Drexler Enterprises)0
Asarco Smelter - Ruston61asarco habitat basin.pdf
Asarco oversight.pdf
P8150003.jpg
P8150002.jpg
smelter parking lot.JPG
landfill hole.JPG
site plan drawing.JPG
Slide1.JPG
Slide2.JPG
after drawing.JPG
500rust.PDF
2004 Tacoma Schedule.pdf
asarco smelter ruston Aerial Photo.pdf
study area.JPG
Asarco fs rv 9-6-05.pdf
ASARCO Expedited Capping Footprint.pdf
Asarco fs 3-13-06.pdf
ruston five year report2.pdf
00-0023.pdf
Asarco mtg fs 7-27-06.pdf
ASARCO-Lodging.pdf
ASARCO-2nd.pdf
ASARCO-Final-SOW.pdf
Asarco-FS-8-16-06.pdf
consent decree presentation.pdf
Point-Ruston-AMD-2008-11.pdf
Point-Ruston-AMD-2008-04.pdf
Point-Ruston-AMD-2008-05.pdf
Point-Ruston-AMD-2008-06.pdf
Point-Ruston-AMD-2008-07.pdf
Point-Ruston-AMD-2008-08.pdf
Point-Ruston-AMD-2008-09.pdf
Point-Ruston-AMD-2008-10.pdf
Point-Ruston-AMD-2008-12.pdf
Point-Ruston-AMD-2009-01.pdf
Point Ruston - HiVol Spectra EDD 2009-03.pdf
Point Ruston - PAM Spectra EDD 2009-02.pdf
Point Ruston - PAM Spectra EDD 2009-03.pdf
Point Ruston - HiVol Spectra EDD 2009-02.pdf
ATTJIA0E
ATT3X5RZ
Point Ruston - HiVol Spectra EDD 2009-05.pdf
Point Ruston - HiVol Spectra EDD 2009-06.pdf
Point Ruston - HiVol Spectra EDD 2009-07.pdf
point_ruston_amd_0809.pdf
Point Ruston - PAM Spectra EDD 2009-04.pdf
Point Ruston - PAM Spectra EDD 2009-06.pdf
Point Ruston - PAM Spectra EDD 2009-07.pdf
Point Ruston - PAM Spectra EDD 2009-08.pdf
point_ruston_pam_0909.pdf
Point Ruston - HiVol Spectra EDD 2009-09.pdf
Point Ruston - PAM Spectra EDD 2009-10.pdf
Point Ruston - HiVol Spectra EDD 2009-10 REVISED.pdf
Point Ruston - HiVol Spectra EDD 2009-11.pdf
Point Ruston - PAM Spectra EDD 2009-11.pdf
Point Ruston - HiVol Spectra EDD 2009-12.pdf
Point Ruston - HiVol Spectra EDD 2010-01.pdf
Point Ruston - PAM Spectra EDD 2010-01.pdf
Point Ruston - HiVol Spectra EDD 2010-02.pdf
asarco_hivol_air_monitoring_030110.pdf
ou6rod dec.pdf
0.28
0.52
0.17
0.18
0.07
0.07
0.09
0.10
0.06
0.12
0.04
0.05
0.09
0.75
0.09
0.40
0.10
2.03
1.39
0.10
0.03
1.19
0.48
0.11
0.21
0.02
0.02
0.03
0.03
0.04
0.05
0.05
0.03
0.02
0.02
0.05
0.01
0.01
0.06
0.25
0.02
0.02
0.02
0.06
0.04
0.02
0.02
0.02
0.02
0.02
0.04
0.02
0.04
0.04
0.02
0.04
0.04
0.02
0.04
0.14
0.15
Asarco Smelter Site Frequently Asked Questions0
Ashton Texaco Oil0
Astoria Marine Construction Company0
Ballard, Henry and Enoch Valley Phosphate Mines0
Bangor Naval Submarine Base15 Yr Bangor Concurrence.pdf3.10
Bangor Ordnance Disposal (USNAVY)0
Basin Oil3ATTIO12R
basin-oil-fs-08-10-07.pdf
Basin Oil Samling Summary_070607.pdf
0.09
0.14
0.05
Left Arrow IconPreviousRight Arrow IconNextPlus IconExpandMinus IconCollapseMagnifying Glass IconSearch