SIP - PSCAA - Reg 1 - Section 3.07
SECTION 3.07 COMPLIANCE TESTS
(a) Testing of sources for compliance with emission standards shall be performed in accordance with current U.S. Environmental Protection Agency approved methods unless specific methods have been adopted by the Board. Where there is no federally approved or Board approved method, testing shall be performed in accordance with a method approved in writing by the Control Officer.
(b) The owner or operator of a source shall notify the Agency in writing at least 2 weeks prior to any compliance test and provide the Agency an opportunity to review the test plan and to observe the test.
(c) The owner or operator of any source required to perform a compliance test shall submit a report to the Agency no later than 60 days after the test. The report shall include:
(1) A description of the source and the sampling location;
(2) The time and date of the test;
(3) A summary of results, reported in units and for averaging periods consistent with the applicable emission standard;
(4) A description of the test methods and quality assurance procedures employed;
(5) The amount of fuel burned or raw material processed by the source during the test;
(6) The operating parameters of the source and control equipment during the test;
(7) Field data and example calculations; and
(8) A statement signed by the senior management official of the testing firm certifying the validity of the source test report.
State adopted: 2/9/95; EPA effective: 9/30/04