40 CFR part 52.2470(e) -- EPA Approved Nonregulatory Provisions and Quasi-Regulatory Measures | Region 10 | US EPA

Jump to main content.


40 CFR part 52.2470(e) -- EPA Approved Nonregulatory Provisions and Quasi-Regulatory Measures

TABLE 1 -- APPROVED BUT NOT INCORPORATED BY REFERENCE STATUTES AND REGULATIONS
approved not IBR.pdfapproved not IBR.pdf
State citation
Title/subject
State
effective
date
EPA approval date
Explanations
Washington Department of Ecology Regulations
173-433-200Regulatory Actions and Penalties
10/18/90
Olympic Region Clean Air Agency Regulations
8.1.6Penalties
5/22/10

TABLE 2 -- ATTAINMENT, MAINTENANCE, AND OTHER PLANS

Name of SIP provisionApplicable geographic or nonattainment areaState submittal dateEPA approval dateComments
Attainment and Maintenance Planning – Carbon Monoxide
Carbon Monoxide Attainment PlanYakima4/27/79
Carbon Monoxide Attainment PlanPuget Sound1/22/93
Carbon Monoxide Attainment PlanSpokane1/22/93
Carbon Monoxide Attainment PlanVancouver1/22/93
Carbon Monoxide Attainment Plan –
Contingency Measure
Vancouver11/10/93
Carbon Monoxide Attainment Plan – VMT SupplementPuget Sound1/22/93
Carbon Monoxide Maintenance PlanPuget Sound2/29/96
Carbon Monoxide Maintenance PlanVancouver3/19/96
Carbon Monoxide Attainment Plan –
Revisions
Spokane9/14/93 and 4/30/96
Carbon Monoxide Attainment Plan –
Correction
Spokane
Carbon Monoxide Maintenance PlanYakima9/26/01
Carbon Monoxide Maintenance Plan 10-Year UpdatePuget Sound12/17/03
Carbon Monoxide Attainment Plan – Including Kaiser OrdersSpokane9/20/01 and 11/22/04
Carbon Monoxide Maintenance PlanSpokane11/29/04
Carbon Monoxide Maintenance Plan 10-Year UpdateVancouver4/25/07
Attainment and Maintenance Planning – Lead (Pb)
Lead Attainment PlanSeattle9/27/84
Attainment and Maintenance Planning – Ozone
Ozone Attainment PlanVancouver7/16/82
Ozone Attainment PlanSeattle-Tacoma7/16/82
Ozone Attainment Plan – VOC RACTSeattle-Tacoma5/14/91
Ozone Attainment Plan – VOC RACTVancouver5/14/91
Ozone Attainment Plan – Emission Statement ProgramSeattle-Tacoma1/28/93
Ozone Attainment Plan – Emission Statement ProgramVancouver1/28/93
Ozone Maintenance PlanSeattle-Tacoma3/4/96
Ozone Maintenance PlanVancouver6/13/96
Ozone Maintenance Plan 2nd 10-Year UpdateSeattle-Tacoma12/17/03
8-Hour Ozone 110(a)(1) Maintenance PlanSeattle-Tacoma2/5/08
Attainment and Maintenance Planning – Particulate Matter
Particulate Matter (PM10) Attainment PlanKent11/15/91
Particulate Matter (PM10) Attainment PlanThurston County2/17/89 and 11/15/91
Particulate Matter (PM10) Attainment PlanTacoma5/2/95
Particulate Matter (PM10) Attainment PlanSeattle2/21/95
Particulate Matter (PM10) Attainment PlanSpokane12/9/94
Particulate Matter (PM10) Attainment PlanWallula11/13/91
Particulate Matter (PM10) Attainment PlanYakima3/24/89
Particulate Matter (PM10) Maintenance PlanThurston County8/16/99
Particulate Matter (PM10) Maintenance PlanKent 8/23/99
Particulate Matter (PM10) Maintenance PlanSeattle8/23/99
Particulate Matter (PM10) Maintenance PlanTacoma8/23/99
Particulate Matter (PM10) Maintenance PlanYakima7/8/04
Particulate Matter (PM10) Attainment Plan – RevisionWallula11/30/04
Particulate Matter (PM10) Maintenance PlanSpokane11/30/04
Particulate Matter (PM10) Maintenance PlanWallula3/29/05
Particulate Matter (PM2.5) Clean Data DeterminationTacoma, Pierce County05/22/12
Particulate Matter (PM2.5) 2008 Baseline Emissions Inventory and SIP Strengthening RulesTacoma, Pierce County11/28/12
Particulate Matter (PM2.5) Approval of Motor Vehicle Emission Budgets and Determination of AttainmentTacoma, Pierce County11/28/12
Particulate Matter (PM10) 2nd
10-year Limited Maintenance
Plan
Thurston County7/1/13
Particulate Matter (PM10) 2nd
10-Year Limited Maintenance
Plan
Kent
Seattle
Tacoma
11/29/13
Visibility and Regional Haze Plans
Visibility New Source Review (NSR) for non-attainment areas for WashingtonStatewide
Washington State Visibility Protection Program
1998 Smoke Management Plan
Statewide11/5/99
Regional Haze State Implementation Plan – TransAlta BARTStatewide12/29/11
Regional Haze SIPStatewide12/22/10The Regional Haze SIP including those provisions relating to BART incorporated by reference in 52.2470 ‘Identification of plan’ with the exception of the BART provisions that are replaced with a BART FIP in 52.2498 Visibility protection., 52.2500 Best available retrofit technology requirements for the Intalco Aluminum Corporation (Intalco Works) primary aluminum plant—Better than BART Alternative.,
52.2501 Best available retrofit technology (BART) requirement for the Tesoro Refining and Marketing Company oil refinery—
Better than BART Alternative., 52.2502 Best available retrofit technology requirements for the Alcoa Inc.—Wenatchee Works primary aluminum smelter.
110(a)(2) Infrastructure and Interstate Transport
Interstate Transport for the 1997 8-Hour Ozone and PM2.5 NAAQSStatewide1/17/07
110(a)(2) Infrastructure Requirements – 1997 Ozone StandardStatewide1/24/12
110(a)(2) Infrastructure Requirements – 2008 Lead StandardStatewide4/14/14This action addresses the following CAA elements: 110(a)(2)(A), (B), (C), (D)(i)(II), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M).
Other Federally Mandated Plans
Oxygenated Gasoline Program1/22/93
Business Assistance Program11/16/92
Motor Vehicle Inspection & Maintenance Program8/21/95
Supplementary Documents
Air Quality Monitoring, Data Reporting and Surveillance Provisions4/15/81
Energy Facilities Site Evaluation Council (EFSEC) Memorandum of Agreement2/23/82


Local Navigation


URL: http://yosemite.epa.gov/r10/AIRPAGE.NSF/SIPs\SIPs/ECOLOGY/Table+e

Jump to main content.