Environmental Protection Agency
Skip common site navigation and headers
United States Environmental Protection Agency
Waste Site Cleanup & Reuse in New England
  Serving Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont & 9 Tribal Nations
Begin Hierarchical Links EPA Home > EPA New England > Cleanup > Find NE Sites > PSC RESOURCES End Hierarchical Links


 

   
Table of Contents:
 Advanced Search
 Site Type: Long Term/National Priorities List (NPL) Click to see more about Site Type and how it is used?

  PSC RESOURCES


Map this site in Cleanups in My Community
 Palmer,  Massachusetts
 Hampden County
 Street Address: 10 Water Street
 Zip Code: 01069
 Congressional
 District(s):

02
 EPA ID #: MAD980731483
 Site ID #: 0100747
 Site Aliases:

 Site Responsibility: Federal, State, Potentially Responsible Parties

 NPL LISTING HISTORY
 Proposed Date 12/30/1982
 Final Date 09/08/1983

Site Description
[Back to Top]

The 3 acre PSC Resources site operated in the 1970s as a waste oil refinery and solvent recovery plant. The facility reclaimed drained oils and solvents from Massachusetts collection points, treated them with heat, and sold them as lube oil base stock, road spray, and heavy fuel mixes. Millions of gallons of waste were left behind in tanks and lagoons when the current owner abandoned the plant in 1978. In 1982, the Massachusetts Department of Environmental Protection (MA DEP) requested assistance from EPA's Superfund program. EPA discovered several leaking tanks and containment dikes, as well as saturated soils. Surface waters, wetlands, property soils, and groundwater were found to be directly threatened by residual waste materials from past leaking tanks and containment dikes. Approximately 4,500 people live within 3 miles of the site. The Quaboag River is located 200 feet southwest of the site and is used for swimming and fishing. The property is located near a residential and commercial district and is adjacent to the town athletic field. The Palmer business district is located 1 mile from the site.

Threats and Contaminants
[Back to Top]

Shallow groundwater contamination consists mostly of volatile organic compounds (VOCs) including benzene and methylene chloride. Polychlorinated biphenyls (PCBs), including Aroclor-1248 and Aroclor-1260, and lead have previously been found in soil samples. Contaminants have previously been detected in the soils and shallow groundwater in the nearby wetlands. The contaminated soils and contaminated soils in wetlands have been removed and treated. The site is located in a 100-year flood plain, providing conditions for flooding to wash contaminants from the site into the Quaboag River.

Cleanup Approach
[Back to Top]

The site has been addressed in two stages: initial actions and a long-term remedial phase focusing on cleanup of the entire site.

Response Action Status
[Back to Top]

Initial Action The tanks were emptied of over 1 million gallons of hazardous wastes between 1979 and 1984. In 1986, the MA DEP cleaned and removed the tanks. The MA DEP also fenced the site in 1986. The EPA completed the repair and reinforcement of the fence in the fall of 1991. The repair was necessary to limit unauthorized access and to extend the fence to include the debris pile and spill area on the western and southern sides of the site. Warning signs were also posted along the fence and on facility buildings. In addition, the decontamination and demolition of site structures and buildings was completed in late 1995.

Entire Site The MA DEP studied the nature and extent of the contamination at the site. The investigation defined the contaminants and recommended alternatives for the final cleanup. The study was completed in May 1991, and a proposed plan for cleanup was distributed for public comment. The remedy, selected in 1992, called for the stabilization of the on-site contaminated soils and sediments, followed by capping. The engineering design of the remedy began in late 1994 and was completed in March 1997. Cleanup activities took place in 1997. Stabilization and capping of contaminated material was completed in November 1997. Wetland restoration activities were also completed in 1997. Maintenance of the cap, monitoring of groundwater and surface water and the restored wetlands commenced in 1998. Cleanup levels for groundwater have been met for all but two contaminants. An inspection of the restored wetlands was conducted in 2004 and 2005. The results of the inspections indicate that wetland restoration performance standards have been met at the restored wetland areas. Since wetland performance standards have been met, sediment monitoring has been suspended. In addition, due to the consistent reduction in groundwater contamination at the site, the frequency of groundwater monitoring was changed in 2009. Following the 2009 groundwater monitoring event, groundwater at the site will now be monitored every 5 years (2014, 2019, etc.)

Enforcement HighlightsIn 1982, acting under authority of the Clean Water Act, the EPA asked the owner to contain the oil discharge, determine the contents of 22 tanks, and investigate the possibility of groundwater contamination. The owner complied with all requests. In 1994, the EPA, the Department of Justice, and the State Attorney General's Office announced a settlement with approximately 165 potentially responsible parties who have agreed to pay $6 million to cover past costs and the cost of cleaning up the site. In 1995, an additional 24 parties joined the 1994 settlement.

Environmental Progress
[Back to Top]

The removal of hazardous wastes, installation of a fence, decontamination and demolition of site structures and building, and treatment of contaminated soils have reduced the potential of exposure to hazardous substance at the PSC Resources site.

Current Site Status
[Back to Top]

The site is currently in Operation and Maintenance phase. Since the last monitoring event, concentrations for the contaminants of concern have steadily decreased and most are below their respective cleanup levels. Monitoring activities have been modified to reflect improvements at the site. Sediment monitoring has been suspended as sediment performance standards have been met. Groundwater is being monitored every 5 years (2014, 2019, etc.). Restored wetlands have been monitored and maintained as required in the O&M Plan. All ten restoration areas have achieved their required performance criteria and are no longer being inspected.

EPA performed a third Five Year Review for the site which was completed on September 22, 2010. The Five Year Review, which is available at the site repositories, concluded that the remedy at the PSC Resources site is protective of human health and the environment.

Site Photos
[Back to Top]


Links to Other Site Information
[Back to Top]
Disclaimer Instructions about PDF

Newsletters & Press Releases:
Press Releases about this project  

Federal Register Notices:
Final NPL Listing  

Administrative Records:
Administrative Record Index, OU 01 Record of Decision (ROD), September 15, 1992 (1,153 KB)  

Reports and Studies:
Five Year Review Report, September 8, 2000 (1.78 MB)  
Second Five Year Review Report, September 29, 2005 (9.5 MB)  
Third Five Year Review Report, September 22, 2010 (1.8 MB)  
Draft Summer 2009 Environmental Monitoring Report, November 1, 2009 (2.01 MB)  
Draft Summer 2010 Environmental Monitoring Report, October 1, 2010 (2.26 MB)  
06/30/2011 Site Inspection Results, August 1, 2011 (1.51 MB)  
09/23/2011 Site Inspection Results, October 26, 2011 (396 KB)  

Decision Documents:
View Records of Decision (RODS) on-line (EPA HQ)  
Instiutional Controls at this Site  

Other Links:
NPL Site Narrative at Listing:  
Site Progress Profile  

Site Repositories
[Back to Top]

Palmer Public Library, 455 North Main Street, Palmer, MA 01069

OSRR Records and Information Center, 1st Floor, 5 Post Office Square, Suite 100 (HSC), Boston, MA 02109-3912 (617) 918-1440


Contacts
[Back to Top

EPA Remedial Project Manager: Don McElroy
Address: US Environmental Protection Agency
5 Post Office Square, Suite 100
Mail Code OSRR07-4
Boston, MA 02109-3912
Phone #: 617-918-1326
E-Mail Address: mcelroy.don@epa.gov

EPA Community Involvement Coordinator: Jim Murphy
Address: US Environmental Protection Agency
5 Post Office Square, Suite 100
Mail Code: ORA01-3
Boston, MA 02109-3912
Phone #: 617-918-1028
E-Mail Address: murphy.jim@epa.gov

 


Serving Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont, & 9 Tribal Nations
 
Begin Site Footer

EPA Home | Privacy and Security Notice | Contact Us

Last updated on Tuesday, October 22nd, 2013
URL: http://www.epa.gov/region1/superfund/sites/psc