|
|
| Full Document: |  |
| Title: | POST-CLOSURE REQUIREMENTS FOR SURFACE IMPOUNDMENTS LOCATED IN A 100 YEAR FLOOD PLAIN |
| RCRA Online Number: | 12169 |
| Date: | 01/01/1984 |
| To: | NA |
| From: | NA |
| Organization of Recipient: | NA |
| Description: | The floodplain requirement under 264.18(b) applies even during post-closure of a surface impoundment. If dikes are lowered to reduce the height of a closure cap, the owner or operator must demonstrate that the design will be protective. |
| Regulatory Citation(s) : | 264.18(b), 265.18(b), 264.221, 265.221  |
| Statutory Citation(s): | NA Read US Code 42, Chapter 82  |
| Topic(s): | Closure (hazardous waste); Hazardous Waste; Land Disposal Units; Post-closure (hazardous waste); Siting (waste facilities); Surface Impoundments; TSDFs |