Jump to main content.


Search Results

119 documents were retrieved.

Other EIS listings

DateAgencyState Document Title
01/16/2004NPSWA Final EISInfoFort Vancouver National Historic Site, General Management Plan and Development Concept Plans, Implementation, Oregon County, WA,
02/06/2004COEWA Final EISInfoCentralia Flood Damage Reduction Project, Chehalis River, Lewis and Thurston Counties, WA
02/13/2004DOEWA Revised Final EISInfoHanford Site Solid (Radioactive and Hazardous) Waste Program, New Information on Waste Management Alternatives, Waste Management Practices Enchancement for Low-Level Radioactive Waste, Mixed Low-Level Radioactive Waste and Transuranic Waste, Richland, Benton County, WA
02/27/2004HUDWA Final EISInfoTacoma Housing Authority (THA) HOPE VI Salisshan Redevelopment Project, Redevelopment Project, Revitalize the Community Neighborhood and Housing in the Area, Funding, NHPA Section 106, NPDES Permit, City of Tacoma, WA
03/19/2004CGDWA Final EISInfoSeattle Monorail Project (SMP), Green Line Monorail Transit System 14-Mile Construction and Operation, Reviewing of a Water Crossing at the Lake Washington Ship Canal Bridge and Duwamish Waterway Bridge Modification, USCG Bridge Permit, Endangered Species Act Section 7 Permit and US Army COE Section 404 Permit Issuance, City of Seattle, WA
03/26/2004AFSWA Final EISInfoStimson Access Project, To Access their Private Property through National Forest System Lands, Idaho Panhandle National Forests, Priest Lake Ranger District, Pend Oreille County, WA
04/09/2004FHWWA Draft EISInfoWA-99 Alaskan Way Viaduct and Seawall Replacement Project, Provide Transportation Facility and Seawall with Improved Earthquake Resistence, US Army COE Section 10 and 404 Permits, Seattle, WA
05/21/2004FHWWA Final EISInfoI-90 Two-Way Transit and HOV Operation Project, Providing Reliable Transportation between Seattle and Bellevue, Sound Transit Regional Express, US Coast Guard Permit and US Corps Nationwide Permit, King County, WA
05/28/2004AFSWA Final EISInfo49 Degrees North Mountain Resort Revised Master Development Plan, Implementation, Colville National Forest, Newport Ranger District, Stevens County, WA
05/28/2004IBRWA Final EISInfoBanks Lake Drawdown Project, Proposal to Lower the Water Surface Elevation from 1565 feet to 1560 feet in August of Each Year, Columbia River, Douglas and Grant Counties, WA
06/04/2004FHWWA Draft SupplementInfoSoutheast Issaquah Bypass Construction, Updated Information, New North/South Arterial Connecting Front Street with I-90 at the Sunset Interchange, Right-of-Way Permit, NPDES Permit and COE Section 404 Permit, King County, WA
08/20/2004FTAWA Draft EISInfoADOPTION - WA-104 Edmonds Crossing , Connecting Ferries, Buses and Rails, Funding, NPDES Permit and US Army COE Section 10 and 404 Permit Issuance, City of Edmonds, Snohomish County, WA
08/20/2004AFSWA Final EISInfoCrystal Mountain Master Development Plan, To Provide Winter and Summer Recreational Use, Special-Use-Permit, Mt. Baker-Snoqualmie National Forest, Silver Creek Watershed, Pierce County, WA
08/27/2004DOEWA Final EISInfoBP Cherry Point Cogeneration Project, To Build a 720-megawatt Gas-Fired Combined Cycle Cogeneration Facility, Energy Facility Site Evaluation Council (EFSEC), Whatcom County, WA
09/03/2004SFWWA Final EISInfoNisqually National Wildlife Refuge (NWR), Comprehensive Conservation Management Plan, Habitat Restoration, Refuge Boundary Expansion and Related Environmental Education and Recreational Opportunities, Approval and Implementation, Puget Sound, Nisqually River Delta, Thurston and Pierce Counties, WA
09/03/2004DOEWA Draft EISInfoSalmon Creek Project, Water Flow Restoration and Streambed Rehabilitation Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, WA
10/01/2004AFSWA Draft EISInfoFish Passage and Aquatic Habitat Restoration at Hemlock Dam, Implementation, Gifford Pinchot National Forest, Mount Adams District, Skamania County, WA
11/19/2004FHWWA Final EISInfoWA-104/Edmonds Crossing Project, Connecting Ferries, Bus and Rail, Funding, NPDES Permit and COE Section 10 and 404 Permit, City of Edmonds, Snohomish County, WA
12/20/2004NOAWA Final EISInfoPuget Sound Chinook Harvest Resource Management Plan (RMP) 2004-2009, Implementation, Endangered Species Act, OR and WA
12/23/2004AFSWA Draft EISInfoWhite Pass Expansion Master Development Plan, Implementation, Naches Ranger District, Okanogan-Wenatchee National Forests and Cowlitz Valley Ranger District, Gifford Pinchot National Forest, Yakima and Lewis Counties, WA
12/23/2004FHWWA Draft EISInfoWA-28 Eastside Corridor Project, Proposal to Improve WA-28 (Sunset Highway) Corridor from WA-2-97 (Ocdabashian Bridge) to 9th Street N.E. in East Wenatcheee, City of East Wenatchee, Douglas County, WA
01/14/2005NPSWA Draft SupplementInfoElwha River Ecosystem Restoration Implementation Project, Update Information, Olympic Peninsula, Challam County, WA
01/14/2005SFWWA Final EISInfoCaspian Tern (sterna caspia) Management to Reduce Predation of Juvenile Salmonids in the Columbia River Estuary, To Comply with the 2002 Settlement Agreement, Endangered Species Act (ESA), Columbia River, WA, OR, ID and CA
01/28/2005AFSWA Draft EISInfoMethow Transmission Project, Construction of New Transmission Line or Reconstruction an Existing Line, Okanogan and Wenatchee National Forests, Methow Valley Ranger District, Okanogan County, WA
02/11/2005NOAWA Draft EISInfoWashington State Forest Habitat Conservation Plan, Propose Issuance of Multiple Species Incidental Take Permit or 4(d)Rules, NPDES Permit, US Army COE Setion 10 and 404 Permits, WA
03/11/2005FRCWA Draft EISInfoCapacity Replacement Project, Construction and Operation of 79,5 miles Pipeline; Modify 5 Existing Compressor Stations, US Army COE 10 and 404 Permits, Whatcom, Skagit, Snohomish, King, Pierce and Thurston Counties, WA
03/11/2005COEWA Draft EISInfoLower Snake River Navigation Maintenance, To Perform Routine Maintenance of the Federal Navigation Channel and Berthing Areas, Lower Snake and Clearwater Rivers, WA and ID
05/20/2005AFSWA Draft EISInfoGrowden Dam Sherman Creek Restoration Project, and Forest Plan Amendment #28, Implementation, Colville National Forest, Ferry County, WA
05/27/2005NPSWA Draft EISInfoMountain Lake Fisheries Management Plan for the North Cascades National Service Complex, Implementation, North Cascades National Park, Whatcom, Skagit and Chelan Counties, WA
06/10/2005FHWWA Draft EISInfoInterstate 90 Snoqualmie Pass East Project, Proposes to Improve a 15-mile Portion of I-90 from Milepost 55.10 in Hyak to Milepost 70.3 New Easton, Funding, US Army COE Section 404 Permit and NPDES Permit, Kittitas County, WA
07/08/2005AFSWA Draft SupplementInfoUpper Charley Subwatershed Ecosystem Restoration Projects, Proposing to Amend the Umatilla National Forests Land and Resource Management Plan to Incorporate Management for Canada lynx, Pomeroy Ranger District, Umatilla National Forest, Garfield County, WA
07/29/2005AFSWA Final SupplementInfoDeadman Creek Ecosystem Management Projects, Information of the Planning the Analysis of the Watershed, Three Rivers Ranger District, Colville National Forest, Ferry County, WA
08/05/2005FRCWA Final EISInfoCapacity Replacement Project, Construction and Operation of 79.5 miles Pipeline: Modify 5 Existing Compressor Stations, US Army COE 10 and 404 Permits, Whatcom, Skagit, Snohomish, King, Pierce and Thurston Counties, WA
08/26/2005NPSWA Draft EISInfoEbey's Landing National Historical Reserve General Management Plan, Implementation, Town of Coupeville, Island County, WA
09/02/2005NPSWA Final SupplementInfoElwha River Ecosystem Restoration Implementation Project, Update Information, Olympic Peninsula, Challam County, WA
09/09/2005FRCWA Draft EISInfoRocky Reach Hydroelectric Project, (FERC/DEIS-0184D), Application for a New License for the Existing 865.76 Megawatt Facility, Public Utility District No. 1 (PUD), Columbia River, Chelan County, WA
09/23/2005FRCWA Draft EISInfoLewis River Hydroelectric Projects, Relicensing the Swift No. 1 (FERC No. 2111-018), Swift No. 2 (FERC No. 2213-011), Yale (FERC No. 2071-013), Merwin (FERC No. 935-053) Project, Application for Relicense, North Fork Lewis River, Cowlitz, Clark and Shamania Counties, WA
10/07/2005FHWWA Draft EISInfoSouth Park Bridge Project, Proposes to Rehabilitate or Replace the Historic South Park Ridge over the Duwamish Waterway at 14th/16 Avenue S, US Coast Guard Permit and U.S. Army COE Section 10 and 404 Permits, King County, WA
10/14/2005FTAWA Third Draft SupplementInfoCentral Link Light Rail Transit Project (Sound Transit) Construction and Operation of the North Link Light Rail Extension, from Downtown Seattle and Northgate, Updated Information on Refined Design Concepts, Funding, Right-of-Way and US Army COE Section 404 Permits, King County, WA
11/04/2005AFSWA Final EISInfoFish Passage and Aquatic Habitat Restoration at Hemlock Dam, Implementation, Gifford Pinchot National Forest, Mount Adams District, Skamania County, WA
12/09/2005GSAWA Draft EISInfoPeace Arch Port of Entry Redevelopment Project, Improvements to Security, Safety and Functionality, Canadian Border in Blaine, Whatcom County, WA
12/23/2005AFSWA Draft EISInfoThe Summit at Snoqualmie Master Development Plan (MPD), Proposal to Ensure Long-Term Economic Viability, Mt. Baker-Snoqualmie/Okanogan-Wenatchee National Forests, King County, WA
12/30/2005AFSWA Final SupplementInfoUpper Charley Subwatershed Ecosystem Restoration Projects, Proposing to Amend the Umatilla National Forests Land and Resource Management Plan to Incorporate Management for Canada Lynx, Pomeroy Ranger District, Umatilla National Forest, Garfield County, WA
01/27/2006NOAWA Final EISInfoWashington State Forest Habitat Conservation Plan, Propose Issuance of Multiple Species Incidental Take Permit of 4(d) Rules, NPDES Permit, US Army COE Section 10 and 404 Permits, WA
01/27/2006FTAWA Draft EISInfoSouth Valley Corridor Project, Improvement to Existing Urban Transportation System, Light Rail Transit (LRT), Right-of-Way Grant, City of Liberty Lake, Spokane County, WA
03/03/2006FRCWA Draft EISInfoPriest Rapids Hydroelectric Project, FERC Project #2114-116 Relicensing Application for New License, Columbia River, Grant, Yakima, Kittitas, Douglas, Benton, and Chelan Counties, WA
03/17/2006AFSWA Final EISInfoMethow Transmission Project, Construction of New Transmission Line or Reconstruction an Existing Line, Okanogan and Wenatchee National Forests, Methow Valley Ranger District, Okanogan County, WA
03/24/2006AFSWA Final EISInfoGrowden Dam Sherman Creek Restoration Project, and Forest Plan Amendment #28, Implementation, Colville National Forest, Ferry County, WA
03/31/2006FRCWA Final EISInfoLewis River Hydroelectric Projects, Relicensing the Swift No. 1 (FERC No. 2111-018), Swift No. 2 (FERC No. 2213-011), Yale (FERC No. 2071-013), Merwin (FERC No. 935-053) Project, Application for Relicense, North Fork Lewis River, Cowlitz, Clark and Shamania Counties, WA
04/07/2006FTAWA Third Final SupplementInfoCentral Link Light Rail Transit Project (Sound Transit) Construction and Operation of the North Link Light Rail Extension, from Downtown Seattle and Northgate, Updated Information on Refined Design Concepts, Funding, Right-of-Way and US Army COE Section 404 Permits, King County, WA
04/14/2006BIAWA Draft EISInfoCowlitz Indian Tribe Trust Acquisition and Casino Project, Take 151.87 Acres into Federal Trust and Issuing of Reservation Proclamation, and Approving the Gaming Development and Management Contract, Clack County, WA
04/14/2006FRCWA Draft EISInfoBaker River Hydroelectric Project, Application to Relicense the Upper Baker and Lower Baker Developments, Mt. Baker-Snoqualmie National Forest, Baker River, Whatcom and Skagit Counties, WA
04/28/2006AFSWA Draft EISInfoSchool Fire Salvage Recovery Project, Salvage Harvest Fire-Killed (dead) and Fire-Damaged (dying) Trees, Implementation, Pomeroy Ranger District, Umatilla National Forest, Columbia and Garfield Counties, WA
06/02/2006GSAWA Final EISInfoPeace Arch Port of Entry Redevelopment Project, Improvements to Security, Safety and Functionality, Canadian Border in Blaine, Whatcom County, WA
06/16/2006AFSWA Draft EISInfoOlympic National Forest, Beyond Prevention: Site-Specific Invasive Plant Treatment Project, Implementation, Clallam, Grays Harbor, Jefferson and Mason Counties, WA
06/16/2006NPSWA Draft EISInfoOlympic National Park General Management Plan, Implementation, Clallam, Grays Harbor, Jefferson and Mason Counties, WA
07/14/2006AFSWA Final EISInfoSchool Fire Salvage Recovery Project, Salvage Harvest Fire-Killed (dead) and Fire-Damaged (dying) Trees, Implementation, Pomeroy Ranger District, Umatilla National Forest, Columbia and Garfield Counties, WA
07/28/2006FHWWA Draft SupplementInfoWA-99 Alaskan Way Viaduct and Seawall Replacement Project, Additional Information and Evaluation of Construction Plan, Provide Transportation Facility and Seawall with Improved Earthquake Resistence, US Army COE Section 10 and 404 Permits, Seattle, WA
08/11/2006FRCWA Final EISInfoRocky Reach Hydroelectric Project, (FERC/DEIS-0184F), Application for a New License for the Existing 865.76 Megawatt Facility, Public Utility District No. 1 (PUD), Columbia River, Chelan County, WA
08/18/2006FHWWA Draft EISInfoWA-520 Bridge Replacement and HOV Project, Replace WA-520's Portage Bay and Evergreen Point Bridges and Improve Roadway between I-5 in Seattle and Bellevue Way or 108th Avenue Northeast on the Eastside, US Coast Guard Permit and US Army COE Section 10 and 404 Permits, King County, WA
08/25/2006AFSWA Draft EISInfoBuckhorn Access Project, To Utilize the Marias Creek Route to Construct and Reconstruct Roads, Funding, NPDES Permit and US Army COE Section 404 Permit, Okanogan and Wenatchee National Forests, Tonasket Ranger District, Okanogan County, WA
09/01/2006AFSWA Draft EISInfoGifford-Pinchot National Forest and Columbia River Gorge National Scenic Area (Washington Portion) Site-Specific Invasive Plant Treatment Project, Implementation, Skamania, Cowlitz, Lewis, Clark, Klickitat Counties, WA
09/08/2006BIAWA Draft EISInfoSpokane Tribes Integrated Resource Management Plan, Implementation, Stevens County, WA
09/15/2006FRCWA Final EISInfoBaker River Hydroelectric Project, Application to Relicense the Upper Baker and Lower Baker Developments, Mt. Baker-Snoqualmie National Forest, Baker River, Whatcom and Skagit Counties, WA
10/13/2006NPSWA Final EISInfoEbey's Landing National Historical Reserve General Management Plan, Implementation, Town of Coupeville, Island County, WA
10/20/2006FHWWA Draft EISInfoEast Lake Sammamish Master Plan Trail, Design and Construct an Alternative Non-Motorized Transportation and Multi-Use Recreational Trail, Funding and US Army COE Section 404 Permit, King County, WA
11/09/2006AFSWA Draft EISInfoNatapoc Ridge Restoration Project, To Improve Forest Health and Sustainability, and Reduce Wildfire and Hazardous Fuels, Wenatchee River Ranger District, Okanogan-Wenatchee National Forest, Chelan County, WA
11/24/2006FRCWA Final EISInfoPriest Rapids Hydroelectric Project, FERC Project #2114-116 Relicensing Application for New License, Columbia River, Grant, Yakima, Kittitas, Douglas, Benton, and Chelan Counties, WA
12/01/2006FHWWA Final EISInfoWA-28 Eastside Corridor Project, Proposal to Improve WA-28 (Sunset Highway) Corridor from WA-2-97 (Ocdabashian Bridge) to 9th Street N.E. in East Wenatcheee, City of East Wenatchee, Douglas County, WA
12/01/2006FHWWA Second Final EIS (Tiering)InfoWA-167 Freeway Project, Construction, from 161 (Meridan Street North) in the City of Puyallup to the WA-509 Freeway in the City of Tacoma, Funding, US Coast Guard, NPDES, US Army COE Section 10 and 404 Permits, Cities of Puyallup, Fife, Edgewood, Milton, and Tacoma, Pierce County, WA
12/15/2006SFWWA Draft EISInfoHanford Reach National Mounument Comprehensive Conservation Plan, Management of Monument Resources, Programs and Visitors for the next 15 years, Adams, Benton. Franklin and Grant Counties, WA
02/02/2007AFSWA Final EISInfoBuckhorn Access Project, To Utilize the Marias Creek Route to Construct and Reconstruct Roads, Funding, NPDES Permit and US Army COE Section 404 Permit, Okanogan and Wenatchee National Forests, Tonasket Ranger District, Okanogan County, WA
03/09/2007BPAWA Draft EISInfoPort Angeles - Juan de Fuca Transmission Project, Construct a 550-Megawatt Direct Current Cable from Victoria, British Columbia, across the Strait of Juan de Fuca to Port Angeles, Presidential Permit, Clallam County, WA
03/09/2007AFSWA Draft SupplementInfoSchool Fire Salvage Recovery Project, To Clarify Definitions of Live and Dead Trees, Implementation, Pomeroy Ranger District, Umatilla National Forest, Columbia and Garfield Counties, WA
03/30/2007HUDWA Draft EISInfoWestpark Redevelopment Master Plan, Redevelop of 82-acre Site to create a Mixed-Use, Mixed-Income Pedestrian Oriented Urban Community , Funding and US Army COE Section 10 Permit, City of Bremerton, Kitsap County, WA
05/04/2007BPAWA Draft EISInfoChief Joseph Hatchery Program, Construction, Operation and Maintenance of a Chinook Salmon Hatchery Production Program, Confederated Tribes of the Colville Reservation (Colville Tribes), Okanogan River and Columbia River, Okanogan County, WA
05/11/2007AFSWA Final SupplementInfoSchool Fire Salvage Recovery Project, To Clarify Definitions of Live and Dead Trees, Implementation, Pomeroy Ranger District, Umatilla National Forest, Columbia and Garfield Counties, WA
05/25/2007HUDWA Final EISInfoWestpark Redevelopment Master Plan, Redevelop of 82-acre Site to create a Mixed-Use, Mixed-Income Pedestrian Oriented Urban Community , Funding and US Army COE Section 10 Permit, City of Bremerton, Kitsap County, WA
06/01/2007AFSWA Draft EISInfoTripod Fire Salvage Project, Proposal to Salvage Harvest Dead Trees and Fire-Injured Trees Expected to Die Within One Year, Methow Valley and Tonasket Ranger Districts, Okanogan and Wenatchee National Forests, Okanogan County, WA
06/22/2007AFSWA Final EISInfoNatapoc Ridge Restoration Project, To Improve Forest Health and Sustainability, and Reduce Wildfire and Hazardous Fuels, Wenatchee River Ranger District, Okanogan-Wenatchee National Forest, Chelan County, WA
07/06/2007AFSWA Final EISInfoWhite Pass Expansion Master Development Plan, Implementation, Naches Ranger District, Okanogan-Wenatchee National Forests and Cowlitz Valley Ranger District, Gifford Pinchot National Forest, Yakima and Lewis Counties, WA
07/27/2007AFSWA Draft EISInfoOld Curlew Ranger Station Facilities Disposal Project, Proposal to Sell 3-Acre Parcel Including Buildings, Republic Ranger District, Colville National Forest, South Side of Curlew, Ferry County, WA
09/28/2007AFSWA Final EISInfoTripod Fire Salvage Project, Proposal to Salvage Harvest Dead Trees and Fire-Injured Trees Expected to Die Within One Year, Methow Valley and Tonasket Ranger Districts, Okanogan and Wenatchee National Forests, Okanogan County, WA
10/12/2007BPAWA Final EISInfoPort Angeles - Juan de Fuca Transmission Project, Construct a 550-Megawatt Direct Current Cable from Victoria, British Columbia, across the Strait of Juan de Fuca to Port Angeles, Presidential Permit, Clallam County, WA
01/11/2008FHWWA Final EISInfoSoutheast Issaquah Bypass Construction, Updated Information, New North/South Arterial Connecting Front Street with I-90 at the Sunset Interchange, Right-of-Way Permit, NPDES Permit and COE Section 404 Permit, King County, WA
01/11/2008AFSWA Final EISInfoOld Curlew Ranger Station Facilities Disposal Project, Proposal to Sell 3-Acre Parcel Including Buildings, Republic Ranger District, Colville National Forest, South Side of Curlew, Ferry County, WA
01/18/2008NPSWA Draft EISInfoSan Juan Island National Historical Park, General Management Plan, Implementation, WA
02/08/2008IBRWA Draft EISInfoYakima River Basin Water Storage Feasibility Study, Create Additional Water Storage, Benton, Yakima, Kittitas Counties, WA
02/29/2008NOAWA Draft EISInfoPROGRAMMATIC - Incorporation of the Revised Washington Shoreline Management Act Guidelines into the Federally Approved Washington Coastal Management Program, Amendment No. 4 Approval, Coastal Counties in WA
03/14/2008NPSWA Final EISInfoOlympic National Park General Management Plan, Implementation, Clallam, Grays Harbor, Jefferson and Mason Counties, WA
03/28/2008BPAWA Draft EISInfoLyle Falls Fish Passage Project, To Improve Fish Passage to Habitat in the Upper Part of the Watershed, Located on the Lower Klickitat River, Klickitat County, WA
05/02/2008AFSWA Final EISInfoGifford-Pinchot National Forest and Columbia River Gorge National Scenic Area (Washington Portion) Site-Specific Invasive Plant Treatment Project, Implementation, Skamania, Cowlitz, Lewis, Clark, Klickitat Counties, WA
05/09/2008NOAWA Draft EISInfoProposed Authorization of the Makah Indian Tribe's Request to Hunt Gray Whales in the Tribe's Usual and Accustomed Fishing Grounds off the Coast of Washington
05/30/2008BIAWA Final EISInfoCowlitz Indian Tribe Trust Acquisition and Casino Project, Take 151.87 Acres into Federal Trust and Issuing of Reservation Proclamation, and Approving the Gaming Development and Management Contract, Clack County, WA
06/13/2008AFSWA Draft EISInfoRepublic Ranger Station Excess Residence Sale Project, Proposes to Sell a 0.72 Acre Parcel of Land with a Residential Building , Republic Ranger District, Colville National Forest, Ferry County, WA
06/20/2008BIAWA Final EISInfoSpokane Tribes Integrated Resource Management Plan (IRMP) for the Spokane Indian Reservation, Implementation, Stevens County, WA
06/20/2008AFSWA Draft EISInfoDosewallips Road Washout Project, To Reestablish Road Access to both Forest Service Road (FSR) 2610 and Dosewallips Road, Hood Canal Ranger District Olympic National Forest, Olympic National Park, Jefferson County, WA
07/18/2008NOAWA Final EISInfoADOPTION - Fish Passage and Aquatic Habitat Restoration at Hemlock Dam, Implementation, Gifford Pinchot National Forest, Mount Adams District, Skamania County, WA
07/18/2008NPSWA Final EISInfoMountain Lake Fisheries Management Plan for the North Cascades National Service Complex, Implementation, North Cascades National Park, Whatcom, Skagit and Chelan Counties, WA
08/15/2008SFWWA Final EISInfoHanford Reach National Monument Comprehensive Conservation Plan, Management of Monument Resources, Programs and Visitors for the Next 15 Years, Adams, Benton. Franklin and Grant Counties, WA
08/29/2008FHWWA Final EISInfoInterstate 90 Snoqualmie Pass East Project, Proposes to Improve a 15-mile Portion of I-90 from Milepost 55.10 in Hyak to Milepost 70.3 New Easton, Funding, US Army COE Section 404 Permit and NPDES Permit, Kittitas County, WA
09/12/2008USNWA Draft EISInfoNaval Sea Systems Command (NAVSEA). Naval Undersea Warfare Center (NUWC), Keyport Complex Extension, Propose to Extend the Operational Areas, Three Distinct Range Sites: Keyport Range Site; Dabob Bay Range Complex (DBRC) Site, Quinault Underwater Tracking Range Site, Gray Harbor, Jefferson, Kitsap and Mason Counties, WA
10/31/2008NPSWA Final EISInfoSan Juan Island National Historical Park, General Management Plan, Implementation, WA
11/21/2008AFSWA Final EISInfoThe Summit at Snoqualmie Master Development Plan (MPD), Proposal to Ensure Long-Term Economic Viability, Mt. Baker-Snoqualmie/Okanogan-Wenatchee National Forests, King and Kittitas Counties, WA
12/05/2008BPAWA Final EISInfoLyle Falls Fish Passage Project, To Improve Fish Passage to Habitat in the Upper Part of the Watershed, Located on the Lower Klickitat River, Klickitat County, WA
12/12/2008FTAWA Draft EISInfoEast Link Rail Transit Project, Proposes to Construct and Operate an Extension of the Light Rail System from downtown Seattle to Mercer Island, Bellevue, and Redmond via Interstate 90, Funding and US Army COE Section 404 and 10 Permits, Seattle, WA
12/29/2008USNWA Draft EISInfoNaval Base Kitsap - Bangor, Construct and Operate a Swimmer Interdiction Security System (SISS), Silverdatle Kitsap County, WA
12/29/2008IBRWA Final EISInfoYakima River Basin Water Storage Feasibility Study, Create Additional Water Storage, Benton, Yakima, Kittitas Counties, WA
01/23/2009AFSWA Final EISInfoRepublic Ranger Station Excess Residence Sale Project, Proposes to Sell a 0.72 Acre Parcel of Land with a Residential Building , Republic Ranger District, Colville National Forest, Ferry County, WA
04/24/2009COEWA Draft SupplementInfoCommencement Bay "Reauthorization" of Dredged Material Management Program Disposal Site, Implementation, Central Puget Sound, Tacoma, WA
05/29/2009NOAWA Draft EISInfoPROGRAMMATIC - Lower Duwamish River Natural Resource Damage Assessment (NRDA) Restoration Plan, Implementation, King County, WA
06/05/2009FHWWA Draft EISInfoWA-502 Corridor Widening Project, Proposes Improvements to Five Miles of WA-502 (NE-219th Street) between NE 15th Avenue and NE 102nd Avenue, Funding, Clark County, WA
08/17/2009ARDWA Final EISInfoADOPTION - White Pass Expansion Master Development Plan, Implementation, Naches Ranger District, Okanogan-Wenatchee National Forests and Cowlitz Valley Ranger District, Gifford Pinchot National Forest, Yakima and Lewis Counties, WA
08/17/2009COEWA Final SupplementInfoCommencement Bay "Reauthorization" of Dredged Material Management Program Disposal Site, Implementation, Central Puget Sound, Tacoma, WA
08/17/2009BLMWA Draft EISInfoBlackfoot Bridge Mine Project, Developing Three Mine Pits, Haul Roads, Water Management Structures, and Overburden Disposal Areas, Implementation, Caribou County, ID
09/11/2009USNWA Final EISInfoNaval Base Kitsap - Bangor, Construct and Operate a Swimmer Interdiction Security System (SISS), Silverdale Kitsap County, WA
09/11/2009USAWA Draft EISInfoFort Lewis Army Growth and Force Structures Realignment, Implementation, Fort Lewis and Yakima Training Center, Kittitas, Pierce, Thurston and Yakima Counties, WA
10/30/2009DOEWA Draft EISInfoHanford Site Tank Closure and Waste Management Project, Implementation, Richland, Benton County, WA
11/06/2009FRBSFWA Draft EISInfoFederal Reserve Bank of San Francisco, Propose to sell the Property at 1015 Second Avenue that Eligible for Listing on the National Register of Historic Places, located in Seattle, WA


Local Navigation



Jump to main content.