Search Results
119 documents were retrieved.
Other EIS listings
| Date | Agency | State | Document | Title | ||
|---|---|---|---|---|---|---|
| 01/16/2004 | NPS | WA | Final EIS | Info | Fort Vancouver National Historic Site, General Management Plan and Development Concept Plans, Implementation, Oregon County, WA, | |
| 02/06/2004 | COE | WA | Final EIS | Info | Centralia Flood Damage Reduction Project, Chehalis River, Lewis and Thurston Counties, WA | |
| 02/13/2004 | DOE | WA | Revised Final EIS | Info | Hanford Site Solid (Radioactive and Hazardous) Waste Program, New Information on Waste Management Alternatives, Waste Management Practices Enchancement for Low-Level Radioactive Waste, Mixed Low-Level Radioactive Waste and Transuranic Waste, Richland, Benton County, WA | |
| 02/27/2004 | HUD | WA | Final EIS | Info | Tacoma Housing Authority (THA) HOPE VI Salisshan Redevelopment Project, Redevelopment Project, Revitalize the Community Neighborhood and Housing in the Area, Funding, NHPA Section 106, NPDES Permit, City of Tacoma, WA | |
| 03/19/2004 | CGD | WA | Final EIS | Info | Seattle Monorail Project (SMP), Green Line Monorail Transit System 14-Mile Construction and Operation, Reviewing of a Water Crossing at the Lake Washington Ship Canal Bridge and Duwamish Waterway Bridge Modification, USCG Bridge Permit, Endangered Species Act Section 7 Permit and US Army COE Section 404 Permit Issuance, City of Seattle, WA | |
| 03/26/2004 | AFS | WA | Final EIS | Info | Stimson Access Project, To Access their Private Property through National Forest System Lands, Idaho Panhandle National Forests, Priest Lake Ranger District, Pend Oreille County, WA | |
| 04/09/2004 | FHW | WA | Draft EIS | Info | WA-99 Alaskan Way Viaduct and Seawall Replacement Project, Provide Transportation Facility and Seawall with Improved Earthquake Resistence, US Army COE Section 10 and 404 Permits, Seattle, WA | |
| 05/21/2004 | FHW | WA | Final EIS | Info | I-90 Two-Way Transit and HOV Operation Project, Providing Reliable Transportation between Seattle and Bellevue, Sound Transit Regional Express, US Coast Guard Permit and US Corps Nationwide Permit, King County, WA | |
| 05/28/2004 | AFS | WA | Final EIS | Info | 49 Degrees North Mountain Resort Revised Master Development Plan, Implementation, Colville National Forest, Newport Ranger District, Stevens County, WA | |
| 05/28/2004 | IBR | WA | Final EIS | Info | Banks Lake Drawdown Project, Proposal to Lower the Water Surface Elevation from 1565 feet to 1560 feet in August of Each Year, Columbia River, Douglas and Grant Counties, WA | |
| 06/04/2004 | FHW | WA | Draft Supplement | Info | Southeast Issaquah Bypass Construction, Updated Information, New North/South Arterial Connecting Front Street with I-90 at the Sunset Interchange, Right-of-Way Permit, NPDES Permit and COE Section 404 Permit, King County, WA | |
| 08/20/2004 | FTA | WA | Draft EIS | Info | ADOPTION - WA-104 Edmonds Crossing , Connecting Ferries, Buses and Rails, Funding, NPDES Permit and US Army COE Section 10 and 404 Permit Issuance, City of Edmonds, Snohomish County, WA | |
| 08/20/2004 | AFS | WA | Final EIS | Info | Crystal Mountain Master Development Plan, To Provide Winter and Summer Recreational Use, Special-Use-Permit, Mt. Baker-Snoqualmie National Forest, Silver Creek Watershed, Pierce County, WA | |
| 08/27/2004 | DOE | WA | Final EIS | Info | BP Cherry Point Cogeneration Project, To Build a 720-megawatt Gas-Fired Combined Cycle Cogeneration Facility, Energy Facility Site Evaluation Council (EFSEC), Whatcom County, WA | |
| 09/03/2004 | SFW | WA | Final EIS | Info | Nisqually National Wildlife Refuge (NWR), Comprehensive Conservation Management Plan, Habitat Restoration, Refuge Boundary Expansion and Related Environmental Education and Recreational Opportunities, Approval and Implementation, Puget Sound, Nisqually River Delta, Thurston and Pierce Counties, WA | |
| 09/03/2004 | DOE | WA | Draft EIS | Info | Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, WA | |
| 10/01/2004 | AFS | WA | Draft EIS | Info | Fish Passage and Aquatic Habitat Restoration at Hemlock Dam, Implementation, Gifford Pinchot National Forest, Mount Adams District, Skamania County, WA | |
| 11/19/2004 | FHW | WA | Final EIS | Info | WA-104/Edmonds Crossing Project, Connecting Ferries, Bus and Rail, Funding, NPDES Permit and COE Section 10 and 404 Permit, City of Edmonds, Snohomish County, WA | |
| 12/20/2004 | NOA | WA | Final EIS | Info | Puget Sound Chinook Harvest Resource Management Plan (RMP) 2004-2009, Implementation, Endangered Species Act, OR and WA | |
| 12/23/2004 | AFS | WA | Draft EIS | Info | White Pass Expansion Master Development Plan, Implementation, Naches Ranger District, Okanogan-Wenatchee National Forests and Cowlitz Valley Ranger District, Gifford Pinchot National Forest, Yakima and Lewis Counties, WA | |
| 12/23/2004 | FHW | WA | Draft EIS | Info | WA-28 Eastside Corridor Project, Proposal to Improve WA-28 (Sunset Highway) Corridor from WA-2-97 (Ocdabashian Bridge) to 9th Street N.E. in East Wenatcheee, City of East Wenatchee, Douglas County, WA | |
| 01/14/2005 | NPS | WA | Draft Supplement | Info | Elwha River Ecosystem Restoration Implementation Project, Update Information, Olympic Peninsula, Challam County, WA | |
| 01/14/2005 | SFW | WA | Final EIS | Info | Caspian Tern (sterna caspia) Management to Reduce Predation of Juvenile Salmonids in the Columbia River Estuary, To Comply with the 2002 Settlement Agreement, Endangered Species Act (ESA), Columbia River, WA, OR, ID and CA | |
| 01/28/2005 | AFS | WA | Draft EIS | Info | Methow Transmission Project, Construction of New Transmission Line or Reconstruction an Existing Line, Okanogan and Wenatchee National Forests, Methow Valley Ranger District, Okanogan County, WA | |
| 02/11/2005 | NOA | WA | Draft EIS | Info | Washington State Forest Habitat Conservation Plan, Propose Issuance of Multiple Species Incidental Take Permit or 4(d)Rules, NPDES Permit, US Army COE Setion 10 and 404 Permits, WA | |
| 03/11/2005 | FRC | WA | Draft EIS | Info | Capacity Replacement Project, Construction and Operation of 79,5 miles Pipeline; Modify 5 Existing Compressor Stations, US Army COE 10 and 404 Permits, Whatcom, Skagit, Snohomish, King, Pierce and Thurston Counties, WA | |
| 03/11/2005 | COE | WA | Draft EIS | Info | Lower Snake River Navigation Maintenance, To Perform Routine Maintenance of the Federal Navigation Channel and Berthing Areas, Lower Snake and Clearwater Rivers, WA and ID | |
| 05/20/2005 | AFS | WA | Draft EIS | Info | Growden Dam Sherman Creek Restoration Project, and Forest Plan Amendment #28, Implementation, Colville National Forest, Ferry County, WA | |
| 05/27/2005 | NPS | WA | Draft EIS | Info | Mountain Lake Fisheries Management Plan for the North Cascades National Service Complex, Implementation, North Cascades National Park, Whatcom, Skagit and Chelan Counties, WA | |
| 06/10/2005 | FHW | WA | Draft EIS | Info | Interstate 90 Snoqualmie Pass East Project, Proposes to Improve a 15-mile Portion of I-90 from Milepost 55.10 in Hyak to Milepost 70.3 New Easton, Funding, US Army COE Section 404 Permit and NPDES Permit, Kittitas County, WA | |
| 07/08/2005 | AFS | WA | Draft Supplement | Info | Upper Charley Subwatershed Ecosystem Restoration Projects, Proposing to Amend the Umatilla National Forests Land and Resource Management Plan to Incorporate Management for Canada lynx, Pomeroy Ranger District, Umatilla National Forest, Garfield County, WA | |
| 07/29/2005 | AFS | WA | Final Supplement | Info | Deadman Creek Ecosystem Management Projects, Information of the Planning the Analysis of the Watershed, Three Rivers Ranger District, Colville National Forest, Ferry County, WA | |
| 08/05/2005 | FRC | WA | Final EIS | Info | Capacity Replacement Project, Construction and Operation of 79.5 miles Pipeline: Modify 5 Existing Compressor Stations, US Army COE 10 and 404 Permits, Whatcom, Skagit, Snohomish, King, Pierce and Thurston Counties, WA | |
| 08/26/2005 | NPS | WA | Draft EIS | Info | Ebey's Landing National Historical Reserve General Management Plan, Implementation, Town of Coupeville, Island County, WA | |
| 09/02/2005 | NPS | WA | Final Supplement | Info | Elwha River Ecosystem Restoration Implementation Project, Update Information, Olympic Peninsula, Challam County, WA | |
| 09/09/2005 | FRC | WA | Draft EIS | Info | Rocky Reach Hydroelectric Project, (FERC/DEIS-0184D), Application for a New License for the Existing 865.76 Megawatt Facility, Public Utility District No. 1 (PUD), Columbia River, Chelan County, WA | |
| 09/23/2005 | FRC | WA | Draft EIS | Info | Lewis River Hydroelectric Projects, Relicensing the Swift No. 1 (FERC No. 2111-018), Swift No. 2 (FERC No. 2213-011), Yale (FERC No. 2071-013), Merwin (FERC No. 935-053) Project, Application for Relicense, North Fork Lewis River, Cowlitz, Clark and Shamania Counties, WA | |
| 10/07/2005 | FHW | WA | Draft EIS | Info | South Park Bridge Project, Proposes to Rehabilitate or Replace the Historic South Park Ridge over the Duwamish Waterway at 14th/16 Avenue S, US Coast Guard Permit and U.S. Army COE Section 10 and 404 Permits, King County, WA | |
| 10/14/2005 | FTA | WA | Third Draft Supplement | Info | Central Link Light Rail Transit Project (Sound Transit) Construction and Operation of the North Link Light Rail Extension, from Downtown Seattle and Northgate, Updated Information on Refined Design Concepts, Funding, Right-of-Way and US Army COE Section 404 Permits, King County, WA | |
| 11/04/2005 | AFS | WA | Final EIS | Info | Fish Passage and Aquatic Habitat Restoration at Hemlock Dam, Implementation, Gifford Pinchot National Forest, Mount Adams District, Skamania County, WA | |
| 12/09/2005 | GSA | WA | Draft EIS | Info | Peace Arch Port of Entry Redevelopment Project, Improvements to Security, Safety and Functionality, Canadian Border in Blaine, Whatcom County, WA | |
| 12/23/2005 | AFS | WA | Draft EIS | Info | The Summit at Snoqualmie Master Development Plan (MPD), Proposal to Ensure Long-Term Economic Viability, Mt. Baker-Snoqualmie/Okanogan-Wenatchee National Forests, King County, WA | |
| 12/30/2005 | AFS | WA | Final Supplement | Info | Upper Charley Subwatershed Ecosystem Restoration Projects, Proposing to Amend the Umatilla National Forests Land and Resource Management Plan to Incorporate Management for Canada Lynx, Pomeroy Ranger District, Umatilla National Forest, Garfield County, WA | |
| 01/27/2006 | NOA | WA | Final EIS | Info | Washington State Forest Habitat Conservation Plan, Propose Issuance of Multiple Species Incidental Take Permit of 4(d) Rules, NPDES Permit, US Army COE Section 10 and 404 Permits, WA | |
| 01/27/2006 | FTA | WA | Draft EIS | Info | South Valley Corridor Project, Improvement to Existing Urban Transportation System, Light Rail Transit (LRT), Right-of-Way Grant, City of Liberty Lake, Spokane County, WA | |
| 03/03/2006 | FRC | WA | Draft EIS | Info | Priest Rapids Hydroelectric Project, FERC Project #2114-116 Relicensing Application for New License, Columbia River, Grant, Yakima, Kittitas, Douglas, Benton, and Chelan Counties, WA | |
| 03/17/2006 | AFS | WA | Final EIS | Info | Methow Transmission Project, Construction of New Transmission Line or Reconstruction an Existing Line, Okanogan and Wenatchee National Forests, Methow Valley Ranger District, Okanogan County, WA | |
| 03/24/2006 | AFS | WA | Final EIS | Info | Growden Dam Sherman Creek Restoration Project, and Forest Plan Amendment #28, Implementation, Colville National Forest, Ferry County, WA | |
| 03/31/2006 | FRC | WA | Final EIS | Info | Lewis River Hydroelectric Projects, Relicensing the Swift No. 1 (FERC No. 2111-018), Swift No. 2 (FERC No. 2213-011), Yale (FERC No. 2071-013), Merwin (FERC No. 935-053) Project, Application for Relicense, North Fork Lewis River, Cowlitz, Clark and Shamania Counties, WA | |
| 04/07/2006 | FTA | WA | Third Final Supplement | Info | Central Link Light Rail Transit Project (Sound Transit) Construction and Operation of the North Link Light Rail Extension, from Downtown Seattle and Northgate, Updated Information on Refined Design Concepts, Funding, Right-of-Way and US Army COE Section 404 Permits, King County, WA | |
| 04/14/2006 | BIA | WA | Draft EIS | Info | Cowlitz Indian Tribe Trust Acquisition and Casino Project, Take 151.87 Acres into Federal Trust and Issuing of Reservation Proclamation, and Approving the Gaming Development and Management Contract, Clack County, WA | |
| 04/14/2006 | FRC | WA | Draft EIS | Info | Baker River Hydroelectric Project, Application to Relicense the Upper Baker and Lower Baker Developments, Mt. Baker-Snoqualmie National Forest, Baker River, Whatcom and Skagit Counties, WA | |
| 04/28/2006 | AFS | WA | Draft EIS | Info | School Fire Salvage Recovery Project, Salvage Harvest Fire-Killed (dead) and Fire-Damaged (dying) Trees, Implementation, Pomeroy Ranger District, Umatilla National Forest, Columbia and Garfield Counties, WA | |
| 06/02/2006 | GSA | WA | Final EIS | Info | Peace Arch Port of Entry Redevelopment Project, Improvements to Security, Safety and Functionality, Canadian Border in Blaine, Whatcom County, WA | |
| 06/16/2006 | AFS | WA | Draft EIS | Info | Olympic National Forest, Beyond Prevention: Site-Specific Invasive Plant Treatment Project, Implementation, Clallam, Grays Harbor, Jefferson and Mason Counties, WA | |
| 06/16/2006 | NPS | WA | Draft EIS | Info | Olympic National Park General Management Plan, Implementation, Clallam, Grays Harbor, Jefferson and Mason Counties, WA | |
| 07/14/2006 | AFS | WA | Final EIS | Info | School Fire Salvage Recovery Project, Salvage Harvest Fire-Killed (dead) and Fire-Damaged (dying) Trees, Implementation, Pomeroy Ranger District, Umatilla National Forest, Columbia and Garfield Counties, WA | |
| 07/28/2006 | FHW | WA | Draft Supplement | Info | WA-99 Alaskan Way Viaduct and Seawall Replacement Project, Additional Information and Evaluation of Construction Plan, Provide Transportation Facility and Seawall with Improved Earthquake Resistence, US Army COE Section 10 and 404 Permits, Seattle, WA | |
| 08/11/2006 | FRC | WA | Final EIS | Info | Rocky Reach Hydroelectric Project, (FERC/DEIS-0184F), Application for a New License for the Existing 865.76 Megawatt Facility, Public Utility District No. 1 (PUD), Columbia River, Chelan County, WA | |
| 08/18/2006 | FHW | WA | Draft EIS | Info | WA-520 Bridge Replacement and HOV Project, Replace WA-520's Portage Bay and Evergreen Point Bridges and Improve Roadway between I-5 in Seattle and Bellevue Way or 108th Avenue Northeast on the Eastside, US Coast Guard Permit and US Army COE Section 10 and 404 Permits, King County, WA | |
| 08/25/2006 | AFS | WA | Draft EIS | Info | Buckhorn Access Project, To Utilize the Marias Creek Route to Construct and Reconstruct Roads, Funding, NPDES Permit and US Army COE Section 404 Permit, Okanogan and Wenatchee National Forests, Tonasket Ranger District, Okanogan County, WA | |
| 09/01/2006 | AFS | WA | Draft EIS | Info | Gifford-Pinchot National Forest and Columbia River Gorge National Scenic Area (Washington Portion) Site-Specific Invasive Plant Treatment Project, Implementation, Skamania, Cowlitz, Lewis, Clark, Klickitat Counties, WA | |
| 09/08/2006 | BIA | WA | Draft EIS | Info | Spokane Tribes Integrated Resource Management Plan, Implementation, Stevens County, WA | |
| 09/15/2006 | FRC | WA | Final EIS | Info | Baker River Hydroelectric Project, Application to Relicense the Upper Baker and Lower Baker Developments, Mt. Baker-Snoqualmie National Forest, Baker River, Whatcom and Skagit Counties, WA | |
| 10/13/2006 | NPS | WA | Final EIS | Info | Ebey's Landing National Historical Reserve General Management Plan, Implementation, Town of Coupeville, Island County, WA | |
| 10/20/2006 | FHW | WA | Draft EIS | Info | East Lake Sammamish Master Plan Trail, Design and Construct an Alternative Non-Motorized Transportation and Multi-Use Recreational Trail, Funding and US Army COE Section 404 Permit, King County, WA | |
| 11/09/2006 | AFS | WA | Draft EIS | Info | Natapoc Ridge Restoration Project, To Improve Forest Health and Sustainability, and Reduce Wildfire and Hazardous Fuels, Wenatchee River Ranger District, Okanogan-Wenatchee National Forest, Chelan County, WA | |
| 11/24/2006 | FRC | WA | Final EIS | Info | Priest Rapids Hydroelectric Project, FERC Project #2114-116 Relicensing Application for New License, Columbia River, Grant, Yakima, Kittitas, Douglas, Benton, and Chelan Counties, WA | |
| 12/01/2006 | FHW | WA | Final EIS | Info | WA-28 Eastside Corridor Project, Proposal to Improve WA-28 (Sunset Highway) Corridor from WA-2-97 (Ocdabashian Bridge) to 9th Street N.E. in East Wenatcheee, City of East Wenatchee, Douglas County, WA | |
| 12/01/2006 | FHW | WA | Second Final EIS (Tiering) | Info | WA-167 Freeway Project, Construction, from 161 (Meridan Street North) in the City of Puyallup to the WA-509 Freeway in the City of Tacoma, Funding, US Coast Guard, NPDES, US Army COE Section 10 and 404 Permits, Cities of Puyallup, Fife, Edgewood, Milton, and Tacoma, Pierce County, WA | |
| 12/15/2006 | SFW | WA | Draft EIS | Info | Hanford Reach National Mounument Comprehensive Conservation Plan, Management of Monument Resources, Programs and Visitors for the next 15 years, Adams, Benton. Franklin and Grant Counties, WA | |
| 02/02/2007 | AFS | WA | Final EIS | Info | Buckhorn Access Project, To Utilize the Marias Creek Route to Construct and Reconstruct Roads, Funding, NPDES Permit and US Army COE Section 404 Permit, Okanogan and Wenatchee National Forests, Tonasket Ranger District, Okanogan County, WA | |
| 03/09/2007 | BPA | WA | Draft EIS | Info | Port Angeles - Juan de Fuca Transmission Project, Construct a 550-Megawatt Direct Current Cable from Victoria, British Columbia, across the Strait of Juan de Fuca to Port Angeles, Presidential Permit, Clallam County, WA | |
| 03/09/2007 | AFS | WA | Draft Supplement | Info | School Fire Salvage Recovery Project, To Clarify Definitions of Live and Dead Trees, Implementation, Pomeroy Ranger District, Umatilla National Forest, Columbia and Garfield Counties, WA | |
| 03/30/2007 | HUD | WA | Draft EIS | Info | Westpark Redevelopment Master Plan, Redevelop of 82-acre Site to create a Mixed-Use, Mixed-Income Pedestrian Oriented Urban Community , Funding and US Army COE Section 10 Permit, City of Bremerton, Kitsap County, WA | |
| 05/04/2007 | BPA | WA | Draft EIS | Info | Chief Joseph Hatchery Program, Construction, Operation and Maintenance of a Chinook Salmon Hatchery Production Program, Confederated Tribes of the Colville Reservation (Colville Tribes), Okanogan River and Columbia River, Okanogan County, WA | |
| 05/11/2007 | AFS | WA | Final Supplement | Info | School Fire Salvage Recovery Project, To Clarify Definitions of Live and Dead Trees, Implementation, Pomeroy Ranger District, Umatilla National Forest, Columbia and Garfield Counties, WA | |
| 05/25/2007 | HUD | WA | Final EIS | Info | Westpark Redevelopment Master Plan, Redevelop of 82-acre Site to create a Mixed-Use, Mixed-Income Pedestrian Oriented Urban Community , Funding and US Army COE Section 10 Permit, City of Bremerton, Kitsap County, WA | |
| 06/01/2007 | AFS | WA | Draft EIS | Info | Tripod Fire Salvage Project, Proposal to Salvage Harvest Dead Trees and Fire-Injured Trees Expected to Die Within One Year, Methow Valley and Tonasket Ranger Districts, Okanogan and Wenatchee National Forests, Okanogan County, WA | |
| 06/22/2007 | AFS | WA | Final EIS | Info | Natapoc Ridge Restoration Project, To Improve Forest Health and Sustainability, and Reduce Wildfire and Hazardous Fuels, Wenatchee River Ranger District, Okanogan-Wenatchee National Forest, Chelan County, WA | |
| 07/06/2007 | AFS | WA | Final EIS | Info | White Pass Expansion Master Development Plan, Implementation, Naches Ranger District, Okanogan-Wenatchee National Forests and Cowlitz Valley Ranger District, Gifford Pinchot National Forest, Yakima and Lewis Counties, WA | |
| 07/27/2007 | AFS | WA | Draft EIS | Info | Old Curlew Ranger Station Facilities Disposal Project, Proposal to Sell 3-Acre Parcel Including Buildings, Republic Ranger District, Colville National Forest, South Side of Curlew, Ferry County, WA | |
| 09/28/2007 | AFS | WA | Final EIS | Info | Tripod Fire Salvage Project, Proposal to Salvage Harvest Dead Trees and Fire-Injured Trees Expected to Die Within One Year, Methow Valley and Tonasket Ranger Districts, Okanogan and Wenatchee National Forests, Okanogan County, WA | |
| 10/12/2007 | BPA | WA | Final EIS | Info | Port Angeles - Juan de Fuca Transmission Project, Construct a 550-Megawatt Direct Current Cable from Victoria, British Columbia, across the Strait of Juan de Fuca to Port Angeles, Presidential Permit, Clallam County, WA | |
| 01/11/2008 | FHW | WA | Final EIS | Info | Southeast Issaquah Bypass Construction, Updated Information, New North/South Arterial Connecting Front Street with I-90 at the Sunset Interchange, Right-of-Way Permit, NPDES Permit and COE Section 404 Permit, King County, WA | |
| 01/11/2008 | AFS | WA | Final EIS | Info | Old Curlew Ranger Station Facilities Disposal Project, Proposal to Sell 3-Acre Parcel Including Buildings, Republic Ranger District, Colville National Forest, South Side of Curlew, Ferry County, WA | |
| 01/18/2008 | NPS | WA | Draft EIS | Info | San Juan Island National Historical Park, General Management Plan, Implementation, WA | |
| 02/08/2008 | IBR | WA | Draft EIS | Info | Yakima River Basin Water Storage Feasibility Study, Create Additional Water Storage, Benton, Yakima, Kittitas Counties, WA | |
| 02/29/2008 | NOA | WA | Draft EIS | Info | PROGRAMMATIC - Incorporation of the Revised Washington Shoreline Management Act Guidelines into the Federally Approved Washington Coastal Management Program, Amendment No. 4 Approval, Coastal Counties in WA | |
| 03/14/2008 | NPS | WA | Final EIS | Info | Olympic National Park General Management Plan, Implementation, Clallam, Grays Harbor, Jefferson and Mason Counties, WA | |
| 03/28/2008 | BPA | WA | Draft EIS | Info | Lyle Falls Fish Passage Project, To Improve Fish Passage to Habitat in the Upper Part of the Watershed, Located on the Lower Klickitat River, Klickitat County, WA | |
| 05/02/2008 | AFS | WA | Final EIS | Info | Gifford-Pinchot National Forest and Columbia River Gorge National Scenic Area (Washington Portion) Site-Specific Invasive Plant Treatment Project, Implementation, Skamania, Cowlitz, Lewis, Clark, Klickitat Counties, WA | |
| 05/09/2008 | NOA | WA | Draft EIS | Info | Proposed Authorization of the Makah Indian Tribe's Request to Hunt Gray Whales in the Tribe's Usual and Accustomed Fishing Grounds off the Coast of Washington | |
| 05/30/2008 | BIA | WA | Final EIS | Info | Cowlitz Indian Tribe Trust Acquisition and Casino Project, Take 151.87 Acres into Federal Trust and Issuing of Reservation Proclamation, and Approving the Gaming Development and Management Contract, Clack County, WA | |
| 06/13/2008 | AFS | WA | Draft EIS | Info | Republic Ranger Station Excess Residence Sale Project, Proposes to Sell a 0.72 Acre Parcel of Land with a Residential Building , Republic Ranger District, Colville National Forest, Ferry County, WA | |
| 06/20/2008 | BIA | WA | Final EIS | Info | Spokane Tribes Integrated Resource Management Plan (IRMP) for the Spokane Indian Reservation, Implementation, Stevens County, WA | |
| 06/20/2008 | AFS | WA | Draft EIS | Info | Dosewallips Road Washout Project, To Reestablish Road Access to both Forest Service Road (FSR) 2610 and Dosewallips Road, Hood Canal Ranger District Olympic National Forest, Olympic National Park, Jefferson County, WA | |
| 07/18/2008 | NOA | WA | Final EIS | Info | ADOPTION - Fish Passage and Aquatic Habitat Restoration at Hemlock Dam, Implementation, Gifford Pinchot National Forest, Mount Adams District, Skamania County, WA | |
| 07/18/2008 | NPS | WA | Final EIS | Info | Mountain Lake Fisheries Management Plan for the North Cascades National Service Complex, Implementation, North Cascades National Park, Whatcom, Skagit and Chelan Counties, WA | |
| 08/15/2008 | SFW | WA | Final EIS | Info | Hanford Reach National Monument Comprehensive Conservation Plan, Management of Monument Resources, Programs and Visitors for the Next 15 Years, Adams, Benton. Franklin and Grant Counties, WA | |
| 08/29/2008 | FHW | WA | Final EIS | Info | Interstate 90 Snoqualmie Pass East Project, Proposes to Improve a 15-mile Portion of I-90 from Milepost 55.10 in Hyak to Milepost 70.3 New Easton, Funding, US Army COE Section 404 Permit and NPDES Permit, Kittitas County, WA | |
| 09/12/2008 | USN | WA | Draft EIS | Info | Naval Sea Systems Command (NAVSEA). Naval Undersea Warfare Center (NUWC), Keyport Complex Extension, Propose to Extend the Operational Areas, Three Distinct Range Sites: Keyport Range Site; Dabob Bay Range Complex (DBRC) Site, Quinault Underwater Tracking Range Site, Gray Harbor, Jefferson, Kitsap and Mason Counties, WA | |
| 10/31/2008 | NPS | WA | Final EIS | Info | San Juan Island National Historical Park, General Management Plan, Implementation, WA | |
| 11/21/2008 | AFS | WA | Final EIS | Info | The Summit at Snoqualmie Master Development Plan (MPD), Proposal to Ensure Long-Term Economic Viability, Mt. Baker-Snoqualmie/Okanogan-Wenatchee National Forests, King and Kittitas Counties, WA | |
| 12/05/2008 | BPA | WA | Final EIS | Info | Lyle Falls Fish Passage Project, To Improve Fish Passage to Habitat in the Upper Part of the Watershed, Located on the Lower Klickitat River, Klickitat County, WA | |
| 12/12/2008 | FTA | WA | Draft EIS | Info | East Link Rail Transit Project, Proposes to Construct and Operate an Extension of the Light Rail System from downtown Seattle to Mercer Island, Bellevue, and Redmond via Interstate 90, Funding and US Army COE Section 404 and 10 Permits, Seattle, WA | |
| 12/29/2008 | USN | WA | Draft EIS | Info | Naval Base Kitsap - Bangor, Construct and Operate a Swimmer Interdiction Security System (SISS), Silverdatle Kitsap County, WA | |
| 12/29/2008 | IBR | WA | Final EIS | Info | Yakima River Basin Water Storage Feasibility Study, Create Additional Water Storage, Benton, Yakima, Kittitas Counties, WA | |
| 01/23/2009 | AFS | WA | Final EIS | Info | Republic Ranger Station Excess Residence Sale Project, Proposes to Sell a 0.72 Acre Parcel of Land with a Residential Building , Republic Ranger District, Colville National Forest, Ferry County, WA | |
| 04/24/2009 | COE | WA | Draft Supplement | Info | Commencement Bay "Reauthorization" of Dredged Material Management Program Disposal Site, Implementation, Central Puget Sound, Tacoma, WA | |
| 05/29/2009 | NOA | WA | Draft EIS | Info | PROGRAMMATIC - Lower Duwamish River Natural Resource Damage Assessment (NRDA) Restoration Plan, Implementation, King County, WA | |
| 06/05/2009 | FHW | WA | Draft EIS | Info | WA-502 Corridor Widening Project, Proposes Improvements to Five Miles of WA-502 (NE-219th Street) between NE 15th Avenue and NE 102nd Avenue, Funding, Clark County, WA | |
| 08/17/2009 | ARD | WA | Final EIS | Info | ADOPTION - White Pass Expansion Master Development Plan, Implementation, Naches Ranger District, Okanogan-Wenatchee National Forests and Cowlitz Valley Ranger District, Gifford Pinchot National Forest, Yakima and Lewis Counties, WA | |
| 08/17/2009 | COE | WA | Final Supplement | Info | Commencement Bay "Reauthorization" of Dredged Material Management Program Disposal Site, Implementation, Central Puget Sound, Tacoma, WA | |
| 08/17/2009 | BLM | WA | Draft EIS | Info | Blackfoot Bridge Mine Project, Developing Three Mine Pits, Haul Roads, Water Management Structures, and Overburden Disposal Areas, Implementation, Caribou County, ID | |
| 09/11/2009 | USN | WA | Final EIS | Info | Naval Base Kitsap - Bangor, Construct and Operate a Swimmer Interdiction Security System (SISS), Silverdale Kitsap County, WA | |
| 09/11/2009 | USA | WA | Draft EIS | Info | Fort Lewis Army Growth and Force Structures Realignment, Implementation, Fort Lewis and Yakima Training Center, Kittitas, Pierce, Thurston and Yakima Counties, WA | |
| 10/30/2009 | DOE | WA | Draft EIS | Info | Hanford Site Tank Closure and Waste Management Project, Implementation, Richland, Benton County, WA | |
| 11/06/2009 | FRBSF | WA | Draft EIS | Info | Federal Reserve Bank of San Francisco, Propose to sell the Property at 1015 Second Avenue that Eligible for Listing on the National Register of Historic Places, located in Seattle, WA | |
![[logo] US EPA](http://www.epa.gov/epafiles/images/logo_epaseal.gif)