Jump to main content.


EIS Data


TitleKeystone XL Project
EIS Number20140032State00
Document TypeFinal SupplementLead AgencyDOS
Federal Register Date02/07/2014Contact NameMary D. Hassell
EIS Comment Due/ Review Period Date03/10/2014Contact Phone202-736-7428
Amended Notice Date
Amended Notice
Supplemental Information 
Website   
Comment Letter Date  Rating, if Draft EIS
EIS Document(s):
EIS Document: 0.0 Volume I Front Cover, Title Page, and Table of Contents.pdf
EIS Document: 1.0 Introduction.pdf
EIS Document: 1.2 Overview of Proposed Project.pdf
EIS Document: 1.3 Purpose and Need.pdf
EIS Document: 1.4 Market Analysis.pdf
EIS Document: 1.7 Environmental Review of Canadian Portion.pdf
EIS Document: 1.8 Preparation of Publication.pdf
EIS Document: 1.9 Permits, Approvals, and Regulatory Requirements.pdf
EIS Document: 2.0 Description of the Proposed Project and Alternatives.pdf
EIS Document: 2.1 Overview of the Proposed Project.pdf
EIS Document: 2.2 Description of Reasonable Alternatives.pdf
EIS Document: 0.0 Volume II Front Cover, Title Page, and Table of Contents.pdf
EIS Document: 3.0 Affected Environment.pdf
EIS Document: 3.1 Geology.pdf
EIS Document: 3.2 Soils.pdf
EIS Document: 3.3 Water Resources.pdf
EIS Document: 3.4 Wetlands.pdf
EIS Document: 3.5 Terrestrial Vegetation.pdf
EIS Document: 3.6 Wildlife.pdf
EIS Document: 3.7 Fisheries.pdf
EIS Document: 3.8 Threatened and Endangered Species.pdf
EIS Document: 3.9 Land Use, Recreation, and Visual Resources.pdf
EIS Document: 3.10 Socioeconomics.pdf
EIS Document: 3.11 Cultural Resources.pdf
EIS Document: 3.12 Air Quality and Noise.pdf
EIS Document: 3.13 Potential Releases.pdf
EIS Document: 0.0 Volume III Front Cover, Title Page, and Table of Contents.pdf
EIS Document: 4.0 Environmental Consequences.pdf
EIS Document: 4.1 Geology.pdf
EIS Document: 4.2 Soils.pdf
EIS Document: 4.3 Water Resources.pdf
EIS Document: 4.4 Wetlands.pdf
EIS Document: 4.5 Terrestrial Vegetation.pdf
EIS Document: 4.6 Wildlife.pdf
EIS Document: 4.7 Fisheries.pdf
EIS Document: 4.8 Threatened and Endangered Species.pdf
EIS Document: 4.9 Land Use, Recreation, and Visual Resources.pdf
EIS Document: 4.10 Socioeconomics.pdf
EIS Document: 4.11 Cultural Resources.pdf
EIS Document: 4.12 Air Quality and Noise.pdf
EIS Document: 4.13 Potential Releases.pdf
EIS Document: 4.14 Greenhouse Gases and Climate Change.pdf
EIS Document: 4.15 Cumulative Effects Assessment and Extraterritorial Concerns.pdf
EIS Document: 4.16 Summary of Impacts.pdf
EIS Document: 0.0 Volume IV Front Cover, Title Page, and Table of Contents.pdf
EIS Document: 5.0 Alternatives.pdf
EIS Document: 5.1 No Action Alternative.pdf
EIS Document: 5.2 Route Alternatives.pdf
EIS Document: 5.3 Comparison of Alternatives.pdf
EIS Document: 6.0 List of Preparers.pdf
EIS Document: 7.0 Distribution List.pdf
EIS Document: 8.0 Index.pdf
EIS Document: 0.0 Volume V Front Cover and Title Page.pdf
EIS Document: Volume V Comments and Responses Part 1.pdf
EIS Document: 0.0 Volume VII Front Cover, Title Page, and Table of Contents.pdf
EIS Document: Appendix A Governor Approval of the Keystone XL Project in Nebraska.pdf
EIS Document: Appendix B Potential Releases and Pipeline Safety.pdf
EIS Document: Appendix C Supplemental Information to Market Analysis.pdf
EIS Document: Appendix D Waterbody Crossing Tables and Required Crossing Criteria.pdf
EIS Document: Appendix E Programmatic Agreement and Record of Consultation.pdf
EIS Document: Appendix F Scoping Summary Report.pdf
EIS Document: Appendix G Construction Mitigation and Reclamation Plan.pdf
EIS Document: 0.0 Volume VIII Front Cover, Title Page, and Table of Contents.pdf
EIS Document: Appendix H1-H2 Errata and Biological Assessment.pdf
EIS Document: Appendix H3-H4 Letters and Biological Opinion.pdf
EIS Document: 0.0 Volume IX Front Cover, Title Page, and Table of Contents.pdf
EIS Document: Appendix I Spill Prevention Control and Countermeasure Plan and ERP.pdf
EIS Document: Appendix J Big Bend to Witten 230-kV Transmission Project Routing Report.pdf
EIS Document: Appendix K Historical Pipeline Incident Analysis.pdf
EIS Document: Appendix L Oil and Gas Wells within 1320 ft of Proposed Right-of-Way.pdf
EIS Document: 0.0 Volume X Front Cover, Title Page, and Table of Contents.pdf
EIS Document: Appendix N1 Supplemental Information for Compliance with MEPA.pdf
EIS Document: Appendix N2 Figures.pdf
EIS Document: Appendix N3 Attachments 1-3.pdf
EIS Document: Appendix O Socioeconomics.pdf
EIS Document: Appendix P Risk Assessment.pdf
EIS Document: 0.0 Volume XI Front Cover, Title Page, and Table of Contents.pdf
EIS Document: Appendix Q Crude Oil Material Safety Data Sheets.pdf
EIS Document: Appendix R Construction_Reclamation Plans and Documentation.pdf
EIS Document: Appendix S Pipeline Temperature Effects Study.pdf
EIS Document: Appendix T Oil Spill Modeling.pdf
EIS Document: Appendix U Lifecycle Greenhouse Gas Emissions.pdf
EIS Document: Appendix V Literature Review.pdf
EIS Document: Appendix W Past Present and Future Project Descriptions.pdf
EIS Document: Appendix X Canadian Env Assessment Act and KXL Review.pdf
EIS Document: Appendix Y Estimated Criteria Pollutants Noise and GHG.pdf
EIS Document: Appendix Z Compiled Mitigation Measures.pdf
EIS Document: 1.1 Background.pdf
EIS Document: 1.6 Tribal and SHPO Consultation.pdf
EIS Document: Appendix M Soil Summary for Montana, South Dakota, and Nebraska.pdf
EIS Document: 1.5 Agency Participation.pdf



Local Navigation



Jump to main content.