Project Title: FINDLAY TOWNSHIP MUNICIPAL AUTHORITY - PA
Grant Information
| XP - 97393301-2 |
 |  |  |
| EPA R3 | R03 - Region 3 |
| Water Protection Division 3WP00 | |
| 66.202 | Water |
|
|
 |
| Findlay Township Municipal Authority |
| Municipal |
| PA | 18 |
 | 064877371 |
| |  |
|
| 08/01/2011 | $458,432 |
| 07/01/2010 | 05/31/2012 |
Project Title & Description
FINDLAY TOWNSHIP MUNICIPAL AUTHORITY - PA
. This project entails the construction of a Water Pressure Booster Station ("Station") to be connected to the Findlay Township Municipal Authority ("FTMA") water system. The proposed Station will provide the FTMA water system with adequate water pressure, thus eliminating a potential public health hazard. The proposed Station work includes the installation of two 240 gpm pumps and two 2500 gpm pumps boosted by 45 psi. The objective of the proposed project is to improve the overall health and welfare of the service area by providing adequate water pressure.
Contact Information
| Project Officer | Ramon Albizu | 215-814-5779 |
| Grant Specialist | Baseemah El-Amin | 215-814-5371 |
|