EIS Documents Archive | Region 10 | US EPA

Jump to main content.


EIS Documents Archive

For your reference, below is a list of Environmental Impact Statements for which the public comment period has recently expired. You may still be able to get information about these projects by calling the person listed, or if the Internet link (if available) is still active.

ARCHIVE
ALASKA
IDAHO
OREGON
WASHINGTON

ALASKA
*
    Draft EIS - Courverden Timber Sales
    Tongass National Forest, National Forest Service, Juneau Ranger District, Chilkat Peninsula, AK
    Comment Period Ended: March 29, 2004
    Contact: Dave Carr, (907) 586-8800
    Draft Supplemental EIS - Kensington Gold Project: Proposed Modifications of the 1998 Approved Plan Operation
    Tongass National Forest, Juneau, AK
    Comment Period Ended: April 7, 2004
    Contact: Steve Hohensee, (907) 586-8800

    Revision of FR Notice Pub. on 1/23/2004: Comment Period Ending 3/08/2004 has been Extended to 4/7/2004.--
    Draft EIS - Commercially Guided Helicopter Skiing on the Kenai Peninsula
    Chugach National Forest, Kenai Peninsula, AK
    Comment Period Ended: May 10, 2004
    Contact: Teresa Paquet, (907) 754-2314
    *Revision of FR Notice Published on 1/23/2004: CEQ Comment Period Ending 3/23/2004 has been Extended to 5/10/2004.--
    Draft EIS - Crooked River National Grassland Vegetation Management/Grazing, Vegetation Treatments and Grazing Disposition, Ochoco National Forest, Jefferson County, OR
    Comment Period Ended: May 24, 2004
    Contact: Kristin Bail (541) 416-6648.
    This document is available on the Internet at: http://www.fs.fed.us/r6/centraloregon/projects/units/crooked
    Draft EIS - Resurrection Creek Stream and Riparian Restoration Project,
    Proposes to Accelerate the Recovery of Riparian Areas, Fish and Wildlife Habitat,
    Chugach National Forest, Seward Ranger District, Kenai Peninsula Borough, AK

    Comment Period Ended: May 24, 2004
    Contact: Dave Blanchet (907) 743-9538
    Final EIS - Army Transformation of the 172rd Infantry Brigade (Separate)to a Stryker Brigade Combat Team (SBCT), Propose Location Forts Wainwright and Richardson, AK
    Comment Period Ended: May 24, 2004
    Contact: Kevin Gardner (907) 384-3331
    This document is available on the Internet at: http://www.cemml.colostate.edu/AlaskaEIS/-
    Draft EIS - Draft Revised Comprehensive Conservation Plan
    Alaska Peninsula and Becharof National Wildlife Refuges, AK
    Comment Period Ended: May 31, 2004
    Contact: Peter Wikoff, (907) 786-3837
    This document is available on the internet at: http://www.r7.fws.gov/planning
    Final EIS - Alaska Groundfish Fisheries, New Information concerning the Ecosystem and a Preferred Alternative, Fishery Management Plans for the Groundfish Fishery of the Gulf of Alaska and the Groundfish of the Bering Sea and Aleutian Islands Area, North Pacific Fishery Management Council, AK
    Comment Period Ended: July 6, 2004,
    Contact: James W. Balsiger (907) 586-7221. This document is available on the internet at http://www.fakr.noaa.gov.
    Draft EIS - Northeast National Petroleum Reserve Alaska Amended Integrated Activity Plan, to Amend 1998 Northeast Petroleum Reserve, to Consider Opening Portions of the BLM-Administrated Lands, North Slope Borough, AK
    Comment Period Ended: August 2, 2004
    Contact: Susan Childs (907) 271-1985
    Draft EIS - Northeast National Petroleum Reserve Alaska Amended Integrated Activity Plan, to Amend 1998 Northeast Petroleum Reserve, to Consider Opening Portions of the BLM-Administrated Lands, North Slope Borough, AK
    Comment Period Ended: August 2, 2004
    Contact: Susan Childs (907) 271-1985.
    Draft EIS - Unalaska Navigation Improvements Project, Construction of Harbor on Amaknak Island in Aleutian Island Chain, Locally known as ``Little South America, Integrated Feasibility Report, Aleutian Island, AK
    Comment Period Ended: August 9, 2004
    Contact: Guy McConnell (907) 753-2614
    Final EIS - Glacier Bay National Park and Preserve, Falls Creek Hydroelectric Project (FERC. NO. 11659) and land Exchange Project, Issuance of License and Land Exchange, Kahtaheena River (Falls Creek) near Gustavus in Southeastern, AK.
    Comment Period Ended: August 9, 2004
    Contact: Robert Easton (202) 502-6045
    Final EIS - Threemile Timber Sale, Implementation, Petersburg Ranger District, Tongass National Forest, AK.
    Comment Period Ended: August 9, 2004.
    Contact: Jim Brainard (907) 772-3871
    Final EIS - Gravina Access Project, Transportation Improvements between Revillagigedo Island and Gravina Island, Funding, Endangered Species Act 7, NPDES and US Army COE Section 404 Permits Issuance, Ketchikan Gateway Borough, AK.
    Comment Period Ended: September 7, 2004
    Contact: Mark Dalton (907) 644-2000.
    This document is available on the Internet at:
    http://www.gravina-access.com/
    Final EIS - Gravina Island Timber Sale, Implementation, Timber Harvest and Related Activities, Ketchikan-Misty Fiords Ranger District, Tongass National Forest, AK.
    Comment Period Ended: September 20, 2004.
    Contact: Rob Reeck (907) 228-4114.
    Final EIS - Bering Sea and Aleutian Islands King and Tanner Crab Fisheries and Fishery Management Plan,
    Implementation, United States Exclusive Economic Zone (EEZ) off Alaska

    Comment Period Ended: October 4, 2004
    Contact: Gretchen Harrington (907) 586-7228
    Final EIS - Alpine Satellite Development Plan, Construction and Operation of Five Oil Production Pads, Associated Well, Roads, Airstrips, Pipelines and Powerlines, Authorization and Permits Issuance, Northeast corner of the National Petroleum Reserve--Alaska, Colville River Delta, North Slope Borough, AK
    Comment Period Ended: October 4, 2004
    Contact: Jim Ducker (907) 271-3130
    This document is available on the Internet at:
    http://www.ak.blm.gov"
    Final EIS - Akutan Harbor Navigation Improvements Project, Construction and Implementation, Bering Sea, City
    of City of Akutan, AK.

    Comment Period Ended: October 12, 2004
    Contact: Wayne M. Crayton (907) 753-2672
    Draft EIS - Pribilof Islands Setting for the Annual Subsistence Harvest of Northern Fur Seals, To Determine and Publish the Take Ranges, Pribilof Islands, AK
    Comment Period Ended: October 19, 2004
    Contact: Kaja Brix (907) 586-7824
    This document is available on the Internet at: http://www.fakr.noaa.gov
    Final EIS - Commercially Guided Helicopter Skiing on the Kenai Peninsula, Issuance of a Five Year Special Use
    Permit, Chugach National Forest, Glacier and Seward Ranger Districts, Kenai Peninsula, AK.

    Comment Period Ended: October 25, 2004
    Contact: Theresa Paquet (907) 783-3242
    Draft EIS - Programmatic--Missile Defense Agency, To Incrementally Develop, Test, Deploy and Plan for Decommissioning of the Ballistic Missile Defense System (BMDS)
    Comment Period Ended: November 17, 2004
    Contact: Martin Duke (703) 697-4248
    Final EIS - Unalaska Navigation Improvements Project, Construction of Harbor on Amaknak Island in Aleutian Island Chain, Locally known as "Little South America," Integrated Feasibility Report, Aleutian Island, AK
    Comment Period Ended: November 29, 2004
    Contact: Guy McConnell (907) 753-2614
    Draft EIS - Programmatic--Wind Energy Development Program, To Address Stewardship, Conservation and Resource Use on BLM-Administered Lands, Right-of-Way Grants, Western United States.
    Comment Period Ended: December 9, 2004
    Contact: Lee Otteni (505) 599-8911
    Final EIS - Resurrection Creek Stream and Riparian Restoration Project, Proposes to Accelerate the Recovery of Riparian Areas, Fish and Wildlife Habitat, Chugach National Forest, Seward Ranger District, Kenai Peninsula Borough, AK.
    Comment Period Ended: December 13, 2004
    Contact: Debora Cooper (907) 224-3374
    Draft EIS - Battle Area Complex (BAX) and a Combined Arms Collective Training Facility (CACTF) Construction and Operation, U.S. Army Training Lands in Alaska.
    Comment Period Ended: December 20, 2004
    Contact: Kevin Gardner (907) 384-3331
    Draft EIS - Battle Area Complex (BAX) and a Combined Arms Collective Training Facility (CACTF) Construction and Operation, U.S. Army Training Lands in Alaska.
    Comment Period Ended: January 10, 2005.
    Contact: Kevin Gardner (907) 384-3331
    Revision of FR Notice Published on 11/05/04: CEQ Comment Period Ending 12/20/2004 has been Extended to 01/10/2005.
    Draft EIS - Kodiak National Wildlife Refuges (AK), Draft Revised Comprehensive Conservation Plan, Implementation.
    Comment Period Ended: January 21, 2005
    Contact: Mikel Haase (907) 786-3402
    Final Supplement EIS - Kensington Gold Project, Proposed Modifications of the 1998 Approved Plan Operation, NPDES, ESA and U.S. COE Section 10 and 404 Permits, Tongass National Forest, City of Juneau, AK.
    Comment Period Ended: January 24, 2005
    Contact: Jeff Defreest (907) 790-7407
    Final EIS - Programmatic EIS -Emergency Watershed Protection Program, Improvements and Expansion, To Preserve Life and Property Threatened by Disaster-Caused Erosion and Flooding, U.S. 50 States and Territories except Coastal Area
    Comment Period Ended: January 31, 2005
    Contact: Victor Cole (202) 690-4575
    Revision of FR Notice published on 12/30/2004: CEQ wait period ending 1/30/2005 corrected to 1/31/2005.
    Final EIS - Shoreline Outfitter/Guide Plan, Commercial Permits Issuance for Shoreline-Based Activities on National Forest System Lands, Admiralty Island National Monument, Hoonah, Sitka and Juneau Ranger Districts, Tongass National Forest, AK
    Comment Period Ends: February 28, 2005
    Contact: Bill Tremblay (907) 772-5877
    Final EIS - Northeast National Petroleum Reserve Alaska Amended Integrated Activity Plan, To Amend 1998 Northeast Petroleum Reserve, To Consider Opening Portions of the BLM-Administrated Lands, North Slope Borough, AK
    Comment Period Ends: February 28, 2005
    Contact: Susan Childs (907) 271-1985
    Draft EIS - Tuxekan Island Timber Sale(s) Project, Harvesting Timber, Coast Guard Bridge Permit and U.S. Army COE Section 10 and 404 Permits, Tongass National Forest, Thorne Bay Ranger District, Thorne Bay, AK
    Comment Period Ended: March 7, 2005
    Contact: Forrest Cole (907) 228-6200
    Revision of FR Notice Published on 12/10/2004: Correction to Contact Person Telephone Number.
    Revision of FR Notice published on 12/10/2004: CEQ Comment Period Ending 01/24/2005 has been reestablished to 3/7/2005. Due to submission of replacement copies of appendix B and C.
    Final EIS - Essential Fish Habitat Identification and Conservation, Implementation, North Pacific Fishery Management Council, Magnuson-Stevens Fishery Conservation and Management Act, AK.
    Comment Period Ended: June 6, 2005
    Contact: James W. Balsiger 907-586-7636
    Draft EIS - Juneau International Airport, Proposed Development Activities to Enhance Operations Safety, Facilitate Aircraft Alignment, US Army COE Section 404 Permit, City and Borough of Juneau, AK.
    Comment Period Ends: June 30, 2005
    Contact: Patti Sullivan 907-271-5454
    Revision of FR Notice Published on 05/06/2005: Correction to Review Period Ending 06/20/2005 to 06/30/2005.
    Draft EIS - Denali National Park and Preserve Revised Draft Backcountry Management Plan, General Management Plan Amendment, Implementation, AK.
    Comment Period Ends: June 30, 2005
    Contact: Anne D. Castelina (202) 208-6381
    Final EIS - Programmatic--Wind Energy Development Program, To Address Stewardship, Conservation and Resource Use on BLM-Administered Lands, Right-of-Way Grants, Western United States.
    Wait Period Ends: July 25, 2005
    Contact: Ray Brady 202-452-7773
    Draft EIS - East Alaska Draft Resource Management Plan (RMP), Provide a Single Comprehensive Land Use Plan, Glennallen Field Office District, AK.
    Comment Period Ends: July 28, 2005
    Contact: Bruce Rogers (907) 822-3217
    Draft EIS - Programmatic--Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative Technology Revisions, To Increase the Oil Removal Capability, U.S. Exclusive Economic Zone (EEZ), United States, Alaska, Guam, Puerto Rico and other U.S. Territories.
    Comment Period Ends: August 1, 2005
    Contact: Brad McKitrick (202) 267-0995
    Revision of FR Notice Published on 05/27/2005: Correction to CEQ Comment Period Ending 07/26/2005 has been Extended to 08/01/2005.
    Draft EIS - Scott Peak Project Area, Harvesting Timber and Development of Road Management, Tongrass National Forest, Petersburg Ranger District, Northeat of Kupreanof Island, AK.
    Comment Period Ends: August 15, 2005
    Contact: Patty Grantham 907-772-3871
    Final EIS - Pribilof Islands Setting for the Annual Subsistence Harvest of Northern Fur Seals, To Determine and Publish the Take Ranges, Pribilof Islands, AK.
    Wait Period Ends: August 22, 2005
    Contact: James W. Balsiger 301-713-3318
    Final EIS - Couverden Timer Sales, Harvesting Timber, NPDES, Coast Guard Bridge Permit, U.S. Army COE Section 10 and 404 Permits, Tongass National Forest, Juneau Ranger District, Chilkat Peninsula, AK.
    Wait Period Ends: September 12, 2005
    Contact: Dave Carr 907-790-7402
    Draft EIS - Office of Ocean and Coastal Resource Management Approval of Amendments to the State of Alaska's Coastal Management Program, Implementation, Funding, AK.
    Comment Period Ends: November 7, 2005
    Contact: Helen C.P. Bass 301-713-3155 Ext. 175
    Draft EIS - Denali National Park and Preserve, Draft South Denali Implementation Plan, Matanuska-Susitna Borough, AK.
    Comment Period Ends: November 15, 2005
    Contact: Glen Yankus 907-644-3535
    Final EIS - Alaska Peninsula and Becharof National Wildlife Refuges, Revised Comprehensive Conservation Plan, Implementation, AK.
    Wait Period Ends: November 28, 2005
    Contact: Peter Wikoff 907-786-3837
    Final Supplemental EIS - Emerald Bay Timber Sale, Implementation, Additional Information on the Potential Effects of the Project Alternatives, Ketchikan-Misty Fiords Ranger District, Tongass National Forest, AK.
    Wait Period Ends: December 19, 2005
    Contact: Rob Reeck 907-228-4114
    Draft EIS - Delong Mountain Terminal Project, Proposed Construction and Operation of Navigation Improvements, Northwest Arctic Borough, AK.
    Comment Period Ends: December 27, 2005
    Contact: Guy McConnell 907-753-2614
    Final EIS - Amendments to the Alaska Coastal Management Program, Approval, Implementation and Funding, U.S. Army COE 404 Permit, AK.
    Wait Period Ends: December 27, 2005
    Contact: Helen C.P. Bass 301-713-3155, Ext. 175
    Draft EIS - Ring of Fire Resource Management Plan, Implementation, Alaska Peninsula, Kodiak Island and Aleutain Islands, AK.
    Comment Period Ends: December 29, 2005
    Contact: Robert Lloyd 907-267-1214
    Draft EIS - Programmatic--Vegetation Treatments Using Herbicides on Bureau of Land Management Public Lands in 17 Westerns, including Alaska.
    Comment Period Ends: February 10, 2006
    Contact: Brian Amme 775-861-6645
    Revision of FR Notice Published 11/10/2005: Comment Period Ending 1/9/2006 has been Extended to 2/10/2006.
    Draft EIS - Cordova Oil Spill Response Facility, Construct an Oil Spill Response Facility at Shepard Point, NPDES Permit and U.S. Army COE Section 10 and 404 Permits, Cordova, AK.
    Comment Period Ends: February 10, 2006
    Contact: Kristin K'eit 907-586-7423
    Final EIS - Scott Peak Project Area, Harvesting Timber and Development of Road Management, Tongass National Forest, Petersburg Ranger District, Northeast of Kupreanof Island, AK.
    Wait Period Ends: February 13, 2006
    Contact: Linda Slaght 907-772-3871
    Revision to FR Notice published on 1/6/2006: The above EIS should have appeared in the FR on 1/6/2006. The Wait Period is calculated from the FR on 1/6/2006.
    Final EIS - Denali National Park and Preserve Revised Final Backcountry Management Plan, General Management Plan Amendment, Implementation, AK.
    Wait Period Ends: February 21, 2006
    Contact: Adrienne Lindholm 907-644-3613
    Final EIS - Juneau Access Transportation Project, Improvements in the Lynn Canal/Taiya Inlet Corridor between Juneau and Haines/Skagway, Special-Use-Permit and COE Section 10 and 404 Permits, Tongass National Forest, Klondike Gold Rush National Historic Park, Haines States Forest, City and Borough of Juneau, Haines Borough, Cities Haines and Skagway, AK.
    Wait Period Ends: March 13, 2006
    Contact: Tim A. Haugh 907-586-7430
    Draft EIS - Whistle Stop Project, Provide Access to Backcountry Recreation Area on National Forest, System (NFS) Lands, on the Kenai Peninsula between Portage and Moose Pass, Chugach National Forest, Kenai Peninsula Borough, AK.
    Comment Period Ends: March 13, 2006
    Contact: Adam McClory 907-754-2352
    Draft EIS - Kuiu Timber Sale Area, Proposes to Harvest Timber and Build Associated Temporary Roads, U.S. Army COE Section 10 and 404 Permits, North Kuiu Island, Petersburg Ranger District, Tongass National Forest, AK.
    Comment Period Ends: March 20, 2006
    Contact: Kris Rutledge 907-772-5905
    Final EIS - South Extension of the Coastal Trail Project, Extending the existing Tony Knowles Coastal Trail from Kincaid Park through the Project Area to the Potter Weigh Station, COE Section 10 and 404 Permit, Municipality of Anchorage, Anchorage, AK.
    Wait Period Ends: March 27, 2006
    Contact: Tim A. Haugh 907-586-7418
    Draft Supplement EIS - U.S. Army Alaska Battle Area Complex (BAX) and a Combined Arms Collective Training Facility (CACTF), Construction and Operation, Additional Information on Site Alternative, within U.S. Army Training Lands in Alaska.
    Comment Period Ends: May 1, 2006
    Contact: Kevin Gardner 907-384-3331
    Final EIS - Denali National Park and Preserve, Draft South Denali Implementation Plan, Matanuska-Susitna Borough, AK.
    Wait Period Ends: June 5, 2006
    Contact: Miriam Valentine 907-733-9102
    Draft EIS - Kenai Winter Access Project, Develop a Winter Access Management Plan for 2006/2007 Winter Season, Implementation, Seward Ranger District, Chugach National Forest, Located on the Kenai Peninsula in Southcentral, AK.
    Comment Period Ends: June 5, 2006
    Contact: Sharon Randall 907-743-9497
.

IDAHO
*
    Final EIS - Idaho Spent Fuel Facility: Construction, Operation and Decommissioning, License Application
    Idaho National Engineering and Environmental Laboratory (INEEL), Butte County, ID
    Comment Period Ended: April 5, 2004
    Contact: Mathew Blevins, (301) 415-7684
    This document is available on the Internet at
    http://www.nrc.gov/reading-rm.html--
    Draft EIS - Chips Ahoy Project (Proposes Vegetation, Wildlife Habitat, Recreation and Aquatic Improvement Treatments)
    Idaho Panhandle National Forests, Priest Lake Ranger District, Bonner County, ID and Pend Orielle County, WA
    Comment Period Ended: April 12, 2004
    Contact: David DelSordo, (208) 443-6809
    This document is available on the Internet at: http://www.fs.fed.us/ipnf/eco/manage/nepa/index.html.
    Final EIS - Stimson Access Project - To Access their Private Property through National Forest System Lands
    Idaho Panhandle National Forests, Priest Lake Ranger District, Pend Oreille County, WA
    Comment Period Ended: April 26, 2004
    Contact: Gianna Vaccaro, (208) 265-6625
    This document is available on the Internet at: http://www.fs.fed.us/ipnf/eco/manage/nepa/index.html--.
    Draft EIS - South Fork Wildfire Salvage Project: Harvesting Fire-Killed and Imminently Dead Trees
    Cascade Ranger District, Boise National Forest, Valley County, ID
    Comment Period Ended: May 3, 2004
    Contact: Keith Dimmett (208) 382-7430--
    Draft EIS - South Fork Wildfire Salvage Project: Harvesting Fire-Killed and Imminently Dead Trees
    Cascade Ranger District, Boise National Forest, Valley County, ID
    Comment Period Ended: May 3, 2004
    Contact: Keith Dimmett (208) 382-7430--
    Draft EIS - North Sheep Allotments-- Sheep and Goat Allotment Management Plans,
    To Authorize Continued Sheep Grazing for Fisher Creek, Smiley Creek, North Fork-Boulder and Baker Creek Sheep and Goat Grazing Allotments, Sawtooth National Forest, Ketchum Ranger District, Sawtooth National Recreation Area, Blaine and Custer Counties, ID
    Comment Period Ended: May 10, 2004
    Contact: Mike O'Farrell (208) 622-0082--
    Draft EIS - Clearwater National Forest, Proposes to Approve Plans-of-Operation for Small-Scale Suction Dredging in Lolo Creek and Moose Creek, Clearwater National Forest, North Fork Ranger District, Clearwater and Idaho Counties, ID
    Comment Period Ended: May 17, 2004
    Contact: Vern Bretz (208) 476-4541--
    Draft EIS - Pacific Coast Groundfish Fishery Management Plan, Amendment 16-3 Adopts Rebuild Plans for Bocaccio, Cowcod, Widow Rockfish and Yelloweye Rockfish, Maximum Sustainable Yield (MSY), Implementation, WA, OR, ID and CA
    Comment Period Ended: May 24, 2004
    Contact: Robert Lohn (206) 526-6150
    This document is available on the Internet at: http://www.pcouncil.org
    Draft Supplemantal EIS - Clean Slate Ecosystem Management Project, Aquatic and Terrestrial Restoration, Updated Alternatives for the Identifies Unroaded Areas
    Nez Perce National Forest, Salmon River Ranger District, Idaho County, ID
    Comment Period Ended: June 1, 2004 --
    Final EIS - Little Wood River Irrigation District, Gravity Pressurized Delivery System Construction, Funding and U.S. Army COE Section 404 Permit, Townships of 1 North, 1 South and 2 South of Range 21 East of the Boise Merridan, City of Carey, Blaine County, ID
    Comment Period Ended: June 4, 2004
    Contact: Richard Sims (208)378-5700
    Draft Supplemental EIS - Frank Church-River of No Return Wilderness, Noxious Weed Treatments, Updated Information to Supplement the 1999 Final EIS for FR-RONRW, Implementation, Bitterroot, Boise, Nez Perce, Payette and Salmon-Challis National Forests, ID
    Comment Period Ended: June 21, 2004
    Contact: Howard Lyman (208) 839-2211-
    Final EIS - Mission Brush Project, Proposes Vegetation, Wildlife Habitat, Recreation and Aquatic Improvement
    Treatments, Idaho Panhandle National Forests, Bonners Ferry Ranger District, Bounty County, ID,

    Comment Period Ended: June 28, 2004
    Contact: Dough Nishek (208) 267-5561
    Draft EIS - Craters of the Moon National Monument and Preserve, Update and Consolidate Management Plans into One Comprehensive Plan, Snake River Plain, Blaine, Butte, Lincoln and Minidoka Counties, ID
    Comment Period Ended: July 29, 2004
    Contact: Adrienne Anderson (303) 987-6730. This document is available on the Internet at: http://www.id.blm.gov/planning/craters/index.htm
    Draft EIS - Fernan Lake Safety Improvement Project, Proposal to Reconstruct or Resurface 17.2 km (10.7 mi) Idaho Forest Highway 80 (ID PFH 80) commonly known as Fernan Lake Road, Right-of-Way Permit, Idaho Panhandle National Forests, Coeur d' Alene River Ranger District, Kootenai County, ID
    Comment Period Ended: July 31, 2004
    Contact: Sajiad Aftab (360) 619-7895
    This document is available on the Internet at: http://www.wfl.fhwa.dot.gov/projects/fernan/
    Draft EIS - American and Crooked Rivers Project, Improve Forest Health and Reduce Hazardous Fuels,
    Implementation, Nez Perce National Forest, Red River Ranger District, Idaho County, ID
    Comment Period Ended: July 26, 2004
    Contact: Denise Clark, 206-553-8414
    Draft EIS - American and Crooked Rivers Project, Improve Forest Health and Reduce Hazardous Fuels, Nez Perce National Forest, Red River Ranger District, Idaho County, ID,
    Comment Period Ended: July 26, 2004,
    Contact: Phil Jahn (208) 983-1950.
    Final EIS - EastBridge Cattle Allotment Management Plan Revision (AMP), Authorization of Continued Grazing, Caribou-Targhee National Forest, Soda Springs Ranger District, Caribou and Bonneville County, ID and Lincoln County, WY
    Comment Period Ended: July 26, 2004
    Contact: Victor Bradfield (208) 547-4356
    Final EIS - South Fork Wildfire Salvage Project, Harvesting Fire-Killed and Imminently Dead Trees, Cascade Ranger District, Boise National Forest, Valley County, ID.
    Comment Period Ended: August 9, 2004
    Contact: Keith Dimmett (208) 382-7430
    Draft EIS - South Bear River Range Allotment Management Plan Revisions, Continued Livestock Grazing on Ten Allotments, Caribou-Targhee National Forest, Montpelier Ranger District, Bear Lake and Franklin Counties, ID
    Comment Period Ended: August 16, 2004
    Contact: Heich Heyrend (208) 847-0375.
    Final EIS - Pacific Coast Groundfish Fishery Management Plan, Amendment 16-3 Adopts Rebuild Plans for Bocaccio, Cowcod, Widow Rockfish and Yelloweye Rockfish, Maximum Sustainable Yield (MSY), Implementation, WA, OR, ID and CA.
    Comment Period Ended: August 30, 2004
    Contact: D. Robert Lohn (206) 526-6150. This document is available on the Internet at: http://www.pcouncil.org/nepa/nepatrack.html.
    Draft EIS - Caspian Tern (sterna caspia) Management to Reduce Predation of Juvenile Salmonids in the Columbia River Esturary, To Comply with the 2002 Settlement Agreement, Endangered Species Act (ESA), Columbia River, WA, OR, ID and CA.
    Comment Period Ended: September 22, 2004
    Contact: Nanette Seto (503) 231-6164. This document is available on the Internet at: http://migratorybirds.pacific.fws.gov/CATE_DEIS.htm
    Draft EIS - Caribou Sheep Allotment Management Plan Revision, Authorize Continue Livestock Grazing, Caribou-Targhee National Forest, Palisades Ranger District, Bonneville County, ID.
    Comment Period Ended: October 4, 2004.
    Contact: Greg Hanson (208) 523-1412.
    Draft EIS - Red Pines Project, Proposes to Implement Fuel Reduction Activities and Improve the Range of Watershed Activities, Nez Perce National Forest, Red River Ranger District, Idaho County, ID.
    Comment Period Ended: October 12, 2004
    Contact: Ester Hutchison (209) 983-1950.
    Final EIS - High Mountains Heli-Skiing (HMH) Project, Issuance of a New 5-Year Special Use Permit (SUP) To
    Continue Operating Guided Helicopter Skiing in Portions of the Bridger-Teton National Forest and Caribou- Targhee National Forest (CTNF), Teton and Lincoln Counties, WY and Teton and Bonneville Counties, ID.

    Comment Period Ended: October 25, 2004
    Contact: Ray Spencer (307) 739-5400
    Published FR-09-24-04--Retracted due to Noncompliance of Section 1506.9 of the Council on Environmental Quality Regulations.
    Final EIS - Emerald Creek Garnet Project, Proposal to Mine Garnet Reserves within the St. Maries River Floodplain near Fernwood, Walla Walla District, Issuance of Several Permits, Benewah and Shoshone Counties, ID
    Comment Period Ended: November 8, 2004
    Contact: Barbara Benge (509) 527-7153
    Draft EIS - Grizzly Bear Conservation for the Greater Yellowstone Area National Forests, Implementation, Amend Six Forest Plans: Beaverhead-Deerlodge National Forest, Bridger-Teton National Forest, Caribour-Targhee National Forest and Shoshone National Forest, MT, WY and ID
    Comment Period Ended: November 12, 2004
    Contact: Dave Cawrse (307) 527-6241.
    Draft EIS - Programmatic--Missile Defense Agency, To Incrementally Develop, Test, Deploy and Plan for Decommissioning of the Ballistic Missile Defense System (BMDS)
    Comment Period Ended: November 17, 2004
    Contact: Martin Duke (703) 697-4248
    Draft EIS - Meadows Slope Wildland Fire Protection Project, Proposes to Create and Maintains Fuelbreak of Reduced Crown Fire Hazard, Payette National Forest, New Meadows Rangers District, Adams and Valley Counties, ID
    Comment Period Ended: November 22, 2004
    Contact: Kimberly Branded (208) 347-0300
    Final EIS - Box Canyon Hydroelectric Project, (FERC Project No. 2042-013), New License Application for an
    existing 72-megawatt (Mw) Hydroelectric Project, Public Utility District (PUD) No. 1, Pend Oreille River, Pend Oreille County, WA and Bonner County, ID.

    Comment Period Ended: November 22, 2004
    Contact: Jon Cofrancesco (202) 502-8951
    Draft EIS - Pacific Northwest Region Invasive Plant Program, Preventing and Managing Invasive Plants, Implementation, OR, WA, Including Portions of Del Norte and Siskiyou Counties, CA and Portions of Nez Perce, Salmon, Idaho and Adam Counties, ID.
    Comment Period Ended: November 24, 2004
    Contact: Eugene Skrine (503) 808-2685.
    Draft EIS - Programmatic--Wind Energy Development Program, To Address Stewardship, Conservation and Resource Use on BLM-Administered Lands, Right-of-Way Grants, Western United States.
    Comment Period Ended: December 9, 2004
    Contact: Lee Otteni (505) 599-8911
    Final EIS - High Mountains Heli-Skiing (HMH) Project, Issuance of a New 5-Year Special Use Permit (SUP) to Continue Operating Guided Helicopter Skiing in Portions of the Bridger-Teton National Forest and Caribou- Targhee National Forest (CTNF), Teton and Lincoln Counties, WY and Teton and Bonneville Counties, ID.
    Comment Period Ended: December 20, 2004
    Contact: Ray Spencer (307) 739-5400
    [Revision of FR Notice Published on 09/24/2004: CEQ Comment Period Ending 10/25/2004 has been reestablished to 12/20/2004. Due to Incomplete Distribution of the FEIS at the time of Filing with USEPA under Section 1506.9 of the CEQ Regulations.]
    Draft EIS - Paddy Flat Vegetation Project, Harvesting and Regenerate Timber Stands Precommercially Thin Plantations, Rapid, Kennally and Camp Creeks, Payette National Forest, McCall Ranger District, Valley County, ID.
    Comment Period Ended: December 27, 2004
    Contact: Dan Anderson (208) 634-0435
    Final EIS - Caribou Sheep Allotment Management Plan Revision, Authorize Continue Livestock Grazing, Caribou-Targhee National Forest, Palisades Ranger District, Bonneville County, ID
    Comment Period Ended: January 31, 2005
    Contact: Greg Hanson (208) 523-1412
    Revision of FR Notice Published on 12/30/2004: CEQ wait period ending 1/30/2005 corrected to 1/31/2005.
    Final EIS - Programmatic EIS -Emergency Watershed Protection Program, Improvements and Expansion, To Preserve Life and Property Threatened by Disaster-Caused Erosion and Flooding, U.S. 50 States and Territories except Coastal Area
    Comment Period Ended: January 31, 2005
    Contact: Victor Cole (202) 690-4575
    Revision of FR Notice published on 12/30/2004: CEQ wait period ending 1/30/2005 corrected to 1/31/2005.
    Final EIS - Caspian Tern (sterna caspia) Management to Reduce Predation of Juvenile Salmonids in the Columbia River Esturary, To Comply with the 2002 Settlement Agreement, Endangered Species Act (ESA), Columbia River, WA, OR, ID and CA
    Comment Period Ended: March 7, 2005
    Contact: Nanette Seto (503) 231-6164
    Revision of FR Notice Published on 1/14/2005: CEQ Comment Period Ending 2/14/2005 has been extended to 3/07/2005.
    Draft EIS - Porcupine East, 9 Allotment Grazing Analysis Project, Authorizing Livestock Grazing, Caribou-Targhee National Forest, Dubois Ranger District, Cenntenial Mountains, Clark County, ID.
    Comment Period Ended: May 9, 2005
    Contact: Shane Q. Jacobson (208) 374-5422
    The above EIS should have appeared in the 03/25/2005 Federal Register. The 45-Day Comment Period is Calculated from 03/25/2005.
    Draft EIS - Caribou Travel Plan Revision, Determine the Motorized Road and Trail System, Implementation, Caribou-Targhee National Forest, Westside, Soda Spring and Montpelier Ranger Districts, Bannock, Bear River, Bonneville, Caribou, Franklin, Oneida and Power Counties, ID; Box Elder and Cache Counties, UT and Lincoln County, WY.
    Comment Period Ended: May 16, 2005
    Contact: Deb Tiller (208) 524-7500
    Final EIS - American and Crooked Rivers Project, Improve Forest Health and Reduce Hazardous Fuels, Implementation, Nez Perce National Forest, Red River Ranger District, Idaho County, ID.
    Wait Period Ended: May 16, 2005
    Contact: Ester McCullough (208) 983-0885
    Final EIS - Fernan Lake Safety Improvement Project, Proposal to Reconstruct or Resurface 17.2 km (10.7 mi) Idaho Forest Highway 80 (ID PFH 80) commonly known as Fernan Lake Road, Right-of-Way Permit, Idaho Panhandle
    Comment Period Ended: May 16, 2005
    Contact: Sajid Aftab (360) 619-7895
    Draft EIS - Aspen Range Timber Sale and Vegetation Treatment Project, Proposal to Treat Forested and Nonforested Vegetation, Caribou-Targhee National Forest, Soda Springs Ranger District, Caribou County, ID.
    Comment Period Ended: June 6, 2005
    Contact: Doug Heyrend 208-547-4356
    Draft EIS - Three Basins Timber Sale Project, Proposal to Treat 760 Acres of Mature Forest, Implementation, Caribou-Targhee National Forest, Montpellier Ranger District, Bearlake and Caribou Counties, ID.
    Comment Period Ended: June 6, 2005
    Contact: Ken Klingenberg 208-847-0375
    Draft Supplement EIS - Mission Brush Project, Additional Information, Proposes Vegetation, Wildlife Habitat, Recreation and Aquatic Improvement Treatments, Idaho Panhandle National Forests, Bonners Ferry Ranger District, Bounty County, ID.
    Comment Period Ends: June 20, 2005
    Contact: Doug Nisherk 208-267-5561
    Final EIS - Meadows Slope Wildland Fire Protection Project, Proposes To Create and Maintain a Fuelbreak of Reduced Crown Fire Hazard, Payette National Forest, New Meadows Rangers District, Adams and Valley Counties, ID.
    Wait Period Ends: June 20, 2005
    Contact: Sylvia Clark 208-347-0300
    Final EIS - Pacific Northwest Region Invasive Plant Program, Preventing and Managing Invasive Plants, Implementation, Portions of Del Norte and Siskiyou Counties, CA, portions of Nez Perce, Salmon, Idaho, and Adam Counties, ID, OR, and WA.
    Wait Period Ends: July 5, 2005
    Contact: Eugene Skrine 503-808-2685
    Final EIS - Lower Snake River Navigation Maintenance, To Perform Routine Maintenance of the Federal Navigation Channel and Berthing Areas, Lower Snake and Clearwater Rivers, WA and ID.
    Wait Period Ends: July 11, 2005
    Contact: Jack Sands 509-527-7287
    This document is available on the Internet at:
    http://www.nww.usace.army.mil/channel_maint/one-year
    Final EIS - Programmatic EIS--Proposed Revision to Grazing Regulations for the Public Lands, 42 CFR Part 4100, in the Western Portion of the United States.
    Wait Period Ends: July 18, 2005
    Contact: Bud Cribley 202-785-6569
    Final EIS - Programmatic--Wind Energy Development Program, To Address Stewardship, Conservation and Resource Use on BLM-Administered Lands, Right-of-Way Grants, Western United States.
    Wait Period Ends: July 25, 2005
    Contact: Ray Brady 202-452-7773
    Final EIS - Porcupine East, 9 Allotment Grazing Analysis Project, Authorizing Livestock Grazing, Caribou-Targhee National Forest, Dubois Ranger District, Cenntenial Mountains, Clark County, ID.
    Wait Period Ends: August 1, 2005
    Contact: Shane Q. Jacobson 208-374-5422
    Draft EIS - Proposed Consolidation of Nuclear Operations Related to Production of radioisotope Power Systems, Located or Planned Sites: Oak Ridge National Laboratory (ORNL), Tennessee; Los Alamos National Laboratory (LANL), New Mexico; and the Idaho National Laboratory (INL), Idaho, TN, NM, ID.
    Comment Period Ends: August 29, 2005
    Contact: Timothy A. Frazier 301-903-9420
    Final EIS - Red Pines Project, Implementation of Fuel Reduction Activities and Watershed Activities Improvement, Nez Perce National Forest, Red River Ranger District, Idaho County, ID.
    Wait Period Ends: August 29, 2005
    Contact: Jennie Fischer 209-983-1950
    Draft EIS - Minidoka Internment National Monument (Former Minidoka Relocation Center) , General Management Plan, Implementation, Jerome County, ID.
    Comment Period Ends: September 19, 2005
    Contact: Neil King 208-837-4793
    Draft EIS - Cotterel Wind Power Project and Draft Resource Management Plan Amendment, To Build a 190-240 megawatt, Wind-Powered Electrical Generation Facility, Right-of-Way Application, City of Burley, Towns of Albion and Malta, Cassia County, ID.
    Comment Period Ends: September 22, 2005
    Contact: Scott Barker 208-677-6699
    Final EIS - Craters of the Moon National Monument and Preserve, Update and Consolidate Management Plans, into One Comprehensive Plan, Snake River Plain, Butte, Blaine, Lincoln, and Minidoka Counties, ID.
    Wait Period Ends: September 26, 2005
    Contact: Adrienne Anderson 303-987-6730
    Revision of FR Notice Published on 08/12/2005: CEQ Wait Period Ending 9/12/2005 has been Reestablished to 09/26/2005. Due to Incomplete Distribution of the FEIS at the time of Filing with USEPA under Section 1506.9 of the CEQ Regulations.
    Draft EIS - Programmatic--Coeur d'Alene Tribe Integrated Resource Management Plan, Implementation, Coeur d' Alene Reservation and Aboriginal Territory, ID.
    Comment Period Ends: December 14, 2005
    Contact: Tiffany Allgood 208-686-8802
    Revision of Federal Register Notice Published on 09/30/2005: Comment Period Extended from 11/14/2005 to 12/14/2005.
    Draft EIS - South Fork Salmon River Subbasin Noxious and Invasive Weed Management Program, Implementation, Krassel and McCall Ranger Districts, Payette National Forest and Cascade Ranger District, Valley and Idaho Counties, ID.
    Comment Period Ends: December 20, 2005
    Contact: Ana Egnew 208-634-0624
    Draft EIS - Programmatic--Vegetation Treatments Using Herbicides on Bureau of Land Management Public Lands in 17 Westerns, including Alaska.
    Comment Period Ends: January 9, 2006
    Contact: Brian Amme 775-861-6645
    Final EIS - Caribou Travel Plan Revision, Determine the Motorized Road and Trail System, Implementation, Caribou-Targhee National Forest, Westside, Soda Spring and Montpeller Ranger Districts, Bannock, Bear River, Bonneville, Caribou, Franklin, Oneida and Power Counties, ID; Box Elder and Cache Counties, UT and Lincoln County, WY.
    Wait Period Ends: January 9, 2006
    Contact: Deb Tiller 208-557-5779
    Draft EIS - Newsome Creek Watershed Rehabilitation, Stream Restoration and Improvement and Decommissioning of Roads, Red River Ranger District, Nez Perce National Forest, Idaho County, ID.
    Comment Period Ends: January 17, 2006
    Contact: Stephanie Bransford 208-842-2113
    Final EIS - Paddy Flat Vegetation Project, Harvesting and Regenerate Timber Stands Precommercially Thin Plantations, Rapid, Kennally and Camp Creeks, Payette National Forest, McCall Ranger District, Valley County, ID.
    Wait Period Ends: January 30, 2006
    Contact: Dan Anderson, 208-634-0435
    Draft EIS - ID-75 Timmerman to Ketchum--US-20 to Saddle Road, Increase Roadway and Transportation Safety, Cities of Bellevue, Hailey, Ketchum and the City of Sun Valley, Blaine County, ID.
    Comment Period Ends: February 24, 2006
    Contact: Ed Johnson 208-334-9180
    Draft EIS - Smoky Canyon Mine Panels F & G, Proposed Mine Expansion, Caribou County, ID.
    Comment Period Ends: March 18, 2006
    Contact: Bill Stout, 208-478-6340
    Revision of FR Notice Published 12/30/2005: Comment Period has been extended from 03/03/2006 to 03/18/2006.
    Draft EIS - Coeur d'Alene Resource Management Plan, Implementation, Benewah, Bonner, Boundary, Kootenai and Shoshone Counties, ID.
    Comment Period Ends: April 13, 2006
    Contact: Scott Pavey 208-769-5050
    Draft EIS - Emerald Creek Garnet Area, To Provide a Public Recreational Area for Collecting Garnet Gemstone, U.S. Army COE Section 404 Permit, Idaho Panhandle National Forest, St. Joe Ranger District, Latah County, ID.
    Comment Period Ends: April 24, 2006
    Contact: Tracy Gravelle 208-245-6200
    Final EIS - Cotterel Wind Power Project and Draft Resource Management Plan Amendment, To Build a 190-240 megawatt, Wind-Powered Electrical Generation Facility, Right-of-Way Application, City of Burley, Towns of Albion and Malta, Cassia County, ID.
    Wait Period Ends: May 1, 2006
    Contact: Scott D. Barker 208-677-6678
    Draft Supplement EIS - West Gold Creek Project, Updated Information, Forest Management Activities Plan, Implementation, Idaho Panhandle National Forests, Sandpoint Ranger District, Bonner County, ID.
    Comment Period Ends: May 8, 2006
    Contact: A.J. Helgenberg 208-265-6643
    This document is available on the Internet at: http://www.fs.fed.us/ipnf/eco/manage/nepa/sptnepa/wgold/wg_dseis_document.pdf
    Draft EIS - Clear Prong Project, Timber Harvest, Temporary Road Construction, Road Maintenance, Road Decommissioning, Thinning of Sub-Merchantable Tree, and Prescribed Fire, Boise National Forest, Cascade Ranger District, Valley County, ID.
    Comment Period Ends: May 15, 2006
    Contact: Richard A. Smith 208-373-4100
    Draft EIS - Payette National Forest Travel Management Plan, Designate a System of Roads, Trails and Areas Open to Motorized and Non-Motorized Use, Implementation, Adam, Washington, Idaho, Valley Counties, ID.
    Comment Period Ends: May 19, 2006
    Contact: Ana Egnew 208-634-0600
    This document is available on the Internet at http://www.fs.fed.us/r4/payette/publications/trvl_mgmt/deis_trvl/trvl_deis.shtml
    Revision to FR Notice Published February 17, 2006: Comment Period Extended from April 3, 2006 to May 19, 2006.
    Final EIS - Sixshooter Project, To Reduce the Threats of Insect Infestation and Wildfire, Sixmile and West Fork Creek, Boise National Forest, Emmett Ranger District, Gem County, ID.
    Wait Period Ends: May 22, 2006
    Contact: Scott Godfrey 208-365-7000
    Draft EIS - White/White Analysis Project, Proposes Vegetative Management and Watershed Improvement, Lolo Creek, Chamook Creek, White Creek, Mike White Creek, Nevada Creek, and Utah Creek, Lochsa Ranger District, Clearwater National Forest, Idaho and Clearwater County, ID.
    Comment Period Ends: May 30, 2006
    Contact: Steve Bess 208-926-4274
    Final Supplement - Mission Brush Project, Additional Information, Proposes Vegetation, Wildlife Habitat, Recreation and Aquatic Improvement Treatments, Idaho Panhandle National Forests, Bonners Ferry Ranger District, Bounty County, ID.
    Wait Period Ends: June 5, 2006
    Contact: Doug Nishek 208-267-5561
    Draft EIS - AFS, ID, White/White Analysis Project, Proposes Vegetative Management and Watershed Improvement, Lolo Creek, Chamook Creek, White Creek, Mike White Creek, Nevada Creek, and Utah Creek, Lochsa Ranger District, Clearwater National Forest, Idaho and Clearwater County, ID.
    Comment Period Ends: June 15, 2006
    Contact: Steve Bess 208-926-4274
    Revision to FR Notice Published April 14, 2006: Comment Period Extended from May 30, 2006 to June 15, 2006.
.

OREGON
*
    Final Supplemental EIS - Deep Vegetation Mangagement Project
    Ochoco National Forest, National Forest Service, Paulina Ranger District, Crook and Wheeler Counties, OR
    Comment Period Ended: March 15, 2004
    Contact: Mike Lawrence, (541) 477-6900
    Final EIS - Flagtail Fire Recovery Project - To Address the Differences between Existing and Desired Conditions
    Blue Mountain Ranger District, Malheur National Forest, Grant County, OR
    Comment Period Ended: April 5, 2004
    Contact: Linda Batten, (541) 575-3000
    This document is available on the Internet at http://www.fs.fed.us/r6/malheur
    Final EIS - South Medford Interchange Project - Relocation on 1-5 (Pacific Highway) south of its current location at Barnett Road
    Jackson County, OR
    Comment Period Ended: April 5, 2004
    Contact: John Gernhauser, (503) 399-5749
    Final EIS - Monument Fire Recovery Project and Proposed Nonsignificant Forest Plan Amendments
    Malheur National Forest, Prairie City Ranger District, Grant and Baker Counties, OR
    Comment Period Ended: April 19, 2004
    Contact: Ryan Falk, (541) 820-3311
    This document is available on the Internet at: http://www.fs.fed.us/r6/malheur/--
    Final EIS - Seattle Monorail Project: Green Line 14-Mile Monorail Transit System Construction and Operation - Reviewing a water crossing at Lake Washington Ship Canal Bridge and Duwamish Waterway Bridge Modification, City of Seattle, WA
    Comment Period Ended: April 19, 2004
    Contact: Austin Pratt, 206-220-7282
    This document is available on the Internet at: http://dms.dot.gov--
    Final EIS - Monument Fire Recovery Project, Whitman Unit
    Wallowa-Whitman National Forest, Baker County, OR
    Comment Period Ended: April 26, 2004
    Contact: Roger LeMaster (541) 523-4476.
    Final EIS - Toolbox Fire Recovery Project - To Promote the Recovery of the Toolbox Complex Fires of July 2002
    Fremont-Winema National Forest, Silver Lake Ranger District, Lake County, OR

    Comment Period Ended: April 26, 2004
    Contact: Rick Elston, (541) 576-7569
    This document is available on the Internet at: http://www.fs.fed.us/r6/winema/management/analyses/toolbox/index.shtml--
    Draft EIS - Pacific Coast Groundfish Bycatch Management
    National Oceanic and Atmospheric Administration (NOAA), WA, CA, OR
    Comment Period Ended: April 27, 2004
    Contact: D. Robert Lohn, (206) 526-6150
    This document is available on the Internet at: http://www.nwr.noaa.gov/1sustfsh/groundfish/eis_efh/pseis/ ----
    Final EIS - Upper Siuslaw Late-Successional Reserve Restoration Plan, To Protect and Enhance Late-Successional and Old-Growth Forest Ecosystems, Eugene District Resource Management Plan, Northwest Forest Plan, Coast Range Mountains, Lane and Douglas Counties, OR
    Comment Period Ended: May 10, 2004
    Contact: Rich Colvin (541) 683-6669--
    Draft EIS - Diamond Lake Restoration Project -- To Improve Water Quality and the Recreational Fishery
    Umpqua National Forest Diamond Lake Ranger District, Umpqua River Basin, Douglas County, OR
    Comment Period Ended: May 17, 2004
    Contact: Sherrie Chambers (541) 496-3532.
    This document is available on the Internet at: http://www.fs.fed.us/r6/umpqua --
    Draft EIS Supplement - Rimrock Ecosystem Restoration Projects, New Information on the
    Commercial and Non-commercial Thinning Treatments in the C3 Management Area

    Umatilla National Forest, Heppner Ranger District, Grant, Morrow and Wheeler Counties, OR,
    Comment Period Ended: May 17, 2004
    Contact: David Centrex (541) 676-9187
    This document is available on the Internet at: http://www.fs.fed/us/r6/uma/projects/readroom/
    Draft EIS - Pacific Coast Groundfish Fishery Management Plan, Amendment 16-3 Adopts Rebuild Plans for Bocaccio, Cowcod, Widow Rockfish and Yelloweye Rockfish, Maximum Sustainable Yield (MSY), Implementation, WA, OR, ID and CA
    Comment Period Ended: May 24, 2004
    Contact: Robert Lohn (206) 526-6150
    This document is available on the Internet at: http://www.pcouncil.org
    Final EIS - Juncrock Timber Sale Project, Treat Forest Vegetation, MT. Hood National Forest, Barlow Ranger District, Wasco County, OR,
    Comment Period Ended: May 24, 2004
    Contact: Becky Nelson, (541) 467-2291
    This document is available on the Internet at: http://www.fs.fed.us/r6/mthood
    Final EIS - North Fork Burnt River Mining Project, Proposal for Mineral Plans of Operation, Implementation, Wallowa-Whitman National Forest, Unity Ranger District, Whitman Unit,Blue Mountains, Town of Unity, Baker County, OR
    Comment Period Ended: June 4, 2004
    Contact: Wayne Frye (541) 523-1945--
    Final EIS - Baked Apple Fire Salvage Project,Salvaging Fire Killed Trees in the Matrix Portion of the 2002 Apple Fire,Umpqua National Forest, Umpqua Ranger District, Douglas County,OR
    Comment Period Ended: June 4, 2004
    Contact: Debbie Anderson (541) 957-3466
    This document is available on the Internet at: http://www.fs.fed.us/r6/umpqua/--
    Draft EIS - Davis Fire Recovery Project, Moving Resource Conditions Closer to the Desired Conditions, Deschutes
    National Forest, Crescent Ranger District, Deschutes and Klamath Counties, OR
    Comment Period Ended: July 6, 2004
    Contact: Chris Mickle (541) 433-3216
    Draft EIS (Amended) - Puget Sound Chinook Harvest Resource Management Plan, Implementation, Endangered Species Act, OR and WA,
    Comment Period Ended: July 1, 2004,
    Contact: Mike Letourneau, 206-553-6382
    Final EIS - Biscuit Fire Recovery Project, Various Management Activities Alternatives, Implementation, The Rogue River and Siskiyou National Forests, Josephine and Curry Counties, OR
    Comment Period Ended: July 6, 2004
    Contact: Tom Link (541) 471-6500. This document is available on the Internet at http://www.biscuitfire.com
    Final EIS - Pelton Round Butte Hydroelectric Project, Application for a New License for Existing 366.82-megawatt Project, Deschutes River, OR Comment Period Ends: July 12, 2004
    Contact: Contact: Bill Ryan, 206-553-8561
    Final EIS - Pelton Round Butte Hydroelectric Project, (FERC No. 2030-036), Application for a New License for Existing 366.82-megawatt Project, Deschutes River, OR,
    Comment Period Ended: July 12, 2004,
    Contact: Nicholas JayJack (202) 502-8902
    Final EIS - Pioneer Mountain to Eddyville Project on U.S. 20, Corvallis-Newport Highway Improvements, Funding, Right-of-Way Grant and U.S. Army COE Section 404 Permit Issuance, Lincoln County, OR
    Comment Period Ended: July 26, 2004
    Contact: Elton Chang (503) 587-4710
    Final EIS - Eyerly Fire Salvage Project, Burned and Damaged Trees Salvage, Reforestation and Fuels Treatment, Implementation, Deschutes National Forest, Sisters Ranger District, Jefferson County, OR
    Comment Period Ended: August 2, 2004
    Contact: Dave Owens (541) 416-6425.
    This document is available on the Internet at: "http://www.fs.fed.us/r6/deschutes
    Final Supplemental EIS - Rimrock Ecosystem Restoration Projects, New Information on the Commercial and Non-commercial Thinning Treatments in the C3 Management Area, Umatilla National Forest, Heppner Ranger District, Grant, Morrow and Wheeler Counties, OR.
    Comment Period Ended: August 9, 2004
    Contact: David S. Herr (541) 278-3869
    Final EIS - COB Energy Facility, Proposes to Construct a 1,160-megawatt (MW) Natural Gas-Fired and Combined-Cycle Electric Generating Plant, Right-of-Way Permit cross Federal Land under the Jurisdiction of BLM, Klamath Basin, Klamath County, OR.
    Comment Period Ended: August 9, 2004
    Contact: Thomas C. McKinney (503) 230-4749
    Draft EIS - 18 Fire Recovery Project, Salvaging Dead Trees, Reforesting 1,936 Acres with Ponderosa Pine Seedling and Closing/Decommissioning Roads, Deschutes National Forest, Bend/Fort Rock Ranger District, Deschutes County, OR
    Comment Period Ended: August 16, 2004
    Contact: Jim Schlaich (541) 383-4725.
    This document is available on the Internet at: http://www.fs.fed.us/r6/centraloregon/projects/units/bendrock/18fire/
    Final EIS - Pacific Coast Groundfish Fishery Management Plan, Amendment 16-3 Adopts Rebuild Plans for Bocaccio, Cowcod, Widow Rockfish and Yelloweye Rockfish, Maximum Sustainable Yield (MSY), Implementation, WA, OR, ID and CA.
    Comment Period Ended: August 30, 2004
    Contact: D. Robert Lohn (206) 526-6150. This document is available on the Internet at: http://www.pcouncil.org/nepa/nepatrack.html.
    Final EIS - Northeast Oregon Hatchery Program, Grande Ronde--Imnaha Spring Chinook Hatchery Modification and Modernization of Two Existing Hatchery Facilities and Construction of Three New Auxiliary Hatchery Facilities, Wallowa County, OR.
    Comment Period Ended: August 30, 2004
    Contact: Mickey Carter (503) 230-5885.
    Draft EIS - Tamarack Quarry Expansion Project, Secure a Long-Term, Economical Source of Rock Material to Use for Highway and Road Maintenance, Mt. Hood National Forest, Clackamas County, OR.
    Comment Period Ended: September 7, 2004
    Contact: Mike Redmond (503) 668-1776. This document is available on the Internet at: http://www.fs.fed.us/r6/mthood
    Final EIS - Davis Fire Recovery Project, Moving Resource Conditions Closer to the Desired Conditions, Deschutes National Forest, Crescent Ranger District, Deschutes and Klamath Counties, OR
    Comment Period Ended: September 13, 2004
    Contact: Chris Mickle (541) 433-3216.
    Final EIS - Andrews Management Unit/Steens Mountain Cooperative Management and Protection Area Resource Management Plan, Implementation, Harney and Malheur Counties, OR
    Comment Period Ended: September 13, 2004
    Contact: Gary Foulkes (541) 573-4541.
    Draft EIS - Caspian Tern (sterna caspia) Management to Reduce Predation of Juvenile Salmonids in the Columbia River Esturary, To Comply with the 2002 Settlement Agreement, Endangered Species Act (ESA), Columbia River, WA, OR, ID and CA.
    Comment Period Ended: September 22, 2004
    Contact: Nanette Seto (503) 231-6164. This document is available on the Internet at:
    http://migratorybirds.pacific.fws.gov/CATE_DEIS.htm
    Draft EIS - Spencer Creek Bridge U.S. Highway 101 Replacement Project, To Maintain the Connectivity and Highway Functions of U.S. 101 between Otter River and Watt Creek, Funding, Lincoln County, OR
    Comment Period Ended: September 27, 2004
    Contact: John Gernhauser (503) 399-5749
    Draft EIS - Crater Lake National Park General Management Plans, Implementation, Klamath, Jackson and Douglas Counties, OR.
    Comment Period Ended: October 5, 2004
    Contact: Terry Urbanowski (303) 969-2277
    Draft EIS - 2005-2006 Pacific Coast Groundfish Fishery, Proposed Acceptable Biological Catch and Optimum Yield Specifications and Management Measures, WA, OR and CA.
    Comment Period Ended: October 12, 2004
    Contact: D. Robert Lohn (206) 526-6150
    This document is available on the Internet at:
    http://www.pcouncil.org
    Draft EIS - West Maurys Fuels and Vegetation Management Project, Prescribed Fire, Commercial and Noncommercial Thinning, Grapple Piling and Hand Piling, Implementation, Lookout Mountain Range District, Ochoco National Forest, Crook County, OR
    Comment Period Ended: October 19, 2004
    Contact: Arthur J. Currier (541) 416-6500
    Final EIS - Easy Fire Recovery Project and Proposed Nonsignificant Forest Plan Amendments, Timber Salvage, Future Fuel Reduction, Road Reconstruction and Maintenance, Road Closure, Tree Planting and Two Non-significant Forest Plan Amendments, Implementation, Malheur National Forest, Prairie City Ranger District, Grant County, OR.
    Comment Period Ended: October 25, 2004
    Contact: Rick Larson (541) 820-3391
    Final EIS - Mt. Ashland Ski Area Expansion, Site Specific Project, Maintenance and Enhancements of Environmental Resources, Implementation, Special Use Permit, Ashland Ranger District, Rogue River National Forest and Scott River Ranger District, Klammath National Forest, Jackson County, OR.
    Comment Period Ended: October 25, 2004
    Contact: Linda Duffy (541) 592-2900. This document is available on the Internet at: http://www.fs.fed.us/r6/siskiyou/planning/mtashland/feis
    Final EIS - Programmatic EIS--Pacific Coast Groundfish Bycatch Management, Establishment of Policies and Program Direction to Minimize Bycatch in the West Coast Groundfish Fisheries, Magnuson-Stevens Act, WA, OR, and CA
    Comment Period Ended: October 25, 2004
    Contact: D. Robert Lohn (206) 526-6150
    Final EIS - Fire Recovery Project, Salvaging Dead Trees, Reforesting 1,936 Acres with Ponderosa Pine Seedling and Closing/Decommissioning Roads, Deschutes National Forest, Bend/Fort Rock Ranger District, Deschutes County, OR
    Comment Period Ended: November 8, 2004
    Contact: Jim Schlaich (541) 383-4725, Ext 4769
    Draft EIS - Joseph Creek Rangeland Analysis Project, Proposal to Allocate Forage for Commercial Livestock Grazing on Eleven Allotments, Wallowa-Whitman National Forest, Wallowa Valley Ranger District, Wallowa County, OR.
    Comment Period Ended: November 8, 2004
    Contact: Alicia Glassford (541) 426-5689.
    Draft EIS - Williamson River Delta Restoration Project, To Restore and Maintain the Ecological Functions of the Delta, Williamson River, Klamath County, OR
    Comment Period Ended: November 15, 2004
    Contact: Kevin Conroy (541) 883-6924, Ext 115
    Draft EIS - Programmatic--Missile Defense Agency, To Incrementally Develop, Test, Deploy and Plan for Decommissioning of the Ballistic Missile Defense System (BMDS)
    Comment Period Ended: November 17, 2004
    Contact: Martin Duke (703) 697-4248
    Final EIS - Crooked River National Grassland Vegetation Management/Grazing, Vegetation Treatments and Grazing Disposition, Ochoco National Forest, Jefferson County, OR.
    Comment Period Ended: November 22, 2004
    Contact: Steve Gibson (541) 416-6440.
    This document is available on the Internet at: http://www.fs.fed.us/r6/centraloregon
    Draft EIS - Programmatic--Wind Energy Development Program, To Address Stewardship, Conservation and Resource Use on BLM-Administered Lands, Right-of-Way Grants, Western United States.
    Comment Period Ended: December 9, 2004
    Contact: Lee Otteni (505) 599-8911
    Draft EIS - California Coastal National Monument Resource Management Plan, To Protect Important Biological and Geological Values: Islands, Rocks, Exposed Reefs, and Pinnacles above Mean High Tide, CA, OR and Mexico.
    Comment Period Ended: December 16, 2004
    Contact: Rick Hanks (831) 372-6115.
    Draft EIS - Rogue River-Siskiyou National Forest, Special Use Permits for Outfitter and Guide Operations on the Lower Rogue and Lower Illinois Rivers, Gold Beach Ranger District, Rogue River-Siskiyou National Forest, Curry County, OR.
    Comment Period Ended: January 10, 2005
    Contact: Jim Heck (541) 858-2303
    This document is available on the Internet at: http://wwwtest.fs.fed.us/r6/rogue-siskiyou/projects/special-use/outfitter-rogue-illinois-river/rr-deis-ll-04-04.pdf.
    Final EIS - Diamond Lake Restoration Project, Improve Water Quality and the Recreational Fishery, Umpqua National Forest, Diamond Lake Ranger District, Umpqua River Basin, Douglas County, OR.
    Comment Period Ended: January 18, 2005
    Contact: Sherri Chambers (541) 496-3532
    Final EIS - Wanapa Energy Center, Construction and Operation a New 1,200 Megawatt (MW) Natural Gas-Fired Electric Power Generating Facility, Confederated Tribes of the Umatilla Indian Reservation (CTUIR), in the City of Hermiston and the Port of Umatilla, OR.
    Comment Period Ended: January 18, 2005
    Contact: Jerry Lauer (541) 278-3786
    3rd Final Supplemental EIS -South Corridor Project, I-205/Portland Mall Light Rail (Phase I), Selected the Locally Preferred Alternative (LPA), Clackamas and Multnomah Counties, OR
    Comment Period Ended: January 31, 2005
    Contact: Rebecca Reyes-Alicea (206) 220-4464
    Final EIS - Programmatic EIS -Emergency Watershed Protection Program, Improvements and Expansion, To Preserve Life and Property Threatened by Disaster-Caused Erosion and Flooding, U.S. 50 States and Territories except Coastal Area
    Comment Period Ended: January 31, 2005
    Contact: Victor Cole (202) 690-4575
    Revision of FR Notice published on 12/30/2004: CEQ wait period ending 1/30/2005 corrected to 1/31/2005.
    Final EIS - Puget Sound Chinook Harvest Resource Management Plan (RMP) 2004-2009, Implementation, Endangered Species Act, OR and WA
    Comment Period Ended: January 31, 2005
    Contact: Susan Bishop (206) 526-4587
    Final EIS - Upper Deschutes Resource Management Plan, Implementation, Deschutes, Klamath, Jefferson and Cook Counties, OR
    Comment Period Ends: February 14, 2005
    Contact: Mollie Chaudet (541) 416-6700
    Final EIS - Caspian Tern (sterna caspia) Management to Reduce Predation of Juvenile Salmonids in the Columbia River Esturary, To Comply with the 2002 Settlement Agreement, Endangered Species Act (ESA), Columbia River, WA, OR, ID and CA
    Comment Period Ends: March 7, 2005
    Contact: Nanette Seto (503) 231-6164
    Revision of FR Notice Published on 1/14/2005: CEQ Comment Period Ending 2/14/2005 has been extended to 3/07/2005.
    Final EIS - Cascade-Siskiyou National Monument (CSNM) Resource Management Plan, Implementation, Klamath and Rouge River Basins, Jackson County, OR.
    Comment Period Ends: March 14, 2005
    Contact: Kathy Minor (541) 618-2245
    Draft EIS - Timberline Express Project, To Improve the Winter Recreational Opportunities, Implementation, Zigzag Ranger District, Mt. Hood National Forest, Clackamas County, OR.
    Comment Period Ended: May 9, 2005
    Contact: Gary L. Larsen (503) 668-1700
    Draft EIS - Pacific Coast Groundfish Fishery Management Plan, To Conserve and Enhance Essential Fish Habitat Designation and Minimization of Adverse Impacts, Pacific Coast Exclusive Economic Zone, WA, OR and CA.
    Comment Period Ended: May 11, 2005
    Contact: Maryann Nickerson (206) 526-4490
    Final EIS - Plentybob Ecosystem Restoration Project, Restoration Activities Include: Prescribed Fire, Timber Harvest, Road Obliteration, Hardwood Planting and Noxious Weed Treatment, Implementation, Walla Walla Ranger District, Umatilla National Forest, Umatilla County, OR.
    Wait Period Ended: May 23, 2005
    Contact: Glen Westlund 509-522-6009
    Final EIS - Rogue River-Siskiyou National Forest, Special Use Permits for Outfitter and Guide Operations on the Lower Rogue and Lower Rogue and Lower Illinois Rivers, Gold Beach Ranger District, Rogue River-Siskiyou National Forest, Curry County, OR.
    Wait Period Ends: May 23, 2005

    Contact: John Borton 541-247-3640
    Final EIS - Pacific Northwest Region Invasive Plant Program, Preventing and Managing Invasive Plants, Implementation, Portions of Del Norte and Siskiyou Counties, CA, portions of Nez Perce, Salmon, Idaho, and Adam Counties, ID, OR, and WA.
    Wait Period Ends: July 5, 2005
    Contact: Eugene Skrine 503-808-2685
    Final EIS - Crater Lake National Park General Management Plan, Implementation, Klamath, Jackson and Douglas Counties, OR.
    Wait Period Ends: July 5, 2005
    Contact: Terry Urbanowski 303-969-2277
    Final EIS - Newberg-Dundee Transportation Improvement Project, (TEA 21 Prog. #37), Proposal to Relieve Congestion on OR-9W through the Cities of Newberg and Dundee, Bypass Element Location (Tier 1), Yamhill County, OR.
    Wait Period Ends: July 18, 2005
    Contact: Alan J. Fox 503-986-2681
    Final EIS - West Maurys Fuels and Vegetation Management Project, Prescribed Fire, Commercial and Noncommercial Thinning, Grapple Piling and Hand Piling, Implementation, Lookout Mountain Range District, Ochoco National Forest, Crook County, OR.
    Wait Period Ends: July 18, 2005
    Contact: Larry Timchak 541-416-6500
    Final EIS - Programmatic EIS--Proposed Revision to Grazing Regulations for the Public Lands, 42 CFR Part 4100, in the Western Portion of the United States.
    Wait Period Ends: July 18, 2005
    Contact: Bud Cribley 202-785-6569
    Draft EIS - Blue Mountain Land Exchange--Oregon Project, Proposed Exchange of Federal and Non-Federal Lands, Malheur, Umatilla, and Wallowa-Whitman National Forests, Baker, Grant, Morrow, Umatilla, Union and Wallowa Counties, OR.
    Comment Period Ends: July 25, 2005
    Contact: Jean Lavell 541-523-1230
    Final EIS - Programmatic--Wind Energy Development Program, To Address Stewardship, Conservation and Resource Use on BLM-Administered Lands, Right-of-Way Grants, Western United States.
    Wait Period Ends: July 25, 2005
    Contact: Ray Brady 202-452-7773
    Final EIS - B&B Fire Recovery Project, Proposed Harvest of Fire-Killed Trees, Reduction of Fuels, Planting of Tree, Deschutes National Forest, Sisters Ranger District, Jefferson and Deschutes Counties, OR.
    Wait Period Ends: August 1, 2005
    Contact: Brent Ralston 541-383-5784
    Final EIS - Williamson River Delta Restoration Project, To Restore and Maintain the Ecological Functions of the Delta, Williamson River, Klamath County, OR.
    Wait Period Ends: August 1, 2005
    Contact: Kevin Conroy 541-883-6924, Ext. 115
    Draft EIS - Ashland Forest Resiliency Project, To Recover from Large-Scale High-Severity Wild Land Fire, Upper Bear Analysis Area, Ashland Ranger District, Rogue River-Siskiyou National Forest, Jackson County, OR.
    Comment Period Ends: August 8, 2005
    Contact: Linda Duffy 541-552-2900
    Final EIS - Provolt Seed Orchard Integrated Pest Management (IPM) Program, Implementation, Grants Pass, Medford District, Jackson and Josephine Counties, OR and Charles A. Sprague Seed Orchard Integrated Pest Management Program (IMP), Implementation, Merlin, Medford District, Josephine County, OR.
    Wait Period Ends: August 15, 2005
    Contact: Grodon LyFord (541) 618-2401
    Final EIS - Walter H. Horning Seed Orchard Integrated Pest Management Program (IPMO), Implementation, Colton, Salem District, Clackamas County, OR.
    Wait Period Ends: August 15, 2005
    Contact: Terry Garren (503) 630-6888
    Final EIS - Travis Tyrrell Seed Orchard Integrated Pest Management (IPM) Program, Implementation, Eugene District, Lorne, Lane County, OR.
    Wait Period Ends: August 15, 2005
    Contact: Glenn Miller (541) 683-6445
    Draft Supplemental EIS - Drew Creek, Diamond Rock and Divide Cattle Allotments, Updated Information. Issuance of Term Grazing Permits on Livestock Allotments on Tiller Ranger District, Implementation, Umpqua National Forest, Douglas and Jackson Counties, OR.
    Comment Period Ends: September 12, 2005
    Contact: Wes Yamamoto 541-825-3201
    Draft EIS - Middle Fork John Day Range Planning Project, Livestock Grazing Authorization, Implementation, Blue Mountain Ranger and Prairie City Ranger Districts, Malheur National Forest, Grant County, OR.
    Comment Period Ends: October 24, 2005
    Contact: Linda Batten 541-575-3000
    Final EIS - Joseph Creek Rangeland Analysis Project, Proposal to Allocate Forage for Commercial Livestock Grazing on Eleven Allotment, Wallowa-Whitman National Forests, Wallowa Valley Ranger District, Wallowa County, OR.
    Wait Period Ends: November 7, 2005
    Contact: Alicia Glassford 541-426-5689
    Final EIS - Timberline Express Project, To Improve the Winter Recreational Opportunities, Implementation, Zigzag Ranger District, Mt. Hood National Forest, Clackamas County, OR.
    Wait Period Ends: December 27, 2005
    Contact: Mike Redmond 503-668-1776
    Draft EIS - Programmatic--Vegetation Treatments Using Herbicides on Bureau of Land Management Public Lands in 17 Westerns, including Alaska.
    Comment Period Ends: January 9, 2006
    Contact: Brian Amme 775-861-6645
    Final EIS - Pacific Coast Groundfish Fishery Management Plan, To Conserve and Enhance Essential Fish Habitat (EFH) Designation and Minimization of Advise Impacts, Coast Exclusive Economic Zone, WA, OR and CA.
    Wait Period Ends: January 9, 2006
    Contact: Dr. Robert Lohn 206-526-6150
    Final EIS - Big Butte Springs Timber Sales, To Implementation Management Direction, Roque River-Siskiyou National Forest, Butte Falls Ranger District, Cascade Zone, Jackson County, OR.
    Wait Period Ends: January 23, 2006
    Contact: Joe T. King 541-560-3400
    Draft EIS - Coyote Business Park, Confederated Tribes of the Umatilla Indian Reservation, Proposes to Develop, Build and Manage a Light Industrial Commercial Business Park, Umatilla County, OR.
    Comment Period Ends: February 17, 2006
    Contact: Jerry L. Lauer 541-278-3786
    Revision on FR Notice Published 12/16/2005: Comment Period Extend from 01/30/2006 to 02/17/2006.
    Draft EIS - North Steens Ecosystem Restoration Project, To Reduce Juniper-Related Fuels and Restore Various Plant Communities, Implementation, Andrews Resource Area, Cooperative Management and Protection Area (CMPA), Harney County, OR.
    Comment Period Ends: March 27, 2006
    Contact: Douglas Linn 541-573-4543
    Final EIS - Tamarack Quarry Expansion Project, Secure a Long-Term Economical Source of Rock Material to Use for Highway and Road Maintenance, Mt. Hood National Forest, Clackamas County, OR.
    Wait Period Ends: April 10, 2006
    Contact: Mike Redmond 503-668-1776
    This document is available on the Internet at:
    http://www.fs.fed.us/r6/mthood/projects/documents
    Final EIS - Spencer Creek Bridge U.S. Highway 101 Replacement Project, To Maintain the Connectivity and Highway Functions of U.S. 101 between Otter rock and Watt Creek, Funding, Lincoln County, OR.
    Wait Period Ends: May 1, 2006
    Contact: Michelle Eraut 503-587-4716
    Final EIS - Drew Creek Diamond Rock and Divide Cattle Allotments, Alternative 2 Preferred Alternative, Issuance of Term Grazing Permits on Livestock Allotments on Tiller Ranger District, Implementation, Umpqua National Forest, Douglas and Jackson Counties, OR.
    Wait Period Ends: May 8, 2006
    Contact: Wes Yamamoto 541-825-3100
    Draft EIS - Withdrawn -- Kelsey Vegetation Management Project, Moving Resource Conditions Closer to the Goals and Desired Future Condition, Deschutes National Forest Land Resource Management Plan, Bend-Fort Rock Ranger District, Deschutes County, OR.
    Comment Period Ends: May 30, 2006
    Contact: David Frantz 541-383-4721
    Revision of FR Notice Published 04/14/2006: Officially Withdrawn by the Preparing Agency
    Draft EIS - Klondike III Wind Project (300 megawatts {MW{time} ) and Biglow Canyon Wind Farm (400 megawatts {MW{time} ) Intragration Project, Construction and Operation of a Double-Circut 230-Kilovolt (kV) Transmission, Sherman County, OR
    Comment Period Ends: June 19, 2006
    Contact: Gene Lynard 503-230-3790
.
WASHINGTON
*
    Final EIS - Hanford: New Information on Waste Management Alternatives
    Department of Energy, Benton County, WA
    Comment Period Ended: March 15, 2004
    Contact: Michael S. Collins, (509) 376-6536
    Draft EIS - Chips Ahoy Project
    Idaho Panhandle National Forests, Priest Lake Ranger District, Bonner County, ID and Pend Orielle County, WA
    Comment Period Ended: April 12, 2004
    Contact: David DelSordo, (208) 443-6809
    This document is available on the Internet at: http://www.fs.fed.us/ipnf/eco/manage/nepa/index.html--
    Final EIS - Stimson Access Project - To Access their Private Property through National Forest System Lands Idaho Panhandle National Forests, Priest Lake Ranger District, Pend Oreille County, WA
    Comment Period Ended: April 26, 2004
    Contact: Gianna Vaccaro, (208) 265-6625
    This document is available on the Internet at: http://www.fs.fed.us/ipnf/eco/manage/nepa/index.html----
    Draft EIS - Pacific Coast Groundfish Bycatch Management
    National Oceanic and Atmospheric Administration (NOAA), WA, CA, OR
    Comment Period Ended: April 27, 2004
    Contact: D. Robert Lohn, (206) 526-6150
    This document is available on the Internet at: http://www.nwr.noaa.gov/1sustfsh/groundfish/eis_efh/pseis/--
    Draft EIS - Pacific Coast Groundfish Fishery Management Plan, Amendment 16-3 Adopts Rebuild Plans for Bocaccio, Cowcod, Widow Rockfish and Yelloweye Rockfish, Maximum Sustainable Yield (MSY), Implementation, WA, OR, ID and CA
    Comment Period Ended: May 24, 2004
    Contact: Robert Lohn (206) 526-6150
    This document is available on the Internet at: http://www.pcouncil.org
    Draft EIS - Alaskan Way Viaduct and Seawall Replacement Project, To Provide Transportation Facility and Seawall with Improved Earthquake Resistence, U.S. Army COE Section 10 and 404 Permits, Seattle WA
    Comment Period Ended: June 1, 2004
    Contact: Mary Gray (360) 753-9487
    Final EIS - I-90 Two-Way Transit and HOV Operation Project, Provision of Reliable Transportation between Seattle and Bellevue, Sound Transit Regional Express, U.S. Coast Guard & U.S. Army COE Nationwide Permits Issuance, King County, WA,
    Comment Period Ended: June 21, 2004
    Contact: James A. Leonard (360) 753-9408
    Final EIS - 49 Degrees North Mountain Resort, Revised Master Development Plan, Implementation, Colville National Forest, Newport Ranger District, Stevens County, WA,
    Comment Period Ended: June 28, 2004
    Contact: Nancy Glines (509) 447-7300
    This document is available on the Internet at:
    http://www.fs.fed.us/r6/colville/forest/projects
    Final EIS- Banks Lake Drawdown Project, Proposal to Lower the Water Surface Elevation from 1565 feet to 1560 feet in August of Each Year, Columbia River, Douglas and Grant Counties, WA
    Comment Period Ended: June 28, 2004
    Contact: Jim Blanchard (509) 754-0226
    Draft EIS (Amended) - Puget Sound Chinook Harvest Resource Management Plan, Implementation, Endangered Species Act, OR and WA
    Comment Period Ended: July 1, 2004
    Contact: Mike Letourneau, 206-553-6382
    Draft EIS - Puget Sound Chinook Harvest Resource Management Plan (RMP) 2004-2009, OR and WA,
    Comment Period Ended: July 1, 2004,
    Contact: Susan Bishop (206) 526-4587.
    Revision of FR Notice Published on 4/16/2004: CEQ Comment Period Ending on 06/1/2004 has been Extended to 7/01/2004.
    Draft Supplement EIS - Southeast Issaquah Bypass, Updated Information, King County, WA,
    Comment Period Ended: July 30, 2004,
    Contact: Peter U. Eun (360) 753-9551
    Final EIS - Pacific Coast Groundfish Fishery Management Plan, Amendment 16-3 Adopts Rebuild Plans for Bocaccio, Cowcod, Widow Rockfish and Yelloweye Rockfish, Maximum Sustainable Yield (MSY), Implementation, WA, OR, ID and CA.
    Comment Period Ended: August 30, 2004
    Contact: D. Robert Lohn (206) 526-6150. This document is available on the Internet at: http://www.pcouncil.org/nepa/nepatrack.html.
    Final EIS - Cherry Point Cogeneration Project, To Build a 720-megawatt Gas-Fired Combined Cycle Cogeneration Facility, Energy Facility Site Evaluation Council (EFSEC), Whatcom County, WA.
    Comment Period Ended: September 7, 2004
    Contact: Thomas E. McKinney (503) 230-4749
    This document is available on the Internet at: http://www.efsec.wa.gov
    Final EIS - Crystal Mountain Master Development Plan, To Provide Winter and Summer Recreational Use, Special-Use-Permit, Mt. Baker-Snoqualmie National Forest, Silver Creek Watershed, Pierce County, WA.
    Comment Period Ended: September 20, 2004.
    Contact: Larry Donovan (415) 744-3403.
    This document is available on the Internet at: http://www.fs.fed.us/r6/mbs/projects/crystal_eis .
    Draft EIS - Caspian Tern (sterna caspia) Management to Reduce Predation of Juvenile Salmonids in the Columbia River Esturary, To Comply with the 2002 Settlement Agreement, Endangered Species Act (ESA), Columbia River, WA, OR, ID and CA.
    Comment Period Ended: September 22, 2004
    Contact: Nanette Seto (503) 231-6164. This document is available on the Internet at:
    http://migratorybirds.pacific.fws.gov/CATE_DEIS.htm
    Final EIS - Nisqually National Wildlife Refuge (NWR) Comprehensive Conservation Plan, Habitat Restoration, Refuge Boundary Expansion and Related Environmental and Recreational Opportunities, Approval and Implementation, Puget Sound, Nisqually River Delta, Thornton and Pierce Counties, WA
    Comment Period Ended: October 4, 2004
    Contact: Jean Takekawa (360) 753-9467
    Draft EIS - 2005-2006 Pacific Coast Groundfish Fishery, Proposed Acceptable Biological Catch and Optimum Yield Specifications and Management Measures, WA, OR and CA.
    Comment Period Ended: October 12, 2004
    Contact: D. Robert Lohn (206) 526-6150
    This document is available on the Internet at:
    http://www.pcouncil.org
    Draft EIS - Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, WA
    Comment Period Ended: October 19, 2004
    Contact: Donald Rose (503) 230-3796
    Final EIS - Programmatic EIS--Pacific Coast Groundfish Bycatch Management, Establishment of Policies and
    Program Direction to Minimize Bycatch in the West Coast Groundfish Fisheries, Magnuson-Stevens Act, WA, OR, and CA

    Comment Period Ended: October 25, 2004
    Contact: D. Robert Lohn (206) 526-6150
    Draft EIS - Adoption--WA-104 Edmonds Crossing, Connecting Ferries, Buses and Rails, Funding, NPDES Permit and U.S. Army COE Section 10 and 404 Permits Issuance, City of Edmonds, Snohomish County, WA.
    Contact: Jennifer Bowman (206) 220-7933. Note: The U.S. Department of Transportation's (DOT's) Federal Transit Administration (FTA) has adopted DOT's Federal Highway Administration DEIS #980063, filed on 03/02/1998. FTA was a Cooperating Agency on the DEIS, Recirculation of the DEIS is Not Necessary under Section 1506.3(c) of the CEQ Regulations. FTA will be a Joint Lead Agency on the FEIS, will accept comments on the FEIS.
    Draft EIS - Fish Passage and Aquatic Habitat Restoration at Hemlock Dam, Implementation, Gifford Pinchot National Forest, Mount Adams District, Skamania County, WA
    Comment Period Ended: November 15, 2004
    Contact: Bengt Coffin (509) 395-3425
    Draft EIS - Programmatic--Missile Defense Agency, To Incrementally Develop, Test, Deploy and Plan for Decommissioning of the Ballistic Missile Defense System (BMDS)
    Comment Period Ended: November 17, 2004
    Contact: Martin Duke (703) 697-4248
    Final EIS - Box Canyon Hydroelectric Project, (FERC Project No. 2042-013), New License Application for an
    existing 72-megawatt (Mw) Hydroelectric Project, Public Utility District (PUD) No. 1, Pend Oreille River, Pend Oreille County, WA and Bonner County, ID.

    Comment Period Ended: November 22, 2004
    Contact: Jon Cofrancesco (202) 502-8951.
    Draft EIS - Pacific Northwest Region Invasive Plant Program, Preventing and Managing Invasive Plants, Implementation, OR, WA, Including Portions of Del Norte and Siskiyou Counties, CA and Portions of Nez Perce, Salmon, Idaho and Adam Counties, ID.
    Comment Period Ended: November 24, 2004
    Contact: Eugene Skrine (503) 808-2685.
    Draft EIS - Programmatic--Wind Energy Development Program, To Address Stewardship, Conservation and Resource Use on BLM-Administered Lands, Right-of-Way Grants, Western United States.
    Comment Period Ended: December 9, 2004
    Contact: Lee Otteni (505) 599-8911
    Final EIS - WA-104/Edmonds Crossing Project, Connecting Ferries, Bus and Rail, Funding, NPDES Permit and COE Section 10 and 404 Permit, City of Edmonds, Snohomish County, WA.
    Comment Period Ended: December 20, 2004
    Contact: Peter Eun (360) 753-9551
    Final EIS - WA-104/Edmonds Crossing Project, Connecting Ferries, Bus and Rail, Funding, NPDES Permit and COE Section 10 and 404 Permit, City of Edmonds, Snohomish County, WA.
    Comment Period Ended: December 20, 2004
    Contact: Peter Eun (360) 753-9551
    Revision of FR Notice published on 11/19/2004: The Department of Transportation's Federal Highway Administration and Federal Transit Administration are Joint Lead Agencies for the above Project. Also, Correction to Contact Person Telephone Number.
    Final EIS - Programmatic EIS -Emergency Watershed Protection Program, Improvements and Expansion, To Preserve Life and Property Threatened by Disaster-Caused Erosion and Flooding, U.S. 50 States and Territories except Coastal Area
    Comment Period Ended: January 31, 2005
    Contact: Victor Cole (202) 690-4575
    Revision of FR Notice published on 12/30/2004: CEQ wait period ending 1/30/2005 corrected to 1/31/2005.
    Final EIS - Puget Sound Chinook Harvest Resource Management Plan (RMP) 2004-2009, Implementation, Endangered Species Act, OR and WA
    Comment Period Ended: January 31, 2005
    Contact: Susan Bishop (206) 526-4587
    Draft EIS - White Pass Expansion Master Development Plan, Implementation, Naches Ranger District, Okanogan-Wenatchee National Forests and Cowlitz Valley Ranger District, Gifford Pinchot National Forest, Yakima and Lewis County, WA
    Comment Period Ends: February 22, 2005
    Contact: Randy Shepard (509) 653-1400
    Draft EIS - WA-28 Eastside Corridor Project, Proposal to Improve WA-28 (Sunset Highway) Corridor from WA-2-97 (Ocdabashian Bridge) to 9th Street N.E. in East Wenatchee, City of East Wenatchee, Douglas County, WA
    Comment Period Ends: February 27, 2005
    Contact: Steve Saxton (360) 753-9411
    This document is available on the Internet at: http://www.wsdot.wa.gov/Projects/SR28WenatcheeEastsideCorridor
    Final EIS - Caspian Tern (sterna caspia) Management to Reduce Predation of Juvenile Salmonids in the Columbia River Esturary, To Comply with the 2002 Settlement Agreement, Endangered Species Act (ESA), Columbia River, WA, OR, ID and CA
    Comment Period Ends: March 7, 2005
    Contact: Nanette Seto (503) 231-6164
    Revision of FR Notice Published on 1/14/2005: CEQ Comment Period Ending 2/14/2005 has been extended to 3/07/2005.
    Draft Supplement EIS - Elwha River Ecosystem Restoration Implementation Project, Updated Information, Olympic Peninsula, Challam County, WA
    Comment Period Ends: March 15, 2005
    Contact: Brian Winter (360) 565-1320
    Draft EIS - Pacific Coast Groundfish Fishery Management Plan, To Conserve and Enhance Essential Fish Habitat Designation and Minimization of Adverse Impacts, Pacific Coast Exclusive Economic Zone, WA, OR and CA.
    Comment Period Ended: May 11, 2005
Contact: Maryann Nickerson (206) 526-4490
    Draft EIS - Washington State Forest Habitat Conservation Plan, Proposed Issuance of Multiple Species Incidental Take Permit or (d) Rules, NPDES Permit, U.S. Army COE Section 10 and 404 Permits, WA.
    Comment Period Ended: May 12, 2005
    Contact: Ms. Sally Butts (360) 753-5832
    Draft EIS - Growden Dam Sherman Creek Restoration Project, and Forest Plan Amendment #28, Implementation, Colville National Forest, Ferry County, WA.
    Comment Period Ends: July 5, 2005
    Contact: Karen Honeycutt 509-684-7224
    Final EIS - Pacific Northwest Region Invasive Plant Program, Preventing and Managing Invasive Plants, Implementation, Portions of Del Norte and Siskiyou Counties, CA, portions of Nez Perce, Salmon, Idaho, and Adam Counties, ID, OR, and WA.
    Wait Period Ends: July 5, 2005
    Contact: Eugene Skrine 503-808-2685
    Final EIS - Dean Project Area, Proposes to Implement Multiple Resource Management Actions, Black Hills National Forest, Bearlodge Ranger District, Sundance, Crook County, WA
    Wait Period Ends: July 5, 2005
    Contact: Steve Kozel 307-283-1361
    Final EIS - Lower Snake River Navigation Maintenance, To Perform Routine Maintenance of the Federal Navigation Channel and Berthing Areas, Lower Snake and Clearwater Rivers, WA and ID.
    Wait Period Ends: July 11, 2005
    Contact: Jack Sands 509-527-7287
    This document is available on the Internet at:
    http://www.nww.usace.army.mil/channel_maint/one-year
    Final EIS - Programmatic EIS--Proposed Revision to Grazing Regulations for the Public Lands, 42 CFR Part 4100, in the Western Portion of the United States.
    Wait Period Ends: July 18, 2005
    Contact: Bud Cribley 202-785-6569
    Final EIS - Programmatic--Wind Energy Development Program, To Address Stewardship, Conservation and Resource Use on BLM-Administered Lands, Right-of-Way Grants, Western United States.
    Wait Period Ends: July 25, 2005
    Contact: Ray Brady 202-452-7773
    Draft EIS - Interstate 90 Snoqualmie Pass East Project, Proposes to Improve a 15-mile Portion of I-90 from Milepost 55.10 in Hyak to Milepost 70.3 New Easton, Funding, U.S. Army COE Section 404 Permit and NPDES Permit, Kittitas County, WA.
    Comment Period Ends: August 5, 2005
    Contact: Steve Saxton 360-753-9556
    This document is available on the Internet at: http://www.wsdot.wa.gov/projects/I90/SnoqualmiePassEast
    Draft Supplemental EIS - Upper Charley Subwatershed Ecosystem Restoration Projects, Proposing to Amend the Umatilla National Forests Land and Resource Management Plan to Incorporate Management for Canada lynx, Pomeroy Ranger District, Umatilla National Forest, Garfield County, WA.
    Comment Period Ends: August 22, 2005
    Contact: Monte Fujishin 509-843-1891
    This document is available on the Internet at: http://www.fs.fed.us/r6/uma/projects/readroom/pomeroy/up-charley_dseis.pdf
    Draft EIS - Mountain Lake Fisheries Management Plan for the North Cascades National Service Complex, Implementation, North Cascades National Park, Whatcom, Skagit and Chelan Counties, WA.
    Comment Period Ends: August 26, 2005
    Contact: Roy Zipp (360) 873-4590, Ext. 31
    Final Supplemental EIS - Deadman Creek Ecosystem Management Projects, Information of the Planning the Analysis of the Watershed, Three Rivers Ranger District, Colville National Forest, Ferry County, WA.
    Wait Period Ends: August 29, 2005
    Contact: Sherri Schwenke 509-738-7700
    Final EIS - Capacity Replacement Project, Construction and Operation of 79.5 miles Pipeline: Modify 5 Existing Compressor Stations, U.S. Army COE 10 and 404 Permits, Whatcom, Skagit, Snohomish, King, Pierce and Thurston Counties, WA.
    Wait Period Ends: September 5, 2005
    Contact: Peter Contreras 206-553-6708
    Final Supplemental EIS - Elwha River Ecosystem Restoration Implementation Project, Update Information, Olympic Peninsula, Challam County, WA.
    Wait Period Ends: October 3, 2005
    Contact: Brian Winter 360-565-1320
    Draft EIS - Rocky Reach Hydroelectric Project, (FERC/DEIS-0184D), Application for a New License for the Existing 865.76 Megawatt Facility, Public Utility District No. 1 (PUD), Columbia River, Chelan County, WA.
    Comment Period Ends: November 8, 2005
    Contact: Kim Nguyen 202-502-6105
    Draft EIS - South Park Bridge Project, Proposes to Rehabilitate or Replace the Historic South Park Ridge over the Duwamish Waterway at 14th/16 Avenue S, U.S. Coast Guard Permit and U.S. Army COE Section 10 and 404 Permits, King County, WA.
    Comment Period Ends: November 21, 2005
    Contact: Jim Leonard 360-753-9408
    Draft EIS - Lewis River Hydroelectric Projects, Relicensing the Swift No. 1 (FERC No. 2111-018), Swift No. 2 (FERC No. 2213-011), Yale (FERC No. 2071-013), Merwin (FERC No. 935-053) Project, Application for Relicense, North Fork Lewis River, Cowlitz, Clark and Shamania Counties, WA.
    Comment Period Ends: November 23, 2005
    Contact: Jon Cofrancesco 202-502-8951
    Draft Supplemental EIS - Central Link Light Rail Transit Project (Sound Transit)Construction and Operation of the North Link Light Rail Extension, from Downtown Seattle and Northgate, Updated Information on Refined Design Concepts, Funding, Right-of-Way and US Army COE Section 404 Permits, King County, WA.
    Comment Period Ends: November 30, 2005
    Contact: John Witmer 206-220-7954
    Draft EIS - Ebey's Landing National Historical Reserve General Management Plan, Implementation, Town of Coupeville, Island County, WA.
    Comment Period Ends: December 1, 2005
    Contact: Rob Harbour 360-678-6084
    Final EIS - Fish Passage and Aquatic Habitat Restoration at Hemlock Dam, Implementation, Gifford Pinchot National Forest, Mount Adams District, Skamania County, WA.
    Wait Period Ends: December 5, 2005
    Contact: Benet Coffin 509-395-3425
    Draft EIS - Programmatic--Vegetation Treatments Using Herbicides on Bureau of Land Management Public Lands in 17 Westerns, including Alaska.
    Comment Period Ends: January 9, 2006
    Contact: Brian Amme 775-861-6645
    Final EIS - Pacific Coast Groundfish Fishery Management Plan, To Conserve and Enhance Essential Fish Habitat (EFH) Designation and Minimization of Advise Impacts, Coast Exclusive Economic Zone, WA, OR and CA.
    Wait Period Ends: January 9, 2006
    Contact: Dr. Robert Lohn 206-526-6150
    Draft EIS - Peace Arch Port of Entry Redevelopment Project, Improvements to Security, Safety and Functionality, Canadian Border in Blaine, Whatcom County, WA.
    Comment Period Ends: January 23, 2006
    Contact: Michael Levine 253-931-7263
    Final Supplement EIS - Upper Charley Subwatershed Ecosystem Restoration Projects, Proposing to Amend the Umatilla National Forests Land and Resource Management Plan to Incorporate Management for Canada Lynx, Pomeroy Ranger District, Umatilla National Forest, Garfield County, WA.
    Wait Period Ends: January 30, 2006
    Contact: Allen J. Ollila 701-227-7735
    Revision of FR Notice Published on 12/30/2005: Correction to Wait Period from 02/13/2006 to 01/30/2006.
    Draft EIS - The Summit at Snoqualmie Master Development Plan (MPD), Proposal to Ensure Long-Term Economic Viability, Mt. Baker-Snoqualmie/Okanogan-Wenatchee National Forests, King County, WA.
    Comment Period Ends: February 21, 2006
    Contact: Larry Donovan 425-744-3403
    Revision of Federal Register Notice Published 12/16/2005; CEQ Comment Date has been extended from 02/06/2006 to 02/21/2006.
    Final EIS - Washington State Forest Habitat Conservation Plan, Propose Issuance of Multiple Species Incidental Take Permit of 4(d) Rules, NPDES Permit, U.S. Army COE Section 10 and 404 Permits, WA.
    Wait Period Ends: February 27, 2006
    Contact: Sally Butts 360-753-5832
    Draft EIS - South Valley Corridor Project, Improvement to Existing Urban Transportation System, Light Rail Transit (LRT), Right-of-Way Grant, City of Liberty Lake, Spokane County, WA.
    Comment Period Ends: March 13, 2006
    Contact: John Witmer 206-220-7954
    Draft EIS - Priest Rapids Hydroelectric Project, FERC Project #2114 Relicensing Application for New License, Columbia River, Grant, Yakima, Kittitas, Douglas, Benton, and Chelan Counties, WA.
    Comment Period Ends: April 17, 2006
    Contact: Todd Sedmak 1-866-208-3372
    Final EIS - Methow Transmission Project, Construction of New Transmission Line or Reconstruction an Existing Line, Okanogan and Wenatchee National Forests, Methow Valley Ranger District, Okanogan County, WA.
    Wait Period Ends: April 17, 2006
    Contact: Jan Flatten 509-826-3277
Final EIS, AFS - Growden Dam Sherman Creek Restoration Project, and Forest Plan Amendment #28, Implementation, Colville National Forest, Ferry County, WA
Wait Period Ends: April 24, 2006
Contact: Karen Honeycutt 509-738-7734
    Final EIS - Lewis River Hydroelectric Projects, Relicensing the Swift No. 1 (FERC No. 2111-018), Swift No. 2 (FERC No. 2213-011), Yale (FERC No. 2071-013), Merwin (FERC No. 935-053) Project, Application for Relicense, North Fork Lewis River, Cowlitz, Clark and Skamania Counties, WA.
    Wait Period Ends: May 1, 2006
    Contact: Todd Sedmark 1-866-208-3372
    Final Supplement - Central Link Light Rail Transit Project (Sound Transit) Construction and Operation of the North Link Light Rail Extension, from Downtown Seattle and Northgate, Updated Information on Refined Design Concepts, Funding, Right-of-Way and U.S. Army COE Section 404 Permits, King County, WA.
    Wait Period Ends: May 8, 2006
    Contact: James Irish 206-398-5000
    Draft EIS - Baker River Hydroelectric Project, Application to Relicense the Upper Baker and Lower Baker Developments, Mt. Baker-Snoqualmie National Forest, Baker River, Whatcom and Skagit Counties, WA.
    Comment Period Ends: May 30, 2006
    Contact: Steve Hocking 202-502-8753
    Draft EIS - School Fire Salvage Recovery Project, Salvage Harvest Fire-Killed (dead) and Fire-Damaged (dying) Trees, Implementation, Pomeroy Ranger District, Umatilla National Forest, Columbia and Garfield Counties, WA.
    Comment Period Ends: June 12, 2006
    Contact: Dave Herr 541-278-3869
    Final EIS - GSA, WA, Peace Arch Port of Entry Redevelopment Project, Improvements to Security, Safety and Functionality, Canadian Border in Blaine, Whatcom County, WA.
    Wait Period Ends: July 3, 2006
    Contact: Michael Levine 253-931-7263


Local Navigation


URL: http://yosemite.epa.gov/R10/ECOCOMM.NSF/NEPA+Review/EIS+Documents+Archive

Jump to main content.