|
 |
 |
T4 Photo Gallery
Terminal June 2009 Site Visit
The Wheeler Bay bank has been recreated to better handle erosion by the planting of willow trees, addition of rocks and gravel, and drift wood placement to create a natural habitat.

Overview of Wheeler Bay, looking west/downriver. |

Close up of habitat mix of sand and rounded rock. |

Tree, grass, and shrub plantings, looking south/southeast into Wheeler Bay |

View of habitat mix erosion on Wheeler Bay bank, with some of the underlying armor rock exposed. Plantings (small willows) visible in background. |

Close up of exposed armor rock. |

View of cut bank, looking riverward. |
Terminal 4 Phase I Abatement, Summer 2008
More Terminal 4 Abatement Photos, Summer 2008
March 2004 Diver and Boat Based Sampling Photos
[ Main Cleanup | Brownfields ]
[ Superfund | FOIA | Records Center ]
Point of contact: Judy Smith
E-Mail: smith.judy@epa.gov
Phone Number: (503)
Last Updated: 07/06/2009
|