|
 |
 |
Boomsnub 2001 Removal
April 2001 Fact Sheet - project making good progress
Action Memo - March 12, 2001
Administrative Record Index
Pollution Reports: (Top)
EPAOSC.net
April 27, 2001
April 23, 2001
April 13, 2001
April 6, 2001
March 31, 2001
3/19 to 3/24/2001
In the News: (Top)
Superfund official describes cleanup - April 18, 2001 OregonianLive.com 
Boomsnub Superfund Site: EPA Works to Remove Tainted Soil - March 22, 2001 Columbian.com 
Feds today will start cleaning contaminated Hazel Dell site - March 19, 2001 OregonianLive.com 
Projects Planned to Keep Contaminants From Drinking Water - January 31, 2001 Columbian.com 
Cleanup Planned at Old Boomsnub Site - January 20, 2001 Columbian.com 
Photos (click on each to expand): (Top)
April 19, 2001

Facing East showing the final grade of the site after excavation.
| 
Close up view of Area B-1 and B-2 after backfill and final grade. | 
View of new fence between Voorhies and Boomsnub, graded areas of V-1, B-12, B-12a, and new asphalt in front of treatment building. |

View of new fence between Voorhies and Boomsnub. Maroon-colored slatted fence in background between areas V-1 and LRR-1 is new as well. | 
Asphalt subcontractor paving section of road in front of the treatment building. | 
New backfill and final grade for areas B-7, B-9, B-11, and B-12a. |

Excavation area B-2 located on the Boomsnub site. | 
View of new asphalt in front of treatment building. Asphalt on V-1 was paid for by tenant of adjacent propety. | 
ERRS workers using vibrating compactor to compact excavation areas after confirmation. This compacting was done around buried pipes. |
April 13, 2001

ERRS using dozer to spread clean backfill in area V-1 & LRR-1. | 
ERRS excavating contaminated soil from area B-11 | 
Truck bringing clean backfill for area B-12. |

Excavator removing concrete steps from treatment building to remove contamination located beneath the concrete. | 
ERRS using articulated roller to compact backfill to a final grade. | 
Excavator removing contaminated soil from area B-9 located east of the treatment system. |

START collected confirmation samples from area B-10. | 
ERRS worker attaching new PVC pipe to make repair on an unused line. | 
Backhoe operator using hammer attachment to break concrete into smaller pieces to use as backfill for area B-9. |
April 4, 2001

Awning to treatment building was removed to access contaminated soil under asphalt and concrete adjacent to the building foundation: | 
Sections B-7 and B-8 backfilled with clean soil | 
Clean backfill arrives |

Compaction tester records results | 
ERRS worker compacting section B-7 and B-8 | 
START sampling drum contents |

START collecting soil samples on Clark County=s Railway property. | 
ESAT=s chemist analyzing soil samples on the Flame AA | 
All trucks are decontaminated before they depart site |

Area B-12 excavated to planned two foot depth. Ready for confirmation sampling. | 
Area V-1 with white flags marking sample locations. | 
START contractor collecting soil sample from are LRR1 north of site. |
March 28, 2001:

ERRS clean-up excavating area B-12 to a two foot depth | 
Areas Boomsnub (B)-4, B-5, B-6, B-7 & B-8 filled with backfill material | 
ERRS clean-up workers backfilling Area B-7 |

Stockpiling clean backfill to fill all excavated areas. | 
ERRS clean-up workers loading trucks with contaminated soil for off-site disposal | 
Trucks departing Boomsnub site with contaminated soil headed for disposal facility |

U.S. Coast Guard Strike Team member conducts health and safety air monitoring | 
Contractors removed blackberry bushes to access area LRR-1 for sampling. | 
View of inside the command post. |
March 22, 2001:

START Contractor collecting soil sample from stockpile for field analysis. | 
On-site EPA Command Post | 
ESAT chemist analyzing soil sample using a flame atomic absorption spectrometer to test for chromium and lead |

Site photo taken from the west showing excavators, dump truck, and stockpile. | 
ERRS Contractors using vacuum truck and shovels to hand dig contaminated soil on adjacent property. | 
Segregated stockpiles of contaminated soil removed from on-site excavations. |

High-powered vacuum truck used to excavate soils from hard-to-reach off-site areas. | 
START Chemist analyzing sample using Niton X-ray fluorescence spectrometer. | 
Photo of the entrance to the Boomsnub Site |
[ Main Cleanup | Brownfields ]
[ Superfund | FOIA | Records Center ]
Point of contact: Michael Szerlog
E-Mail: szerlog.michael@epa.gov
Phone Number: (206) 553-0279
Last Updated: 05/19/2006
|