| Date | Title | SDMS Document ID |
| Letter regarding Evaluation of Groundwater Discharge to the Willamette River RP-Portland with attached transmittal. | 1258812 |
8/1/2007 | Report regarding CERCLA Section 104 (e) Nomination Summaries. | 1254190 |
3/13/2007 | Letter responding to the comments in the 12/06 Draft Basis of Design Report (BOD), Revetment Source Control Measure for the BP Bulk Terminal 22T. | 1258416 |
3/1/2007 | Revised Basis of Design Report: Revetment Source Control Measure, BP Bulk Terminal 22T. | 1258415 |
3/1/2007 | Contract Documents and Technical Specifications for BP Terminal 22 - Sheet Pile Seawall (Phase I). | 1258414 |
3/1/2007 | Contract Documents and Technical Specifications for BP Terminal 22 - Revetment Removal (Phase II). | 1258413 |
3/1/2007 | Revised Environmental Control Plan: Revetment Removal Source Control Measure, BP Bulk Terminal 22T. | 1258412 |
1/31/2007 | Letter transmitting comments on the December 2006 Draft Basis of Design (BOD) Report, Revetment Source Control Measure (SCM) for the BP Bulk Terminal 22T. | 1259059 |
1/19/2007 | Letter transmitting EPA Comments on PB Bulk Terminal 22T Basis of Design Report, December 2006. | 1259042 |
| Draft Basis of Design Report, Revetment Source Control Measure. | 1244951 |
7/1/2006 | Final Source Control Implementation Report, Appendices. | 1244950 |
7/1/2006 | Final Source Control Implementation Report, Text, Tables, Figures. | 1244949 |
6/21/2006 | Letter regarding Reasonable Steps on Property owned by Mar Com and the State of Oregon, and transmitting the Revised Phase I Environmental Site Assessment Update Mar Com North for Port of Portland, dated 06/14/06. | 1235927 |
3/17/2006 | Transmittal sheet with attached Revised Copies of Figures for the Technical Memorandum "Relationships Between Upland Shallow Groundwater Plumes and the City Stormwater and Combined Conveyance System within the Portland Harbor". | 1244937 |
2/13/2006 | Atlantic Richfield Company – PRP information summary, Portland Harbor superfund site study area. | Not Applicable |
| Letter regarding Source Control Evaluation Work Plan Stormwater (attachment). | 1254360 |
| Letter transmitting a fully executed Site Sediment Sampling and Access Agreement for BP West Coast Products. | 1198024 |
7/1/2004 | Letter transmitting Portland Harbor Superfund site, Oregon Department of Lands lease information. | 1198074 |
5/28/2004 | Letter recommending approval of ARCO/BP's proposed interim action - Bulk Terminal 22T, with attached report: Staff Report - Recommended Source Control Measure BP Bulk Terminal 22T. | 1185850 |
5/26/2004 | Letter transmitting certificates of insurance and a copy of insurance policies for the Lower Willamette Group's contractors. | 1198078 |
5/7/2004 | Source Control Decision for the Linnton Plywood Association Facility/Columbia Sand and Gravel Facility at 10504 NW St. Helens Road, Portland OR, ECSI Nos. 2351 and 2373. | 1185855 |
3/19/2004 | Final Programmatic Source Control - Remedial Investigation Work Plan for the City of Portland Outfalls Project, with report on CD-ROM. | 1185819 |
| Phase II Stage 1 & 2 In-River Groundwater and Sediment Investigation Report, Volume 2 - Appendix B Part 1. | 1185814 |
9/19/2003 | E-mail regarding a 8/29/03 review of DEQ's 8/1/03 Source Control Decision (SCD) for the Linnton Plywood Association (LPA) site. | 1185953 |
8/1/2003 | Letter regarding the Linnton Plywood Association Facility, 10504 NW St. Helens Road, Portland Oregon. | 1185447 |
| Final Remedial Investigation Report Vol. II, ARCO BP Terminal 22T. | 1187091 |
10/3/2002 | Final Remedial Investigation Report Vol. I, ARCO BP Terminal 22T. | 1187090 |
10/1/2002 | Remedial Investigation: Kinder Morgan Liquid Terminals, Linnton Facility. | 1187442 |
9/11/2002 | Draft Scoping Document for Source Control Measures, ARCO BP Terminal 22. | 1187089 |
8/5/2002 | Supplemental response letter to comments on the draft RI report, BP Terminal 22T. | 1187088 |
6/21/2002 | Comments on draft Remedial Investigation Report for BP Terminal 22T. | 1187087 |
6/21/2002 | Letter discussing source control measures at BP Terminal 22T. | 1187086 |
2/1/2002 | Pre-Remedial Investigation Assessment Report: Linnton Plywood Association. | 1188572 |
1/17/2002 | Letter transmitting the Lloyd's London insurance policy for Striplin Environmental Associates, Certificate of Liability Insurance for Windward Environmental and Professional Insurance Coverage for Windward Environmental. | 1198077 |
| Letter transmitting certificates of insurance and insurance policies for Striplin Environmental Associates and Anchor Environmental. | 1198076 |
10/3/2001 | Beneficial Water-Use Determination, ARCO Terminal 22T. | 1187085 |
9/6/2001 | Comments on the 7/31/01 Preliminary Beneficial Water-Use Determination (BWUD) and Locality of Facility (LOF) for ARCO Terminal 22T. | 1187084 |
| Response to 12/8/00 General Notice Letter regarding the Portland Harbor Superfund Site, Portland Oregon: ARCO. | 1185569 |
12/15/2000 | Preliminary Evaluation of City Outfalls, Portland Harbor Study Area, Notebook 2: Westshore Stormwater and CSO Outfalls. | 1188200 |
3/31/2000 | Portland Harbor State Deferral Demonstration Package | 1081710 |
9/10/1999 | Letter providing information on the Portland operation requested by DEQ. | 1187187 |
7/27/1999 | Notice that DEQ has completed review of available file information on GATX St. Helens Road (Linnton) Facility (Site Assessment Strategy Recommendation attached). | 1187443 |
11/28/1990 | Environmental Site Assessment. | 1188544 |