 Site Type: Long Term/National Priorities List (NPL) Click to see more about Site Type and how it is used?

  SYLVESTER


Map this site in Cleanups in My Community
 Nashua,  New Hampshire
 Hillsborough County
 Street Address: GILSON RD
 Zip Code: 03062
 Congressional
 District(s):

02
 EPA ID #: NHD099363541
 Site ID #: 0101115
 Site Aliases: Gilson Road Site

 Site Responsibility: Federal, State

 NPL LISTING HISTORY
 Proposed Date 10/23/1981
 Final Date 09/08/1983

Site Description
[Back to Top]

The 28-acre Sylvester hazardous waste dump site is located in a rural, residential area of Nashua, New Hampshire. The site was operated as a sand borrow pit for an undetermined number of years. During the late 1960s, after much of the sand had been removed from the property, the owner began an illegal waste disposal operation within a six-acre portion of the site apparently intending to fill the excavation. Household refuse, demolition materials, chemical sludges, and hazardous liquid chemicals were dumped at the site. The household refuse and demolition materials usually were buried, while the hazardous liquids were allowed to percolate into the ground adjacent to the old sand pit or were stored in steel drums that were placed on the ground. Approximately 1,000 people live in an adjoining mobile home park. The site is adjacent to Lyle Reed Brook, which flows through the trailer park and enters the Nashua River, a source of drinking water. The Merrimack River is 11 miles downstream and is also a source of drinking water.

Threats and Contaminants
[Back to Top]

The illegal waste disposal activity at the site was first discovered in late 1970. The first indication that liquid hazardous wastes were being dumped occurred in 1978, when State personnel observed drums being stored at the site. Prior to 1979, the site operator discarded refuse and demolition debris in the mined portion of the site. In 1979, available information shows that approximately 1,300 55-gallon drums containing hazardous waste material were disposed at the site. Records discovered during investigation at the site also indicate that over 800,000 gallons of liquid hazardous wastes were discharged into a leach field at the site between January and October 1979. A court order was issued in late 1979 prohibiting all future disposal of hazardous wastes on the site.

Cleanup Approach
[Back to Top]

EPA and the State have performed cleanup actions to contain and treat contaminated soils and ground water at the site. Barriers to prevent access to the site and to abate the migration of contaminated ground water have also been installed.

Response Action Status
[Back to Top]

Immediate Actions In 1979, the State removed 1,000 drums from the site. In early 1980, the EPA built a fence around the disposal area and removed 1,314 accessible drums found at the surface. The movement of the ground water contaminant plume was monitored and an access road was built. Between 1981 and 1982, the EPA installed a ground water interception and recirculation system to temporarily pump and recirculate the contaminated ground water to prevent it from reaching Lyle Brook and from further contaminating the aquifer. The City of Nashua extended municipal water to the area surrounding the site in 1983.

Slurry Wall/Cap The State built a slurry wall surrounding a 20+ acre area and an impervious membrane cap to prevent any further migration of the contamination to on-site ground water.

Ground water Treatment In 1986 the State built a treatment facility to remove toxic substances in the ground water within the slurry wall. The 300-gallon-per-minute treatment process consisted of a combination of physical, chemical, and biological treatments. The process involved pumping the ground water from within the slurry wall containment area and treating it via filtration and air-stripping to remove contaminants. The contaminants were then destroyed by incineration. The treated water was injected into the aquifer to control ground water migration.
In addition, a vacuum extraction system was installed to clean up the large amounts of toluene in the ground water and soils in the southern portion of the site.
Active ground water treatment was completed in early 1996 after the EPA and State determined that the concentration of contaminants in ground water were below the cleanup levels established in the selected cleanup remedy. During the ten year period of operation, the treatment plant handled nearly 1 billion gallons of water and removed and destroyed over 216 tons contaminants from the ground water. The State is continuing to perform periodic monitoring at the site.


Sediment Assessment In 2005, a limited area was found to contain arsenic-contaminated sediments in a stream/wetlands area adjacent to the capped area of the site. Subsequent sampling has found that the concentrations in the sediments warrant continued monitoring but that no immediate action is required. The State has posted the area to inform the public of the potential exposure to this limited sediment area.

Enforcement HighlightsSeveral Consent Decrees were entered into by the EPA, the State, and numerous potentially responsible parties requiring the reimbursement of past costs and the implementation of the cleanup actions at the site.

Environmental Progress
[Back to Top]

Construction of all cleanup remedies at the site have been completed. Removing the drums, installing a fence, supplying public drinking water, capping the 20+ acre disposal area and enclosing it with a 100-foot deep slurry wall and pumping-and-treating ground water for 10-years have reduced the risk of exposure to hazardous materials at the site. In September 2009, the fourth Five Year Review for the site was performed, and it was determined to be protective of human health and the environment. Groundwater monitoring will continue until at least 2014 to ensure the continued effectiveness of the cleanup.

Current Site Status
[Back to Top]

In early 2000, the New Hampshire Department of Environmental Service (NHDES) implemented institutional controls on the property to ensure that the ground water would not be used. During 2009, monitoring of the groundwater continued at and surrounding the site. Sporadic exceedences of the cleanup levels have still been observed; however, the ground water at or near the site is not being used for drinking water purposes and municipal water is provided to the surrounding area. Ground water monitoring will continue by the State on a periodic basis (expected to be annual monitoring). An Explanation of Significant Differences (ESD) was signed by EPA in September 2002 which documents an adjustment to the alternative cleanup limits (ACLs) for two groundwater contaminants at the site. EPA issued a fourth Five-Year Review on September 14, 2009. That Five-Year Review found the Site to be protective of human health and the environment in the short-term, but identified that the following recommendations needed to be performed:

1. Modify the existing monitoring well network and sampling and analysis plan.
2. Expand the existing Groundwater Management Zone (GMZ) for the Site.
3. Perform a vapor intrusion assessment to determine the potential exposure to indoor air.
4. Evaluate the effectiveness of the cap and slurry wall.

Site Photos
[Back to Top]

SDMS 452956
The former Treatment Plant building from the North (on top of the capped area).

SDMS 452957
Looking north towards the trailer park and Nashua River from on top of the capped area.

Links to Other Site Information
[Back to Top]
Disclaimer Instructions about PDF

Newsletters & Press Releases:
Press Releases about this project  

Federal Register Notices:
Final NPL Listing  

Reports and Studies:
Five Year Review Report, September 22, 1994 (251 KB)  
Second Five Year Review Report, September 30, 1999 (923 KB)  
Third FiveYear Review Report, September 17, 2004 (506 KB)  
Fourth Five Year Review Report, September 14, 2009 (Initial file is 23.7 MB with link to additional PDF)  
Final Report: Technical Assistance for the Gilson Road Superfund Site, Nashua, New Hampshire - MAROS Evaluation, September 2009 (2.55 MB)  
Fifth Five Year Review Report, September 4, 2014 (2.41 MB)  

Decision Documents:
View Records of Decision (RODS) on-line (EPA HQ)  
Explanation of Significant Differences, September 23, 2002 (82KB)  
Institutional Controls at this Site  
Sediment Institutional Controls, February 22, 2007 (195 KB)  

Settlement Documents:
Disposition of Property, November 10, 2003 (399KB)  

Other Links:
NPL Site Narrative at Listing:  
Site Progress Profile  

Site Repositories
[Back to Top]

New Hampshire Department of Environmental Services, 29 Hazen Drive, Concord, NH 03302

OSRR Records and Information Center, 1st Floor, 5 Post Office Square, Suite 100 (HSC), Boston, MA 02109-3912 (617) 918-1440


Contacts
[Back to Top

EPA Remedial Project Manager: Darryl Luce
Address: US Environmental Protection Agency
5 Post Office Square, Suite 100
Mail Code OSRR07-1
Boston, MA 02109-1367
Phone #: 617-918-1336
E-Mail Address: luce.darryl@epa.gov

EPA Community Involvement Coordinator: Rodney Elliott
Address: US Environmental Protection Agency
New England Regional Laboratory
11 Technology Drive
Chelmsford, MA 01863-2431
Phone #: 617-918-8372
E-Mail Address: elliott.rodney@epa.gov

State Agency Contact: Andrew Hoffman
Address: NHDES 29 Hazen Drive, PO Box 95
Concord, NH 03302-0095
Phone #: 603-271-6778
E-Mail Address: andrew.hoffman@des.nh.gov

 


Serving Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont, & 9 Tribal Nations
 
Begin Site Footer

EPA Home | Privacy and Security Notice | Contact Us

Last updated on Tuesday, September 9th, 2014
URL: http://www.epa.gov/region1/superfund/sites/sylvester